CITY OF RENTON
AGENDA - City Council Regular Meeting
7:00 PM - Monday, March 1, 2021
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
Due to the COVID-19 pandemic, Councilmembers are attending this meeting remotely
through Zoom. Audience comments will be accommodated through Zoom, but the public is
requested to sign up for such testimony by calling 425-430-6501 or emailing
cityclerk@rentonwa.gov or jmedzegian@rentonwa.gov by 10 a.m. on the day of the meeting.
The public may also submit comments in writing to cityclerk@rentonwa.gov by 5 p.m. on the
day of the meeting.
For those wishing to attend by Zoom, please (1) click this link:
https://us02web.zoom.us/j/83533009277?pwd=ZjN4em5wakpnRi8xY3JGWTNYWVpJZz09 (or
copy the URL and paste into a web browser) or (2) call-in to the Zoom meeting by dialing 253-
215-8782 and entering 835 3300 9277 Passcode 347602, or (3) call 425-430-6501 by 10 a.m.
on the day of the meeting to request an invite with a link to the meeting.
Those providing audience comments will be limited to 5 minutes each speaker unless an
exception is granted by the Council. Attendees will be muted and not audible to the Council
except during times they are designated to speak. Advance instructions for how to address
the Council will be provided to those who sign up in advance to speak and again during the
meeting.
1. CALL TO ORDER
2. ROLL CALL
3. ADMINISTRATIVE REPORT
4. AUDIENCE COMMENTS
NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for any
ballot measure or candidate in City Hall and/or during any portion of the council meeting,
including the audience comment portion of the meeting, is PROHIBITED.
5. CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and
the recommended actions will be accepted in a single motion. Any item may be removed for
further discussion if requested by a Councilmember.
a) Approval of Council Meeting minutes of February 22, 2021.
Council Concur
b) AB - 2801 Public Works Utility Systems Division recommends approval of the Water
Quality Grant Agreement WQC-2021-Renton-00187 with the Department of Ecology, to
accept $230,250 in grant funds, for the Heather Downs Detention Pond Water Quality
Retrofit project.
Refer to Finance Committee
c) AB - 2803 Public Works Utility Systems Division submits CAG-19-029, contractor McClure
and Sons, Inc., and recommends acceptance of the project and release of the retainage
bond after 60 days once all State releases have been obtained.
Council Concur
d) AB - 2804 Public Works Utility Systems Division recommends approval of an agreement
with RH2 Engineering, Inc., in the amount of $350,827 for professional services during the
construction of the Highlands Reservoir Phase 1 - Offsite Improvements project.
Refer to Utilities Committee
6. UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics
marked with an asterisk (*) may include legislation. Committee reports on any topics may be
held by the Chair if further review is necessary.
7. LEGISLATION
8. NEW BUSINESS
(Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more
information.)
9. ADJOURNMENT
COMMITTEE OF THE WHOLE MEETING AGENDA
(Preceding Council Meeting)
6:00 p.m. - MEETING REMOTELY
Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk
CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21
To view Council Meetings online, please visit rentonwa.gov/councilmeetings
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
CITY OF RENTON
MINUTES ‐ City Council Regular Meeting
7:00 PM ‐ Monday, February 22, 2021
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
CALL TO ORDER
Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM.
ROLL CALL
Councilmembers Present:
Randy Corman, Council President
Angelina Benedetti, Council Position No. 2
Ryan McIrvin, Council Position No. 4
Ed Prince, Council Position No. 5
Ruth Pérez, Council Position No. 6
Kim‐Khánh Vǎn, Council Position No. 7
(All councilmembers attended remotely)
Councilmembers Absent:
Valerie O'Halloran, Council Position No. 3
MOVED BY MCIRVIN, SECONDED BY PRINCE, COUNCIL EXCUSE ABSENT
COUNCILMEMBER VALERIE O'HALLORAN. CARRIED.
ADMINISTRATIVE STAFF PRESENT
Armondo Pavone, Mayor
Ed VanValey, Interim Chief Administrative Officer
Shane Moloney, City Attorney
Jason Seth, City Clerk
Julia Medzegian, Council Liaison
Judith Subia, Interim Council Liaison
Preeti Shridhar, Deputy Public Affairs Administrator
Chip Vincent, Community & Economic Development Administrator
Martin Pastucha, Public Works Administrator
Kari Roller, Interim Administrative Services Administrator
Ellen Bradley‐Mak, Human Resources and Risk Management Administrator
Ron Straka, Public Works Utilities Systems Director
Cliff Long, Economic Development Director
Kelly Beymer, Community Services Administrator
AGENDA ITEM #5. a)
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
Kim Gilman, HR Labor Manager
Kristi Rowland, Organizational Development Manager
Angie Mathias, Long Range Planning Manager
Paul Hintz, Senior Planner
Clark Close, Senior Planner
April Alexander, Executive Assistant
Interim Chief Jon Schuldt, Police Department Administrator
Commander Dan Figaro, Police Department
(All City staff attended remotely except City Clerk Seth)
PROCLAMATION
a) Lunar New Year Day: A proclamation by Mayor Pavone was read declaring February 22, 2021
to be Lunar New Year Day in the City of Renton, encouraging all members of the community
to join in this special observation. Frieda Takamura, Victoria Do, and Khang Do accepted the
proclamation with appreciation.
MOVED BY VǍN, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
PROCLAMATION. CARRIED.
