HomeMy WebLinkAboutContract Agreement
THIS AGREEMENT (“Agreement”) is made as of the _____ day of ________, 202 ,
(the “Effective Date”) by and between the City of Renton, a non-charter code city under
RCW 35A, and a municipal corporation under the laws of the State of
Washington (“Renton”), through its Community Services Department and
, (“Contractor”), who are collectively referred to as the “Parties”, to
provide tree services Renton and Contractor agree as set forth below.
Scope of Services: Contractor will provide all material and labor necessary to perform all
work described in the Proposal which is attached and fully incorporated into this
Agreement by reference as Attachment “A.”
Changes in Scope of Services: Renton, without invalidating this Agreement, may order
changes to the Scope of Services consisting of additions, deletions or modifications, the
Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes
in the work shall be authorized by written Change Order signed by the Parties.
Time of Performance: Contractor shall commence performance of the Agreement no later
than 30 calendar days after the Agreement’s Effective Date.
Term of Agreement: The Term of this Agreement shall end at completion of the Scope of
Services, no later than , 202 from the Effective Date. This Agreement may be
extended to accomplish change orders, if required, upon mutual written agreement of
Renton and Contractor.
Termination:
The City reserves the right to terminate this Agreement at any time, with or without
cause by giving ten (10) calendar days’ notice to the Contractor in writing.
In the event this Agreement is terminated by the City, the Contractor shall be entitled
to payment for all hours worked to the effective date of termination, less all payments
previously made. If the Agreement is terminated by the City after partial performance
of Work for which the agreed compensation is a fixed fee, the City shall pay the
Contractor an equitable share of the fixed fee. This provision shall not prevent the City
from seeking any legal remedies it may have for the violation or nonperformance of
any of the provisions of this Agreement and such charges due to the City shall be
deducted from the final payment due the Contractor. No payment shall be made by
the City for any expenses incurred or work done following the effective date of
termination unless authorized in advance in writing by the City.
CAG-21-035
1st
PAGE 2 OF 9
Agreement Sum: The total amount of this Agreement is the sum of
which includes Washington State Sales Tax. This amount may be adjusted to a mutually
agreed amount based on changes to the Scope of Services.
Consideration: In exchange for Contractor’s performance of the items and responsibilities
identified in the Scope of Services, Renton agrees to make payment of the amount
identified as the Agreement Sum.
Method of Payment/ Retainage/ Bonding: Payment by Renton for the Services will only
be made after the Services have been performed and a voucher or invoice is submitted
in a form acceptable to Renton.
For Agreements over $150,000:
Pursuant to RCW 60.26 and 39.08 The City requires a 5 % Retainage be
withheld and that the Contractor will provide a Performance and Payment
(Contract) Bond on the City approved form upon execution of theAgreement.
Payment of the initial95% will be made in the next pay cycle of the Renton
Finance Department after receipt of such voucher or invoice (pay cycles are bi-
weekly). The remaining 5%will be retained for the purpose of completion of
the project and fulfillment of claims and liens.
For Agreements under $150,000
Pursuant to RCW 60.26 and 39.08 The City requires a 5 % Retainage be withheld
and that the Contractor will provide a either a Performance and Payment
(Contract) Bond on the City approved form upon execution of the Agreement
or waive the payment and performance bond and instead the City will retain
10%. Payment of the initial 95% will be made in the next pay cycle of the Renton
Finance Department after receipt of such voucher or invoice (pay cycles are bi-
weekly). Theremaining 5% will be retained for the purpose of completion of
the project and fulfillment of claims and liens. (Unless the contractor waives
the payment and performance bond below and opts for a 10% retainage below.)
Contractor must pick one – if contractor does not pick one then 5% with contract
bond is required:
_______ To provide a payment and performance bond (contract bond) in the
amount of 100% of the estimate including taxes with a 5% retainage.
or
PAGE 3 OF 9
_______ To waive a payment and performance bond (contract bond) and
instead the city will retain the remaining 10% will be retained for the
purpose of completion of the project and fulfillment of claims and liens.
C.For limited Public Works Contracts under $35,000
For limited public works projects, the City chooses to waive the payment and
performance bond requirements of chapter 39.08 RCW and the retainage
requirements of chapter 60.28 RCW, for laborers, mechanics, subcontractors,
materialpersons, suppliers, and taxes imposed under Title 82 RCW that may be due
from the contractor for the limited public works project, however The City shall
have the right of recovery against the contractor for any payments made on the
contractor's behalf.
