Minor Franchise Permit: MFP21000507
IVR Number: 21000507
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/02/2021Application Date:0188800270Parcel Number: 3446 SE 18TH ST
Permit Type:02/18/2021Issue Date:Franchise
Permit Work Class:02/18/2022Expiration Date:Minor Utility
Job Number: 101135697Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO INSTALL NEW XF AT V01. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
SONG JEROME DOHAN & SO YOUN 3446 SE 18TH STREET
RENTON , WA 98058
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP21000507
Scott Warlick CED 2/18/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
V
0
1
V0
21313
W20-7AROAD
WORK
AHEA
D W20-1W20-4ONE LA
N
E
ROAD
AHEAD
1
0
0
'
1
0
0
'
1
0
0
'
W2
0
-
7
AROADWORKAHEADW2
0
-
1
W2
0
-
4 ONE LANEROADAHEAD100'
100
'
100'
STOP
FLAGGER
STOP
FLAGGER
FROM TOTOW A
W
A
Y
A
RE
A
PHON
E
8
8
8-
9
9
9
9
INFR
A
S
O
U
R
C
E
L
L
C
0
00
00
0
0
0
00
NO PAR
KIN
G
NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
13 13
S
E
1
8
T
H
S
T
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TRENCH
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB101135697
3446 SE 18th St, Renton, WA 98058
1/21/21
KALI-JAMAL.COLLINS@PSE.COM
425-424-6425
SHEET 1 of 1
MFP21000507
EIB801
12-17-20 PER ANNETTE WILSON CELL 425-766-3891:
NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D
CORE HOURS, LOCATES, OUTAGE REQ'D ON FOUR RESIDENTIAL CUSTOMERS, VAC TRUCK, BACKHOE
PROBLEM: CORRECTING FOR LOW VOLTAGE TO RESIDENCES.
SEQUENCE OF WORK AS FOLLOWS:
AT V01 AT NEW GRID 317191-166920:
-REMOVE EXISTING SECONDARY PEDESTAL
FROM V02 TO V01:
-PULL OUT EXISTING 350MCM SECONDARY FROM EXISTING 3-INCH CONDUIT APPROX 105 FEET
-PULL IN NEW 1/0 15KV PRIMARY CABLE APPROX 105 FEET (CABLE# EIB801)
FROM V01 TO 3446 SE 18TH ST:
-PULL OUT EXISTING 4/0 TPLX FROM EXISTING 3-INCH CONDUIT APPROX 55 FEET
-PULL IN NEW 350MCM TPLX THROUGH EXISTING 3-INCH CONDUIT APPROX 55 FEET & SPLICE TO
EXISTING 1/0 TPLX SVC GOING TO 3446 SE 18TH ST.
-RESTORE LANDSCAPING AT THE CORNER
AT V01:
-EXCAVATE & INSTALL NEW MINIPAD HANDHOLE AND 75KVA 1-PHASE PADMOUNT PER STD 6045.1010
FIG'S 1 & 2
-RECONNECT FOUR EXISTING SERVICES TO 3440, 3446, 3433, AND 3439 SE 18TH ST.
-INSTALL LOADBREAK ELBOW AT V01 AND V02
-RESTORE LANDSCAPING TO ORIGINAL CONDITION ON 3440 SE 18TH ST.
-RESTORE SYSTEM TO NORMAL WITH SYSTEM OPERATOR
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 108126035
N/A 594140290
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101135697N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
A. WILSON 253-395-6913 01/05/20
A. WILSON 253-395-6913 01/05/20
T.LAKE 714-822-4346 01/05/20
N/A RENTON
ROL-16 / 3446 SE 18TH ST
ADD XFMR TO SYSTEM
3446 SE 18TH ST, RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
-
101135697
AS NOTED 1/1
KING QCSOKE
SE 21-23N-05E
2305E084 2305E088 ROL-162305E084
N/A 101135697
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:ANNETTE WILSON
425-766-3891
ANNETTE.WILSON@PSE.COM
THOMAS GUIDE
656-F5
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E088
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50' MAP#: 2305E084
SITE MAP - UNIVERSAL MAP
SCALE: 1" = 50' MAP#: 2305E084
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
PRIMARY CABLE TABLE - INSTALL
LOCATION CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO QT
Y.
BENDS
PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CABLE
V02 V01 1 1/0 100 EIB801
TOTAL 100
425-766-3891 01/05/20
425-766-3891 01/05/20
CIRCUIT FEET ADDED: NONE
Annette Wilson
Annette Wilson
JOB SITE
Installed at site:
Grid Number:
Foreman to redline the following information
PMH-9 INSTALLATION
Company ID#:
V01
317191-166904
MFP21000507
RESTORATION PER CITY OF RENTON STANDARDS