Mayor Pavone issued the following statement against hate speech:
“We in Renton stand for a community that celebrates diversity and understands that we are
better when we stand together, build bridges and seek to understand one another. As one of
the first cities to incorporate inclusion as part of our vision statement and business plan, we
believe that differences enrich us, and hate has no place here. On August 3, 2020, the Mayor
and City Council affirmed the City’s commitment to opposing discrimination against all groups
in Resolution No. 4414. We condemn hate speech. Hate speech has the effect of
dehumanizing people and carries forward harmful stereotypes and propagates false beliefs
through the use of statements of inferiority, slurs, expressions of contempt, disgust or
dismissal, cursing , and calls for exclusion or segregation. Such behavior should be and is
unacceptable in a community such as Renton that maintains diversity as one of its core
values. As community leaders, we pledge to continue to teach, cultivate and model the values
of openness, diversity and tolerance. We are committed to a standard that makes all of our
citizens feel safe and valued. Positive change starts at home, with each of us. We urge you to
move forward with love and compassion and empathy. Stay united and together make our
community better and our city exceptional.”
PUBLIC HEARING
a) UC Zone Interim Zoning Controls Ordinance No. 6012: This being the date set, and proper
notices having been posted and published in accordance with local and State laws, Mayor
Pavone opened the public hearing to consider Interim Zoning Controls for the Urban Center
(UC Zone).
Senior Planner Paul Hintz introduced himself to Council and noted his contact information for
the public. He explained that Emergency Ordinance 6012 was adopted on January 25, 2020,
establishing interim zoning controls for the Urban Center (UC) zone:
AGENDA ITEM #5. a)
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
1. Development of multifamily requires commercial space integrated into the ground
floor equivalent to 33% of the site’s land area;
2. Subject to Residential Mixed‐Use Standards of RMC 4‐4‐150; and
3. Building setbacks of the Commercial Arterial zone.
Mr. Hintz stated that State law requires a public hearing for emergency ordinances be held
within 60 days of adoption. Ordinance 6012 will sunset on June 25, 2021 unless lifted sooner
by City Council or extended pursuant to state law.
Continuing, Mr. Hintz reported the following:
The Urban Center (UC) zone is intended for the creation of dense employment,
destination retail, recreation, and public gathering spaces, with the potential for large
scale redevelopment opportunities that will create a mixed‐use retail, employment
and residential center;
The purpose of the UC zone is to provide an area for pedestrian‐scale urban mixed‐
use development that supports the residential and employment goals of Renton’s
Regional Growth Center;
A development agreement between the City of Renton and The Boeing Company
governing many of the use and development standards in the UC zone sunset on
December 31, 2020;
Without that development agreement there are insufficient zoning controls for new
development in the UC zone, as compared to the zoning controls of other commercial
zones in the City, thereby limiting the City’s ability to further the policy and purpose
of the zone.
Concluding, Mr. Hintz stated that the purpose of tonight’s hearing is to accept public
testimony, and that before June 25, 2021 (sunset date), staff will work with the Planning
Commission and the Planning and Development Committee to develop permanent standards
for the UC zone.
Mayor Pavone invited public comment:
City Clerk Seth summarized a letter from Jack Burke, Asset Manager for The Landing,
LLC, expressing interest to be kept in communication with the Community and
Economic Development Department regarding this matter.
Bryon Wolf, Bay West Development, expressed concern regarding the adoption of the
emergency Interim Zoning Controls because his agency had submitted a pre‐
application for the Fry's property located in the UC Zone. He stated that even with
this setback, he is committed to working with the City on this project.
Rocale Timmons, SECO Development, asked the City to consider a flexible approach
to retail square footage, using a macro‐lens in the area instead of a site‐by‐site
approach, and emphasized the need for affordable housing in the area.
There being no further public comments or deliberations, it was
MOVED BY PRINCE, SECONDED BY CORMAN, COUNCIL CLOSE THE PUBLIC
HEARING. CARRIED.
AGENDA ITEM #5. a)
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
ADMINISTRATIVE REPORT
Interim CAO Ed VanValey reviewed a written administrative report summarizing the City’s
recent progress towards goals and work programs adopted as part of its business plan for 2021
and beyond. Items noted were:
The Public Works Maintenance Division spent the week of February 11‐16 responding to
a significant amount of snow, ice, cold temperatures, and cleanup. The following is a
summary of their efforts used to treat our roadways and keep them safe during this
event:
Total Miles Plowed: 8,884
Total Miles Deiced: 1,419
Tons of Salt Used: 412
Tons of Sand Used: 193
Gallons of Deicer Used: 8,965
The Water Utility will be hosting a virtual information session on the 2019 Water System
Plan Update on Tuesday, February 23, from 5‐7 p.m. This is an opportunity for the public
to comment on the goals of the plan. Supporting documents and a link to the virtual
session may be found on our website at
https://rentonwa.gov/city_hall/public_works/utility_systems/water_utility_engineering.
Preventative street maintenance will continue to impact traffic and result in occasional
street closures.
AUDIENCE COMMENTS
Paula Sardinas, Federal Way, spoke in support of Puppyland, a new pet store opening
in Renton.
Nancy Quinn, Renton, praised public works crews for doing an outstanding job
clearing the recent snowfall from City streets.
Francisco Irigon, Newcastle, expressed outrage about the recent incident of a woman
calling an Asian American a racial slur that was caught on video.