D. Renton shall have the right to withhold payment to Contractor for any work not
completed in a satisfactory manner until such time as Contractor modifies such
work so that the same is satisfactory.
E. Final Acceptance. Final Acceptance of the Project occurs when the Public Works
Director has determined that the Project is one hundred percent (100%) complete
and has been constructed in accordance with the Plans and Specifications.
F. Payment in the Event of Termination. In the event this Contract is terminated by
the either party, the Contractor shall not be entitled to receive any further amounts
due under this Contract until the work specified in the Scope of Services is
satisfactorily completed, as scheduled, up to the date of termination. At such time,
if the unpaid balance of the amount to be paid under the Contract exceeds the
expense incurred by the City in finishing the work, and all damages sustained by
the City or which may be sustained by the City or which may be sustained by the
reason of such refusal, neglect, failure or discontinuance of Contractor performing
the work, such excess shall be paid by the City to the Contractor. If the City’s
expense and damages exceed the unpaid balance, Contractor and his surety shall
be jointly and severally liable therefore to the City and shall pay such difference to
the City. Such expense and damages shall include all reasonable legal expenses
and costs incurred by the City to protect the rights and interests of the City under
the Contract.
9. Hold Harmless: Contractor shall indemnify, defend and hold harmless Renton, its elected
officials, officers, agents, employees and volunteers, from and against any and all claims,
losses or liability, or any portion of the same, including but not limited to reasonable
attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons,
including injuries, sickness, disease or death of Contractor’s own employees, agents and
volunteers, or damage to property caused by Contractor’s negligent act or omission,
PAGE 4 OF 9
except for those acts caused by or resulting from a negligent act or omission by Renton
and its officers, agents, employees and volunteers.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
contractor and Renton, its officers, officials, employees and volunteers, Contractor’s
liability shall be only to the extent of Contractor’s negligence.
It is further specifically and expressly understood that the indemnification provided in this
Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act,
RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually
negotiated and agreed to this waiver. The provisions of this section shall survive the
expiration or termination of this Agreement.
10. Insurance: Contractor shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B. Professional liability insurance, in the minimum amount of $1,000,000 for each
occurrence, shall also be secured for any professional services being provided to
Renton that are excluded in the commercial general liability insurance.
C. Workers’ compensation coverage, as required by the Industrial Insurance laws of
the State of Washington, shall also be secured.
D. It is agreed that on Contractor’s commercial general liability policy, the City of
Renton will be named as an Additional Insured on a non-contributory primary basis.
Renton’s insurance policies shall not be a source for payment of any Contractor
liability.
E. Subject to Renton’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to Renton before executing the work of
this Agreement.
F. Contractor shall provide Renton with written notice of any policy cancellation,
within two (2) business days of their receipt of such notice.
11. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Contractor agrees as follows:
PAGE 5 OF 9
A. Contractor, and Contractor’s agents, employees, representatives, and volunteers
with regard to the services performed or to be performed under this Agreement,
shall not discriminate on the basis of race, color, sex, religion, nationality, creed,
marital status, sexual orientation or preference, age (except minimum age and
retirement provisions), honorably discharged veteran or military status, or the
presence of any sensory, mental or physical handicap, unless based upon a bona
fide occupational qualification in relationship to hiring and employment, in
employment or application for employment, the administration of the delivery of
services or any other benefits under this Agreement, or procurement of materials
or supplies.
B. The Contractor will take affirmative action to insure that applicants are employed
and that employees are treated during employment without regard to their race,
creed, color, national origin, sex, age, sexual orientation, physical, sensory or
mental handicaps, or marital status. Such action shall include, but not be limited
to the following employment, upgrading, demotion or transfer, recruitment or
recruitment advertising, layoff or termination, rates of pay or other forms of
compensation and selection for training.
C. If Contractor fails to comply with any of this Agreement’s non-discrimination
provisions, Renton shall have the right, at its option, to cancel the Agreement in
whole or in part.
D. Contractor is responsible to be aware of and in compliance with all federal, state
and local laws and regulations that may affect the satisfactory completion of the
project, which includes but is not limited to fair labor laws and worker's
compensation.