Michael Itti, who operates an office in Renton, praised the Mayor and Council for
their commitment to social justice. He remarked that racist incidents need to be
taken seriously.
Winter Cashman, Renton, urged the City to not delay in responding to this racist
incident, and inquired about the police officer who was associated with a known
member of the Proud Boys.
Lafaitele Lydia M. Faitalia Ioane, Renton, expressed concern about the racist incident
captured on video and called on the City to provide community training on inclusivity
and diversity.
CONSENT AGENDA
Items listed on the Consent Agenda were adopted with one motion, following the listing. Councilmember
McIrvin requested Item 7.d be removed for separate consideration.
a) Approval of Council Meeting minutes of February 8, 2021. Council Concur.
AGENDA ITEM #5. a)
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
b) AB ‐ 2805 City Clerk reported bid opening on January 15, 2021 for the Renton Elementary and
Middle Schools project, CAG‐20‐150, and submitted the staff recommendation to award the
contract to the lowest responsive and responsible bidder, PGH Excavating, Inc., in the amount
of $374,702.96. The construction contract provides for installing Rectangular Rapid Flash
Beacons (RRFBs) at three (3) Renton school locations (Maplewood Heights Elementary, Sierra
Heights Elementary, and McKnight Middle School) to improve pedestrian safety. The work
shall include but is not limited to excavation, pavement removal, RRFBs with accessible push
buttons, signage, pavement markings, pedestrian refuge island, bulb outs, sidewalk widening,
ADA/curb ramps improvements, drainage improvement, and visibility improvements. Council
Concur.
c) AB ‐ 2797 Community & Economic Development Department recommended approval of a
resolution declaring that acquisition of the property located at 13279 89th Avenue South,
Renton, WA (King County Parcel No. 2144800910) is necessary to eliminate neighborhood
blight; and requested authorization to acquire, condemn, and abate the property pursuant to
Chapter 35.80A RCW. Refer to Committee of the Whole.
MOVED BY CORMAN, SECONDED BY PÉREZ, COUNCIL CONCUR TO APPROVE THE
CONSENT AGENDA, MINUS ITEM 7.d. CARRIED.
SEPARATE CONSIDERATION ITEM 7.d.
d) AB ‐ 2799 Public Works Transportation Systems Division recommended approval of Change
Order No. 1 to CAG‐20‐001, contractor Cascade Civil Construction, LLC, in the amount of
$520,000, for additional work on Houser Way S at Williams Ave S and Wells Ave S necessary
to replace the old City utilities under BNSF railroad tracks. Refer to Transportation (Aviation)
Committee.
MOVED BY MCIRVIN, SECONDED BY CORMAN, COUNCIL CONCUR TO APPROVE
CONSENT AGENDA ITEM 7.d. AS COUNCIL CONCUR. CARRIED.
UNFINISHED BUSINESS
a) Finance Committee Vice Chair Prince presented a report concurring in the staff recommendation
to approve the following payments:
1. Accounts Payable – total payment of $5,692,008.25 for vouchers, 10258‐10259,
10261‐10264, 117931‐117932, 390080, 390090‐390327; payroll benefit withholding
vouchers 6494‐6505, 390081‐390089 and four wire transfers.
2. Payroll – total payment of $1,542,668.68 for payroll vouchers that include 667 direct
deposits and 5 checks. (01/16/21‐01/31/21 pay period).
3. Kidder Mathews vouchers 6278‐6297 totaling $34,059.52
4. Municipal Court vouchers 017772‐017782 totaling $10,914.00
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
AGENDA ITEM #5. a)
February 22, 2021 REGULAR COUNCIL MEETING MINUTES
b) Finance Committee Vice Chair Prince presented a report concurring in the staff recommendation
to approve the hiring of a Water Utility Civil Engineer III at Pay Grade a29, Step E, effective March
16, 2021. This is an existing position currently budgeted at Step C in the 2021 budget. As a result
of the position being charged to the Water Utility Fund 405 (an enterprise fund) there is no
impact to the General Fund.
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
NEW BUSINESS
Please see the attached Council Committee Meeting Calendar.
Council condemned the recent racist incident of someone using a racial slur against an Asian
American that was videotaped and uploaded to social media outlets on February 13, 2021.
Council then determined that the upcoming Council retreat would be a good venue to
deliberate and determine what action Council would take on the issue.
EXECUTIVE SESSION & ADJOURNMENT
MOVED BY CORMAN, SECONDED BY MCIRVIN, COUNCIL RECESS INTO EXECUTIVE SESSION
FOR APPROXIMATELY 30 MINUTES TO DISCUSS WITH LEGAL MATTERS OF POTENTIAL
LITIGATION PURSUANT TO RCW 42.30.110(1)(i) WITH NO OFFICIAL ACTION TO BE TAKEN
AND THAT THE COUNCIL MEETING BE ADJOURNED WHEN THE EXECUTIVE SESSION IS
ADJOURNED. CARRIED.
TIME: 8:02 P.M.
Interim Chief Administrative Officer VanValey announced that an additional 15 minutes was
required. Executive Session was conducted and no action was taken. The Council meeting
adjourned when the executive session adjourned. Time: 8:47 P.M.