12. Independent Contractor: Contractor’s employees, while engaged in the performance of
any of Contractor’s services under this Agreement, shall be considered employees of the
Contractor and not employees, agents, representatives of Renton and as a result, shall not
be entitled to any coverage or benefits from the City of Renton. Contractor’s relation to
Renton shall be at all times as an independent contractor. Any and all Workman’s
Compensation Act claims on behalf of Contractor employees, and any and all claims made
by a third-party as a consequence of any negligent act or omission on the part of
Contractor’s employees, while engaged in services provided to be rendered under this
Agreement, shall be the solely Contractor’s obligation and responsibility.
13. City of Renton Business License: The Consultant shall obtain a City of Renton Business
License prior to performing any Work and maintain the business license in good standing
throughout the term of this agreement with the City.
PAGE 6 OF 9
Information regarding acquiring a city business license can be found at:
http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882
Information regarding State business licensing requirements can be found at:
http://dor.wa.gov/doing-business/register-my-business
14. Prevailing Wage Rates:Prevailing Wage Rates: Contractor must comply with the State of
Washington prevailing wage requirements. Contractor must file an Intent To Pay
Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end
of the project with the Washington State Department of Labor and Industries.
The State of Washington prevailing wage rates applicable for this project, which is
located in King County, may be found at the following website address of the
Department of Labor and Industries:
http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp
http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp
Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage rates
paid for the duration of this contract shall be the date the contract is executed as
reflected in the “Effective Date” identified at the top of the first page of this Agreement.
Upon request, the City will provide a copy of the applicable prevailing wages for this
project. Alternatively, the rates may be viewed at the City of Renton City Hall by making
an appointment with the contact person identified herein or prior to contract award with
the contact person identified as the City of Renton contact in Paragraph 17 Notices of
this agreement.
15. Record Keeping and Reporting: Contractor shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Services provided in the
performance of this Agreement. The Contractor agrees to provide access to and copies of
any records related to this Agreement as required by the City to audit expenditures and
charges and/or to comply with the Washington State Public Records Act (Chapter 42.56
RCW).
16. Public Records Compliance. To the full extent the City determines necessary to comply
with the Washington State Public Records Act, Contractor shall make a due diligent search
of all records in its possession, including, but not limited to, e-mail, correspondence,
notes, saved telephone messages, recordings, photos, or drawings and provide them to
the City for production. In the event Contractor believes said records need to be protected
from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor
shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees,
PAGE 7 OF 9
attendant to any claim or litigation related to a Public Records Act request for which
Contractor has responsive records and for which Contractor has withheld records or
information contained therein, or not provided them to the City in a timely manner.
Contractor shall produce for distribution any and all records responsive to the Public
Records Act request in a timely manner, unless those records are protected by court order.
17. Other Provisions:
A.Administration and Notices. Each individual executing this Agreement on behalf
of Renton and Contractor represents and warrants that such individuals are duly
authorized to execute and deliver this Agreement on behalf of Renton or
Contractor. Any notices required to be given by the Parties shall be delivered at
the addresses set forth below. Any notices may be delivered personally to the
addressee of the notice or may be deposited in the United States mail, postage
prepaid, to the address set forth below. Any notice so posted in the United States
mail shall be deemed received three (3) calendar days after the date of mailing.
This Agreement shall be administered by and any notices should be sent to the
undersigned individuals or their designees.
CITY OF RENTON
Ian Gray, Urban Forester
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-6601
igray@rentonwa.gov
Fax: (425) 430-6603
CONTRACTOR
Phone:
E-mail Address
B.Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
C.Assignment and Subcontract. Contractor shall not assign or subcontract any
portion of this Agreement without the City of Renton’s prior express written
consent.
D.Compliance with Laws. Contractor and all of the Contractor’s employees shall
perform the services in accordance with all applicable federal, state, county and
city laws, codes and ordinances. A copy of this language must be made a part of
any contractor or subcontractor agreement.
PAGE 8 OF 9
E.Conflicts. In the event of any inconsistencies between contractor proposals and
this contract, the terms of this contract shall prevail.
F.Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington.
G.Joint Drafting Effort. This Agreement shall be considered for all purposes as
prepared by the joint efforts of the Parties and shall not be construed against one
party or the other as a result of the preparation, substitution, submission or other
event of negotiation, drafting or execution.
H.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce
or interpret this Agreement or any of its terms or covenants shall be brought in the
King County Superior Court for the State of Washington at the Maleng Regional
Justice Center in Kent, King County, Washington, or its replacement or successor.
I.Severability. A court of competent jurisdiction’s determination that any provision
or part of this Agreement is illegal or unenforceable shall not cancel or invalidate
the remainder of this Agreement, which shall remain in full force and effect.
J.Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
K.Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement
will be for the sole and exclusive benefit of the Parties and no one else.
L.Waivers. All waivers shall be in writing and signed by the waiving party. Either
party’s failure to enforce any provision of this Agreement shall not be a waiver and
shall not prevent either Renton or Contractor from enforcing that provision or any
other provision of this Agreement in the future. Waiver of breach of any provision
of this Agreement shall not be deemed to be a waiver of any prior or subsequent
breach unless it is expressly waived in writing.
(approved via email from Cheryl Beyer)
City of Renton Community Services Department Tree Maintenance Services
Attachment A – Scope of Work
City of Renton Community Services Department
Tree Maintenance Services Attachment A – Scope of Work
Project Manager: Ian Gray, Urban Forestry and Natural Resources Manager
Contact Information: igray@rentonwa.gov; 425-430-660 (Monday to Friday; :00 –:00 )
Introduction
The City of Renton requests tree maintenance services at address locations around the city. The
work includes the removal of selected trees, stump s, pruning of trees
. Please see the attached t for address and . All trees for
removal marked by the City using a white paint spot at the base of tree.
Additional requirements of the work are included below. It is your responsibility to read these
requirements thoroughly and to become familiar with each site location and the work assigned.
Please use the spreadsheet to submit your lump sum costs by filling out your name, address and
phone number and total costs on the form provided on the last page of the spreadsheet. Please return
all sheets to have your bid
considered. Bids are due by 5:00 P.M., 20 .
Time of Performance
Minimum Requirements of Contractor
Renton Business License, registered contractor with the State of Washington, current State
Unified Business Identifier Number
Proof of Insurance - Minimum amounts to be approved in advance by City Risk Management.
Includes General Liability, Automobile Liability, Workers Compensation and Employers’ Liability.
Include with the first invoice the company’s intent to pay prevailing wage rates and submit the
affidavit to pay prevailing wage rates at the completion of the contract with the final invoice.
Labor rates shall be Prevailing Wage Rates for the industry.
All personnel shall wear the most up-to-date personal protective equipment including but not
limited to safety vests and hard hats while on the job site
Use of traffic control equipment which meets the Manual of Traffic Control Devices
requirements for each job location
Possess the equipment and experience in lowering tree parts using ropes and other devices to
prevent damage to turf, plants, irrigation, sidewalks, curbs, streets, signs, benches, fences and all
other structures.
Locations left incomplete at the end of the work day shall be barricaded to access from the public
.
red Qualifications of Contractor and Tree Workers
International Society of Arboriculture (ISA) Certified Arborist
Familiarity with and adherence to:
o American National Standard for Arboricultural Operations – Safety Requirements, ANSI
Z133.1-2006 or newer.
o American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant
Management – Standard Practices (Pruning), ANSI A300 (Part I) - 2008 or newer.
o
Project Area Specifications – Prior to Beginning Work
Traffic Control Plan Approval – please see http://rentonwa.gov/living/default.aspx?id=880.
On-site meeting with the Project Manager or representative to review operations, public safety
plan and traffic control plan.
Tree Locations – to view the trees in Renton’s Tree Inventory: Rentonwa.gov/How Do I?/Find/Map &
GIS Data, then select Tree Inventory. Search by address or parcel number, zoom to see details. Note
Tree Removal Specifications
Contractor shall be responsible for contacting locating services in advance of stump grinding work
by calling 811.
Contractor must have staff that are line clearance certified or have access to line clearance certified
personnel for locations indicated on the spreadsheet.
Removal includes the complete removal of all tree-related debris generated by the activity
including litter, sawdust, chips, soil debris, twigs, leaves, needles, buds, branches, trunks, stumps,
and surface roots, unless indicated otherwise.
Where debris is indicated to remain on site, stump heights and branches shall be no higher than 12
inches above grade. All tree stems and trunks shall lie flat on the ground.
Stumps and surface roots shall be ground to a minimum depth of 9 inches below existing grade, if
no curb and sidewalk, or sidewalk grade when present. Stump and roots should not be visible in
turf and along curbs and sidewalks, following grinding. Hand grubbing is required to remove roots
too close to hard surfaces for grinding equipment.
surrounding
grades until such debris can be removed and replacement soil added.