Jason A. Seth, MMC, City Clerk
Jason Seth, Recorder
22 Feb 2021
AGENDA ITEM #5. a)
Council Committee Meeting Calendar
February 22, 2021
March 1, 2021
Monday
CANCELED Utilities Committee, Chair Benedetti
4:15 PM Community Services Committee, Chair Văn - VIDEOCONFERENCE
1. Community Services – Staffing Levels/COVID-19 Impacts
2. Emerging Issues in Community Services
CANCELED Transportation Committee, Chair McIrvin - VIDEOCONFERENCE
6:00 PM Committee of the Whole, Chair Corman - VIDEOCONFERENCE
1. Introduction of Airport Director David Decoteau
2. Community Court Update *
2. Blighted Property Resolution
7:00 PM Council Meeting - VIDEOCONFERENCE
* New item added, revised 02/25/21
AGENDA ITEM #5. a)
AB - 2801
City Council Regular Meeting - 01 Mar 2021
SUBJECT/TITLE: Water Quality Grant Agreement WQC-2021-Renton-00187 with the
Department of Ecology for the Heather Downs Detention Pond Water
Quality Retrofit Project
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Public Works Utility Systems Division
STAFF CONTACT: Ken Srilofung, Surface Water Utility Engineer
EXT.: 7247
FISCAL IMPACT SUMMARY:
This agreement provides $230,250 of grant funding into the approved 2021 Sur face Water Utility Capital
Improvement Program budget for the Heather Downs Detention Pond Water Quality Retrofit Project
(427.475511). The grant requires $76,750 in local matching funds for a total grant agreement amount of
$307,000. The total project cost is estimated to be $409,000, of which $307,000 consists of water quality
retrofit work eligible for grant funding, and $102,000 consists of non -grant eligible drainage improvements
funded by Surface Water Utility. There is sufficient funding in the pr oject budget for the required matching
funds and the additional work that is not grant eligible ($178,750).
SUMMARY OF ACTION:
The Department of Ecology (Ecology) water quality grant will provide the funding for the construction of the
project to convert an existing detention pond into a combined wet pond and detention pond. The completed
facility will provide flow control (detention) and water quality treatment for 3.1 acres of a 29.8-acre tributary
basin. The Heather Downs detention pond is located upstream of Maplewood Creek and the Cedar River. Discharges
from the Heather Downs pond flow to Maplewood Creek and then to the Cedar River. The project design was also
funded by a previously approved Ecology water quality grant (WQC-2017-Renton-00002). The project design
was completed and accepted by Ecology in October 2020. The new wet pond volume will be excavated below
the current pond bottom and a permeable liner will be constructed. The proposed wet pond dimensions are
70 feet in width and 120 feet in length with an additional 3.2 feet of depth for sediment and wetland storage.
This combined wet pond and detention pond will provide basic treatment and removal of total suspended
solids (TSS). The water quality treatment will allow sediments to bind and settle out as stormwater flows into
the pond. Additional storm system improvements not covered by this grant include instal lation of drainage
improvements along SE 3rd Place and Union Avenue South near the Heather Downs detention facility. The
estimated total construction cost including both grant funded and non -grant funded work is $409,000.
This project will improve water quality of stormwater runoff that flows into Maplewood Creek and the Cedar
River. The Cedar River is on the 303(d) list for violations of water temperature, dissolved oxygen, and pH
standards. Overall, this project will help protect and restore water q uality in the city and Washington state by
reducing stormwater impacts from existing roadways and development.
EXHIBITS:
A. Agreement
B. Vicinity Map
AGENDA ITEM #5. b)
STAFF RECOMMENDATION:
Execute the Water Quality Grant Agreement WQC-2021-Renton-00187 with the Department of Ecology to
accept $230,250 in grant funds for the Heather Downs Detention Pond Water Quality Retrofit Project
(SWP273989).
AGENDA ITEM #5. b)
Agreement No. WQC-2021-Renton-00187
WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
CITY OF RENTON
This is a binding Agreement entered into by and between the state of Washington , Department of Ecology, hereinafter
referred to as “ECOLOGY,” and City of Renton, hereinafter referred to as the “RECIPIENT,” to carry out with the
provided funds activities described herein.
Heather Downs Detention Pond Water Quality
Retrofit Project
GENERAL INFORMATION
Project Title:
Total Cost:
Total Eligible Cost:
Ecology Share:
Recipient Share:
The Effective Date of this Agreement is:
The Expiration Date of this Agreement is no later than:
Project Type:
Project Short Description:
The project will improve water quality in the Maplewood Creek and Cedar River through retrofit of the Heather Downs
detention pond in the City of Renton in King County, Washington. The retrofit project will convert a “back-up” type
detention pond to a “flow-through” one-cell combined detention pond/wetpond. The added water quality treatment will
allow sediment and bound pollutants to settle out as stormwater flows into the pond.
Project Long Description:
The RECIPIENT will complete construction needed to convert an existing detention pond to a “flow -through”
combined wetpond and detention pond. The completed facility will provide water quality treatment for 3.1 acres of a
29.8 acre tributary basin. The design for construction was accepted by Ecology in project WQC -2017-Renton-00002.
The new wetpond volume will be excavated below the current pond bottom and a permeable liner will be constructed.
The proposed wetpond dimensions are 70 feet in width and 120 feet in length with an additional 3.2 feet of depth for
$409,000.00
$307,000.00
$230,250.00
$76,750.00
07/01/2020
12/31/2022
Stormwater Facility
AGENDA ITEM #5. b)
Page 2 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
sediment and wetland storage. This combined wetpond and detention will provide basic treatment, removal of Total
Suspended Solids (TSS) but will not provide an increase of flow control from existing conditions. The water quality
treatment will allow sediments to bind pollutants and settle out as stormwater flows into the pond. This project will
provide long-term benefits to Maplewood Creek and the Cedar River. The Cedar River is on the 303(d) list for
violations of water temperature, dissolved oxygen and pH standards.