Stump debris shall be completely removed from the resulting holes, replaced with high quality
topsoil (less than 3% organic matter), graded to match existing grades, lightly compacted, and the
area seeded. Soil should be lightly raked to mix with seed and a high quality compost product
broadcast lightly over the seed to cover.
Only official company personnel may enter the work site. Contractor is solely responsible for
preventing others entering the work site especially those seeking to take wood
All contractor activities, staff, and equipment shall work from the street right-of-way or City- owned
property and not enter upon private property unless approved in advance by the Manager and the
property owner.
Use of cranes or other heavy equipment shall be approved by the Project Manager in advance of
submitting bids.
The use of materials (e.g. mats) that eliminate or minimize site damage is required.
Use of ropes to lower tree sections are required in order to prevent unnecessary damage to turf,
plants, adjacent trees, all street, park or facility infrastructure and private property. Time and
materials to repair damage from operations where tree parts were not safely lowered using ropes
or other devices shall not be reimbursable.
All depressions created as the result of operations shall be made level with existing grades using
high quality topsoil and seeded or sodded and top-dressed with a high quality compost product.
Repairs shall be to pre-existing conditions or better. The Project Manager will determine the
extent of repairs from damage as a result of tree maintenance activities.
Damage that occurs as a direct result of contractor actions or inaction is the sole responsibility of
the contractor.
Tree Pruning Specifications
Only an ISA Certified Arborist shall prune trees. Non-certified workers are prohibited from
pruning trees.
Minimum height following pruning shall provide for the following:
o Street and Pathway – not less than 15 feet over the roadway
o Clearance pruning around signs should provide unobstructed view to sign
for the next 5 years.
Pruning cuts shall be made outside the branch bark ridge and branch collar. Cuts should be at an
angle of 45 degrees from the branch bark ridge.
No stub-cutting or heading of branches is permitted. Prune branches to branch nodes only.
Remove entire branches whenever possible or if lion-tailing will be the end result.
Do not prune more than 25% of the total live crown unless authorized by the City.
Pruning dead branches means to remove 100% of dead twigs and branches.
The use of spurs to access trees and gas-powered pole saws (stick saws) to make pruning cuts
are prohibited.
Use of ropes to lower tree sections should be considered in order to prevent unnecessary
damage to turf, plants, adjacent trees, netting, all street, park or facility infrastructure and private
property. Time and materials to repair damage from operations where tree parts were not safely
lowered using ropes or other devices shall not be compensated.
Repairs shall be to pre-existing conditions or better. The Project Manager will determine the
extent of repairs from damage as a result of tree pruning activities.
All depressions created as the result of operations shall be made level with existing grades using
high quality topsoil and seeded or sodded.
Full site and off-site clean-up similar to conditions prior to beginning work is required.
Damage that occurs as a direct result of contractor actions or inaction is the sole responsibility of
the contractor.
Pruning around street lights shall be performed with the end result that no branches are in the
way of lights shining to the ground in a triangular illumination pattern.
Special Conditions
Protect the public at all times using a combination of warning signs, barricades and company
staff to prevent access to work zones.
Clean, hardwood wood chips generated from operations can be dumped at a City designated
facility provided the Project Manager approves in advance; incidental leaves are acceptable.
Conifer chips are not allowed to be dumped at such facilities.
All wood debris shall be recycled to the fullest extent possible.
Use of mats or plywood is mandatory when soil conditions are wet.
The attached short form contract agreement is an example of the contract used to execute the
work.