Overall Goal:
This project will help protect and restore water quality in Washington State by reducing stormwater impacts from
existing infrastructure and development.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 3 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
RECIPIENT INFORMATION
Organization Name:
Federal Tax ID:
DUNS Number:
Mailing Address:
Physical Address:
Contacts
Organization Email:
City of Renton
91-6001271
949697221
Renton City Hall, 5th Floor, 1055 South Grady Way
Renton, WA 98057-3232
Renton City Hall, 5th Floor
1055 South Grady Way
rstraka@rentonwa.gov
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 4 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Ken Srilofung
Surface Water Utility Engineer 3 - Project Manager
1055 South Grady Way, 5th Floor
Renton, Washington 98057
Email: ksrilofung@rentonwa.gov
Phone: (425) 430-7247
Authorized
Signatory
Ken Srilofung
Surface Water Utility Engineer 3 - Project Manager
1055 South Grady Way, 5th Floor
Renton, Washington 98057
Email: ksrilofung@rentonwa.gov
Phone: (425) 430-7247
Billing Contact
Project Manager
Authorized
Signatory
Armondo Pavone
Mayor
Renton City Hall, 5th Floor
1055 South Grady Way
Renton, Washington 98057-3232
Email: apavone@rentonwa.gov
Phone: (425) 430-7248
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 5 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Contacts
Project
Manager
Financial
Manager
Technical
Advisor
Michelle Myers
PO Box 47600
Olympia, Washington 98504-7600
Email: mmye461@ecy.wa.gov
Phone: (360) 407-6564
Michelle Myers
PO Box 47600
Olympia, Washington 98504-7600
Email: mmye461@ecy.wa.gov
Phone: (360) 407-6564
Doug Howie
Senior Stormwater Engineer
PO Box 47600
Olympia, Washington 98504-7600
Email: DOHO461@ecy.wa.gov
Phone: (360) 407-6444
ECOLOGY INFORMATION
Mailing Address:
Physical Address:
Department of Ecology
Water Quality
PO BOX 47600
Olympia, WA 98504-7600
Water Quality
300 Desmond Drive SE
Lacey, WA 98503
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 6 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
AUTHORIZING SIGNATURES
RECIPIENT agrees to furnish the necessary personnel , equipment, materials, services, and otherwise do all things necessary
for or incidental to the performance of work as set forth in this Agreement .
RECIPIENT acknowledges that they had the opportunity to review the entire Agreement , including all the terms and conditions
of this Agreement, Scope of Work, attachments, and incorporated or referenced documents, as well as all applicable laws,
statutes, rules, regulations, and guidelines mentioned in this Agreement . Furthermore, the RECIPIENT has read, understood,
and accepts all requirements contained within this Agreement .
This Agreement contains the entire understanding between the parties , and there are no other understandings or representations
other than as set forth, or incorporated by reference, herein.
No subsequent modifications or amendments to this agreement will be of any force or effect unless in writing , signed by
authorized representatives of the RECIPIENT and ECOLOGY and made a part of this agreement . ECOLOGY and
RECIPIENT may change their respective staff contacts without the concurrence of either party .
This Agreement shall be subject to the written approval of Ecology’s authorized representative and shall not be binding until so
approved.
The signatories to this Agreement represent that they have the authority to execute this Agreement and bind their respective
organizations to this Agreement.
Washington State
Department of Ecology
Water Quality
Date Date
City of Renton
Vincent McGowan, P.E.
Mayor
Armondo Pavone
By:By:
Template Approved to Form by
Attorney General's Office
Program Manager
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 7 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
City's Clerk Date
Jason Seth
Renton City Attorney Date
Shane Moloney
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 8 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:1 Task Cost: $15,000.00
Task Title:Grant and Loan Administration
Task Description:
A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration requirements .
Responsibilities include, but are not limited to: Maintenance of project records; submittal of requests for reimbursement and
corresponding backup documentation; progress reports; the EAGL (Ecology Administration of Grants and Loans ) recipient
closeout report; and a two-page outcome summary report (including photos, if applicable). In the event that the RECIPIENT
elects to use a contractor to complete project elements, the RECIPIENT shall retain responsibility for the oversight and
management of this funding agreement.
B. The RECIPIENT shall keep documentation that demonstrates the project is in compliance with applicable procurement ,
contracting, and interlocal agreement requirements; permitting requirements, including application for, receipt of, and
compliance with all required permits, licenses, easements, or property rights necessary for the project; and submittal of required
performance items. This documentation shall be available upon request.
C. The RECIPIENT shall maintain effective communication with ECOLOGY and maintain up -to-date staff contact information
in the EAGL system. The RECIPIENT shall carry out this project in accordance with any completion dates outlined in this
agreement.
Task Goal Statement:
Properly managed and fully documented project that meets ECOLOGY’s grant or loan administrative requirements .
Task Expected Outcome:
* Timely and complete submittal of requests for reimbursement , quarterly progress reports, Recipient Closeout Report, and
two-page outcome summary report.
* Properly maintained project documentation.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 9 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Recipient Task Coordinator: Ken Srilofung
Deliverables
Grant and Loan Administration
Number Description Due Date
1.1 Progress Reports that include descriptions of work accomplished, project
challenges or changes in the project schedule. Submitted at least quarterly.
12/31/2021
1.2 Recipient Closeout Report (EAGL Form)12/31/2021
1.3 Two-page Outcome Summary Report 12/31/2021
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 10 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:2 Task Cost: $4,000.00
Task Title:Cultural and Environmental Reviews, and Permitting
Task Description:
The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY . The
RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance .
A.The RECIPIENT will provide both the ECOLOGY project manager and separegister @ecy.wa.gov with the initial
consultation on the draft State Environmental Policy Act (SEPA) documents.
B.The RECIPIENT will notify the ECOLOGY project manager, in addition to the required distribution and public notice,
when SEPA documents have been issued for the official comment period , which is a minimum of 21 days.
C.The RECIPIENT is responsible for application of, receipt of, and compliance with all required local, state, tribal and
federal permits, licenses, easements, or property rights necessary for the project.
D.Above and below ground activities must be reviewed for cultural resource impacts. The RECIPIENT will submit the forms
listed below to ECOLOGY to initiate consultation for cultural resources review .
To initiate cultural resources review:
1.The RECIPIENT will submit the 05-05/106 Form to ECOLOGY, using the ECOLOGY template. Any supporting
materials must conform to the Department of Archeology and Historic Preservation’s Washington State Standards for Cultural
Resource Reporting.
2.The RECIPIENT will submit an Inadvertent Discovery Plan (IDP) to ECOLOGY, using the ECOLOGY template. The
RECIPIENT will ensure that all contractors and subcontractors have a copy of the completed IDP prior to and while working
on-site. The IDP template may be found on the ECOLOGY website.
The RECIPIENT must receive written notice from ECOLOGY prior to proceeding with work . Work done prior to written
notice to proceed shall not be eligible for reimbursement. This includes geotechnical work.
Task Goal Statement:
The RECIPIENT will complete all cultural and environmental reviews and permitting tasks in a timely manner .
Task Expected Outcome:
The project will meet the requirements set forth by the cultural resource protection requirements, State Environmental Policy
Act, and all other applicable federal, state, and local laws, and regulations.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 11 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Deliverables
Cultural and Environmental Reviews, and Permitting
Number Description Due Date
2.1 SEPA checklist, or other documentation for projects considered exempt from
SEPA review. Upload to EAGL and notify ECOLOGY when upload is
complete.
2.2 List of permits acquired and environmental review documents. Upload to
EAGL and notify ECOLOGY when upload is complete .
2.3 ECOLOGY 05-05/106 Form. Email the form and any supplemental cultural
resources documentation directly to the ECOLOGY Project Manager .
ECOLOGY will upload documentation to EAGL when cultural resources is
complete.
2.4 Inadvertent Discovery Plan. Upload to EAGL and notify ECOLOGY when
upload is complete.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 12 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:3 Task Cost: $4,000.00
Task Title:Design Plans and Specifications
Task Description:
The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY . The
RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . The RECIPIENT will upload
the design submittals listed below to EAGL for ECOLOGY review . Reduce design figures to 11x17 inches in size and ensure
they are legible.
A.The RECIPIENT will submit a Final Bid Package to ECOLOGY for review and acceptance prior to advertising the
project. The Final Bid Package includes: project plans, specifications, engineer’s opinion of cost including a schedule of eligible
costs, and project construction schedule. Allow 15 calendar days for ECOLOGY review.
B.The RECIPIENT will calculate and submit a preliminary equivalent new/re-development area for the completed retrofit
project(s) using the methods outlined in the Design Deliverables Document.
C.The RECIPIENT will submit a preliminary GIS compatible project area in shapefile, geodatabase file, or
ECOLOGY-approved equivalent. The project area should include polygon features for stormwater facilities and contributing
areas.
Task Goal Statement:
The RECIPIENT will complete all construction tasks and respond to ECOLOGY comments in a timely manner .
Task Expected Outcome:
The project will meet the requirements set forth by ECOLOGY water quality facility design standards and all other applicable
federal, state, and local laws, and regulations.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 13 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Deliverables
Design Plans and Specifications
Number Description Due Date
3.1 The project will meet the requirements set forth by ECOLOGY water quality
facility design standards and all other applicable federal, state, and local laws,
and regulations.
3.2 Responses to ECOLOGY Final Bid Package comments. Upload to EAGL
and notify ECOLOGY when upload is complete.
3.3 Ecology Final Bid Package Acceptance Letter. Upload to EAGL and notify
ECOLOGY when upload is complete .
3.4 Bid documents (e.g. bid announcement, bid tabulations, and bid award).
Upload to EAGL and notify ECOLOGY when upload is complete .
3.5 Preliminary equivalent new/redevelopment area determination. Upload to
EAGL and notify ECOLOGY when upload is complete .
3.6 Preliminary project area shapefile, geodatabase file, or ECOLOGY-approved
equivalent. Upload to EAGL and notify ECOLOGY when upload is complete .
Upload ECOLOGY acceptance documentation .
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 14 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:4 Task Cost: $29,000.00
Task Title:Construction Management
Task Description:
The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY . The
RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance .
A.The RECIPIENT will provide construction oversight and management of the project .