Invoices
Invoices should be submitted to:
Ian Gray, Urban Forestry and Natural Resources Manager
Community Services Department, 6th Floor
1055 South Grady Way Renton,
WA 98057
Email: igray@rentonwa.gov
Telephone: 425-430-660
Invoices should contain the following information to prevent a delay in processing:
o Contractor name, address and telephone number
o Contract Number – assigned upon execution of agreement
o Unique Invoice Number
o Date work was performed
o Each address and location where work was performed
o Amount due, Washington sales tax and total amount due
Figure 1. Illumination Triangle Example – Distance on ground equals 30 feet from pole
City of Renton 2021 Priority Tree Maintenance ListTreatment DefinitionsTCP-Traffic Control Required with City of Renton Transportation Dept. based on street MPH & useStump Grinding: Grind at least 12" deep. Remove grindings. Add topsoil to grade. Add 3" of wood chips, or top dress with grass seed in turf strips.Structural Pruning: Reduce or remove codominant stems. Reduce end weight of over extending branches. Pruning for Clearance: 15 feet above street, 8 feet above sidewalk when leafed out. Prune all branches rubbed or broken by vehicles.Crown cleaning: Remove all sprouts, dead and crossing branches.Inspect for decay: provide UF with photos and written description of decay, or lack of, present.Address/Street Tree SpeciesDBHTree ID TreatmentCW WO Notes118032 120th Ave SE East of mailboxes.Port Orford cedar 14" 3775Tree removal. Leave low stump.62179Marked. Powerlines.216165 126th Ave SE-Cascade Park, west of 16143 126th Ave SEBlack Cottonwood 53"-multi 28380located West of 16143 126th Ave SE. Remove/reduce East stem.68640See Map. marked316165 126th Ave SE-Cascade ParkBlack Cottonwood 17" 30815See Map. Tree removal. Leave debris in 68641 marked411627 SE 164th StStump8510Grind stump. Remove grindings. Add 69149 Powerlines511627 SE 164th StPurple leaf plum 18"-multi8511Tree removal. Grind stump. Remove grindings. Add topsoil to grade. Top dress with grass seed.69150 Marked. Powerlines610619 SE 172nd St-on Benson Dr SBlack Cottonwood 7"26951Tree removal. Cut low stump. Remove all debris from ROW65026 Marked. TCP Benson Rd S710619 SE 172nd St-on Benson Dr SBlack Cottonwood 6" 26955Tree removal. Cut low stump. Remove all debris from ROW65026 Marked. TCP Benson Rd S810619 SE 172nd St-on Benson Dr SBlack Cottonwood 8" 26959Tree removal. Cut low stump. Remove all debris from ROW65026 Marked. TCP Benson Rd S910619 SE 172nd St-on Benson Dr SBig leaf maple 6" 26940Tree removal. Cut low stump. Remove all debris from ROW65026 Marked. TCP Benson Rd S103001 Mill Ave S-Benson Rd S ROWBlack Cottonwood 15" 27660Tree removal. Cut low stump. Leave large wood permitting does not impede ROW69416 Marked. Arrange access 113001 Mill Ave S-Benson Rd S ROWBlack Cottonwood 18" No IDTree removal. Cut low stump. Leave large wood permitting does not impede ROW.69416with homeowner121018 S 30th Ct-on Benson Dr SBlack Cottonwood 11" 32495Remove: low stump. See map67983Marked. TCP.132709 Mill Ave S-on Benson Dr SBlack Cottonwood 8" 4480Tree removal. Cut low stump. Remove all debris from ROW64892 Marked. TCP
City of Renton 2021 Priority Tree Maintenance List142709 Mill Ave S-on Benson Dr SBlack Cottonwood 17" 4483Tree removal. Cut low stump. Remove all 64892 Marked. TCP 152709 Mill Ave S-on Benson Dr SBlack Cottonwood 14" 9769Tree removal. Cut low stump. Remove all 64892 Marked. TCP 162709 Mill Ave S-on Benson Dr SBlack Cottonwood 18" 9691Tree removal. Cut low stump. Remove all 64892 Marked. TCP 172709 Mill Ave S-on Benson Dr SBlack Cottonwood 13" 9695Tree removal. Cut low stump. Remove all 64892 Marked. TCP 18601 S 23rd St-Teasdale ParkBig leaf maple 17" 162Tree removal. Cut stump low.Remove 62781 marked191450 Smithers Ave S-on S 15th StRed alder 19" No IDRemove: low stump68601 marked20 200 SW 19th St stump 7" 6021Grind stump. Remove grindings. Add topsoil to grade. Top dress with grass seed.68315 marked211120 SW 16th St-See photo for locationsBlack Cottonwood 18" No IDTree removal.Located in creek island. Leave debris in natural area.64656Not marked. TCP221120 SW 16th StBlack Cottonwood 17" No IDTree removal.Located in creek island. Leave debris in natural area.64656Not marked. TCP231120 SW 16th StBlack Cottonwood 17" No IDTree removal. Leave debris in natural area.64656Not marked. TCP241120 SW 16th StBlack Cottonwood 15" No IDTree removal. Leave debris in natural area.64656Not marked. TCP251120 SW 16th StBlack Cottonwood 12" No IDTree removal. Leave debris in natural area.64656Not marked. TCP261120 SW 16th StBlack Cottonwood 12" No IDTree removal. Leave debris in natural area.64656Not marked. TCP271120 SW 16th StBlack Cottonwood 13" No IDTree removal. Leave debris in natural area.64656Not marked. TCP
City of Renton 2021 Priority Tree Maintenance List281120 SW 16th StBlack Cottonwood 18" No IDTree removal. Leaning NE. Leave debris in natural area.64656Not marked. TCP291000 Oakesdale Ave SWNorway maple 13" 26436Tree removal. Grind stump. Remove grindings. Add topsoil to grade. Top dress with grass seed.65084Marked. TCP.30Springbrook Trail-Access from SW 7th St to KC South Treatment PlantRed alder 10" No IDReduce to safe wildlife snag height.64815Not marked. See Map.31Springbrook TrailRed alder10"No IDReduce to safe wildlife snag height.64815See Map32Springbrook TrailRed alder7"No IDReduce to safe wildlife snag height.64815See Map33Springbrook TrailRed alder12"No IDReduce to safe wildlife snag height.64815See Map34Springbrook TrailRed alder10"36525Reduce to safe wildlife snag height.64815See Map35Springbrook TrailRed alder26"13474Reduce to safe wildlife snag height.64815See Map36Springbrook TrailRed alder26"13475Reduce to safe wildlife snag height.64815See Map37701 SW Sunset BlvdBig leaf maple 42", multi 30160Powerlines. Remove south stem. Thin and raise north stem.67332marked with pink tape. TCP.38701 SW Sunset BlvdAm. Elm 45", multi No IDReduce south stem with cavity at base.67332marked with pink tape39701 SW Sunset BlvdHoneylocust 15" No IDReduce over-extending canopy.67332marked with pink tape408026 S Langston Rd-ROW S 132nd StBig leaf maple 16" multi 31873Removal, cut stump low.61349Marked. TCP.41300 Rainier Ave NLondon Planetree 26" 15523 Prune for clearance of street light trajectory, and any branches touching pole.66957TCP. See Map.42300 Rainier Ave NLondon Planetree 33" 15524 Prune for clearance of street light trajectory, and any branches touching pole.66957TCP. See Map.43300 Rainier Ave NLondon Planetree 28"15472Prune all branches 15 ft above street. 66971TCP. See Map.44225 Logan Ave SRed maple 13" 5677Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP
City of Renton 2021 Priority Tree Maintenance List45225 Logan Ave SRed maple 21" 5681Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 46225 Logan Ave SRed maple 19" 5682Prune branches 8-10 ft from building. Prune to improve structure of tree.64438 TCP 47225 Logan Ave SRed maple 17" 5683Prune branches 8-10 ft from building. Prune to improve structure of tree.64438 TCP 48225 Logan Ave SRed maple 19" 5684Prune branches 8-10 ft from building. Prune to improve structure of tree.64438 TCP 49225 Logan Ave SRed maple 19" 5685Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 50225 Logan Ave SRed maple 16" 995Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 51225 Logan Ave SRed maple 16" 996Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 52225 Logan Ave SRed maple 18" 997Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 53225 Logan Ave SRed maple 18" 998Prune to improve structure of tree by thinning and reduction of branches with included bark unions.64438 TCP 54903 Grant Ave SHorsechestnut 13" 24491Tree removal. Cut stump low. Remove debris.44482 see child WO 44483 Marked551915 Maple Valley Highway-across street Black Cottonwood 79"multi 18871Remove dead stem. Cut stump low. Remove debris.66184See Map. Marked. TCP561915 Maple Valley Highway-across street Black Cottonwood 22" 18872Tree removal. Cut stump low. Remove all debris.66184See Map. Marked. TCP573512 SE 6th StEnglish Hawthorn 19" 6827Prune branches 15 ft above street, 8 ft above sidewalk. Prune to improve 68603 Powerlines