B.The RECIPIENT will submit a detailed Construction Quality Assurance Plan (CQAP) to ECOLOGY for review and
acceptance before the start of construction. This plan must describe how the RECIPIENT will perform adequate and
competent construction oversight. Guidance for CQAP development is located in the Design Deliverables Document available
on the ECOLOGY website. Allow 15 calendar days for ECOLOGY review .
C.The RECIPIENT will conduct a pre-construction conference meeting and invite ECOLOGY to attend .
D.The RECIPIENT will submit an updated project schedule and cost estimate prior to the start of construction and whenever
major changes occur.
E.Prior to execution, the RECIPIENT will submit to ECOLOGY any eligible change orders that deviate from
ECOLOGY-accepted plans and specifications. ECOLOGY must review and accept all change orders that affect grant eligible
activities prior to implementation. Allow 10 calendar days for ECOLOGY review.
Task Goal Statement:
The RECIPIENT will oversee and manage construction , communicate with ECOLOGY in a timely fashion, and provide
ECOLOGY with all requested project documentation.
Task Expected Outcome:
The project will be constructed on schedule and in accordance with accepted plans.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 15 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Deliverables
Construction Management
Number Description Due Date
4.1 Construction Quality Assurance Plan. Upload to EAGL and notify
ECOLOGY when upload is complete. Upload ECOLOGY acceptance
documentation.
4.2 Pre-construction conference meeting minutes. Upload to EAGL and notify
ECOLOGY when upload is complete .
4.3 Project Schedule. Upload to EAGL and notify ECOLOGY when upload is
complete.
4.4 Revised construction cost estimates when changes in construction schedule
occur. Upload to EAGL and notify ECOLOGY when upload is complete .
4.5 Change Order(s). Upload to EAGL and notify ECOLOGY when upload is
complete. Upload ECOLOGY acceptance documentation .
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 16 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:5 Task Cost: $251,000.00
Task Title:Construction
Task Description:
The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY . The
RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance .
A.The RECIPIENT will complete construction of the project in accordance with ECOLOGY -accepted plans and
specifications. The construction project will include installation of a combined detention pond/wetpond to mitigate runoff from
0.93 acres of pollution generating impervious surface (PGIS).
B.Stormwater Construction Completion Form signed by a professional engineer indicating that the project was completed in
accordance with the plans and specifications, and major change orders approved by ECOLOGY’s Project Engineer and
shown on the Record Drawings. The Stormwater Construction Completion Form can be found on the ECOLOGY website .
Task Goal Statement:
Construction of the project in accordance with ECOLOGY-accepted plans and specifications.
Task Expected Outcome:
Constructed project will provide water quality benefits including reductions in hydrocarbons, oils, and other pollutants from
residential areas.
Deliverables
Construction
Number Description Due Date
5.1 Signed and dated construction contract. Upload to EAGL and notify
ECOLOGY when upload is complete.
5.2 Stormwater Construction Completion Form. Upload to EAGL and notify
ECOLOGY when upload is complete.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 17 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
SCOPE OF WORK
Task Number:6 Task Cost: $4,000.00
Task Title:Project Close Out
Task Description:
The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY . The
RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance .
A.The RECIPIENT will operate and maintain the constructed facility for the design life of the facility . The RECIPIENT will
develop and submit an Operations and Maintenance (O&M) plan for all facilities constructed with ECOLOGY funding to
ECOLOGY for review. The O&M plan must address long-term activities to assure ongoing pollutant removal and flow-control
capability of the project in accordance with the design manual. O&M plan development guidance is located in the Design
Deliverables Document available on the ECOLOGY website . Allow 15 calendar days for ECOLOGY review .
B.The RECIPIENT will calculate and submit a final equivalent new/re-development area for the completed retrofit project(s)
using the methods outlined in the Design Deliverables Document.
C.The RECIPIENT will submit the final GIS compatible project area in shapefile , geodatabase file, or ECOLOGY-approved
equivalent. The project area should include polygon features for stormwater facilities and contributing areas.
D.The RECIPIENT will submit the Recipient Closeout Report (RCOR) in EAGL in accordance with Task 1.
E.The RECIPIENT will submit the Two-page Outcome Summary Report using the ECOLOGY template in accordance to
Task 1. Upload the Two-page Outcome Summary Report in the RCOR in EAGL.
Task Goal Statement:
The RECIPIENT will complete all close out submittals in a timely manner.
Task Expected Outcome:
* Timely and complete submittal of O&M plan, equivalent area calculation, GIS, Recipient Closeout Report, and Two-page
Outcome Summary Report.
* Proper maintenance of the constructed facility to maintain water quality benefits.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 18 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Deliverables
Project Close Out
Number Description Due Date
6.1 Facility Operation and Maintenance Plan. Upload to EAGL and notify
ECOLOGY when upload is complete. Upload ECOLOGY acceptance
documentation.
6.2 Final, as constructed, equivalent new/redevelopment area determination.
Upload to EAGL and notify ECOLOGY when upload is complete .
6.3 Final, as constructed, project area shapefile, geodatabase file, or
ECOLOGY-approved equivalent. Upload to EAGL and notify ECOLOGY
when upload is complete. Upload ECOLOGY acceptance documentation .
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 19 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
BUDGET
Funding Distribution EG210129
NOTE: The above funding distribution number is used to identify this specific agreement and budget on payment
remittances and may be referenced on other communications from ECOLOGY. Your agreement may have multiple
funding distribution numbers to identify each budget.