City of Renton 2021 Priority Tree Maintenance List58 542 Olympia Ave SEJapanese flowering cherry14" 1951Tree removal. Grind stump. Remove grindings. Add topsoil to grade. Top dress with grass seed.66619 Marked. TCP593427 SE 7th StBig leaf maplemultiNo IDTree removal. Remove all debris.68604not marked603427 SE 7th StBig leaf maple multi No IDRemove all dead stems & branches. Reduce endwt from leaning stem.6860461233 Union Ave NE-Heritage ParkDouglas fir 16" 28517See map. Tree removal. Cut stump low.64890 marked623000 NE 4th St-across from 3033 NE 7th St, on Kirkland Ave NE. See Map.Austrian pine 17" 31529Tree removal. Cut low stump. Remove all debris from ROW 65635 Marked. See Map. TCP.633000 NE 4th St-across from 662 Jefferson Ave NE, on Kirkland Ave NE. See Map.Austrian pine 18" 31405Tree removal. Cut low stump. Remove all debris from ROW 65635 Marked. See Map. TCP.643000 NE 4th St-across from 617 Kirkland Ave NE. See Map.White ash 16" 31482Prune all branches 15 ft above street. Prune to improve structure of tree by thinning and reduction of branches with included bark unions.69336 Marked. See Map. TCP.653000 NE 4th St-across from 629 Kirkland Ave NE. See Map. Austrian pine 13" 31452Tree removal. Cut low stump. Remove all debris from ROW. Grind? 65635 Marked. See Map. TCP.663000 NE 4th St-across from 629 Kirkland Ave NE. See Map. Austrian pine 11" 31461Tree removal. Cut low stump. Remove all debris from ROW 65635 Marked. See Map. TCP.673000 NE 4th St-across from 629 Kirkland Ave NE. See Map. Austrian pine 15" 31470Tree removal. Cut low stump. Remove all debris from ROW 65635 Marked. See Map. TCP.683000 NE 4th St-across from 517 Kirkland Ave NE. See Map. Austrian pine 16" 31411Tree removal. Cut low stump. Remove all debris from ROW 65635 Marked. See Map. TCP.69170 Monterey Pl NE-on NE 3rd St. See Map. Big leaf maple 10" No IDTree removal. Cut low stump. Remove all debris from ROW 69151 Marked. See Map. TCP.
City of Renton 2021 Priority Tree Maintenance List704900 NE 1st St-ROW West of house (See Map)Black Cottonwood 39" No IDTree removal. Cut low stump. Remove all debris from ROW68612No vehicle access. Not marked. Arrange access with homeowner714900 NE 1st StBig leaf maple 55"-multi No IDPrune all dead and broken branches, Prune to improve structure of tree by thinning and reduction of branches. Remove ivy.68612No vehicle access.724900 NE 1st St-See mapBlack Cottonwood 39" No IDPrune all dead and broken branches, Prune to improve structure of tree by thinning and reduction of branches. Remove ivy.68615No vehicle access.734901 NE 1st St-See mapDouglas fir 34" No IDPrune all dead and broken branches, hangers.68615No vehicle access.744901 NE 1st St-See mapDouglas fir 18" No IDPrune all dead and broken branches, hangers.68615No vehicle access.754901 NE 1st St-See mapDouglas fir 20" No IDPrune all dead and broken branches, hangers.68615No vehicle access.764901 NE 1st St-See mapDouglas fir 26" No IDPrune all dead and broken branches, hangers.68615No vehicle access.774901 NE 1st St-See mapBlack Cottonwood 37" No IDPrune all dead and broken branches, hangers.68615No vehicle access.7814402 161st Ave SE-on SE 144th StDouglas fir 19" No IDRemove large wood. 69338unimproved ROW793409 NE 23rd PlRed maple 10" 2942Tree removal. Grind stump. Remove grindings. Add topsoil to grade. Top dress with grass seed.61986 marked801513 Dayton CtDeodar cedar 42" No IDPrune all dead and broken branches, and reduce end weight of large branches with included bark66840
City of Renton 2021 Priority Tree Maintenance List811815 NE 27th Ct- Natural area west of address.Black Cottonwood 30" 10865Reduce to a 12 ft wildlife snag. Leave debris dispersed in natural area.64130See map. Not marked. Arrange access with homeowner.822815 Burnett Ave N-on N 29th StJapanese maple 30"-multi No IDBrace multiple stems. Clean up prior pruning stubs/prune to improve structure. 66843835143 Ripley Lane N-East of Concrete Pipe-See Map.Black Cottonwood 24" 15238Remove tree. Cut stump low62734Powerlines. Not marked