Title:
State
SFAP - SFY21
100%
Environmental Legacy Stewarship Account (ELSA) - State
Type:
Funding Source %:
Description:
Approved Indirect Costs Rate:
Recipient Match %:
InKind Interlocal Allowed:
InKind Other Allowed:
Is this Funding Distribution used to match a federal grant? No
Approved State Indirect Rate: 0%
25%
No
No
Funding Title:
Funding Source:
Funding Expiration Date:
Funding Type:
Funding Effective Date:
SFAP
07/01/2020 12/31/2022
Grant
SFAP Task Total
Grant and Loan Administration 15,000.00$
Cultural and Environmental Reviews, and Permitting 4,000.00$
Design Plans and Specifications 4,000.00$
Construction Management 29,000.00$
Construction 251,000.00$
Project Close Out 4,000.00$
307,000.00$Total:
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 20 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Funding Distribution Summary
Recipient / Ecology Share
Recipient Share Ecology Share TotalRecipient Match %Funding Distribution Name
$$$%230,250.00 307,000.0076,750.0025.00SFAP
Total $$76,750.00 230,250.00 $307,000.00
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECIAL TERMS AND CONDITIONS
SECTION 1: DEFINITIONS
Unless otherwise provided, the following terms will have the respective meanings for all purposes of this agreement:
“Administration Charge” means a charge established in accordance with Chapter 90.50A RCW and Chapter 173-98 WAC,
to be used to pay Ecology’s cost to administer the State Revolving Fund by placing a percentage of the interest earned in an
Administrative Charge Account .
“Administrative Requirements” means the effective edition of ECOLOGY 's Administrative Requirements for Recipients of
Ecology Grants and Loans at the signing of this agreement.
“Annual Debt Service” for any calendar year means for any applicable bonds or loans including the loan, all interest plus all
principal due on such bonds or loans in such year.
“Average Annual Debt Service” means , at the time of calculation, the sum of the Annual Debt Service for the remaining years
of the loan to the last scheduled maturity of the loan divided by the number of those years.
“Acquisition” means the purchase or receipt of a donation of fee or less than fee interests in real property. These interests
include, but are not limited to, conservation easements, access/trail easements, covenants, water rights, leases, and mineral
rights.
“Centennial Clean Water Program” means the state program funded from various state sources .
“Contract Documents” means the contract between the RECIPIENT and the construction contractor for construction of the
project.
“Cost Effective Analysis” means a comparison of the relative cost -efficiencies of two or more potential ways of solving a water
quality problem as described in Chapter 173-98-730 WAC.
“Defease” or “Defeasance” means the setting aside in escrow or other special fund or account of sufficient investments and
money dedicated to pay all principal of and interest on all or a portion of an obligation as it comes due.
“Effective Date” means the earliest date on which eligible costs may be incurred .
“Effective Interest Rate” means the total interest rate established by Ecology that includes the Administrative Charge .
“Estimated Loan Amount” means the initial amount of funds loaned to the RECIPIENT .
“Estimated Loan Repayment Schedule” means the schedule of loan repayments over the term of the loan based on the
Estimated Loan Amount.
“Equivalency” means projects designated by ECOLOGY to meet additional federal requirements .
“Expiration Date” means the latest date on which eligible costs may be incurred.
“Final Accrued Interest” means the interest accrued beginning with the first disbursement of funds to the RECIPIENT through
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 21 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
such time as the loan is officially closed out and a final loan repayment schedule is issued .
“Final Loan Amount” means all principal of and interest on the loan from the Project Start Date through the Project
Completion Date.
“Final Loan Repayment Schedule” means the schedule of loan repayments over the term of the loan based on the Final Loan
Amount.
“Forgivable Principal” means the portion of a loan that is not required to be paid back by the borrower .
“General Obligation Debt” means an obligation of the RECIPIENT secured by annual ad valorem taxes levied by the
RECIPIENT and by the full faith, credit, and resources of the RECIPIENT.
“General Obligation Payable from Special Assessments Debt” means an obligation of the RECIPIENT secured by a valid
general obligation of the Recipient payable from special assessments to be imposed within the constitutional and statutory tax
limitations provided by law without a vote of the electors of the RECIPIENT on all of the taxable property within the
boundaries of the RECIPIENT.
“Gross Revenue” means all of the earnings and revenues received by the RECIPIENT from the maintenance and operation of
the Utility and all earnings from the investment of money on deposit in the Loan Fund, except (i) Utility Local Improvement
Districts (ULID) Assessments, (ii) government grants, (iii) RECIPIENT taxes, (iv) principal proceeds of bonds and other
obligations, or (v) earnings or proceeds (A) from any investments in a trust, Defeasance, or escrow fund created to Defease or
refund Utility obligations or (B) in an obligation redemption fund or account other than the Loan Fund until commingled with
other earnings and revenues of the Utility or (C) held in a special account for the purpose of paying a rebate to the United
States Government under the Internal Revenue Code.
“Guidelines” means the ECOLOGY's Funding Guidelines that that correlate to the State Fiscal Year in which the project is
funded.
“Initiation of Operation Date” means the actual date the Water Pollution Control Facility financed with proceeds of the loan
begins to operate for its intended purpose.
“Loan” means the Washington State Water Pollution Control Revolving Fund Loan or Centennial Clean Water Fund
(Centennial) Loan made pursuant to this loan agreement.
“Loan Amount” means either an Estimated Loan Amount or a Final Loan Amount , as applicable.
“Loan Fund” means the special fund created by the RECIPIENT for the repayment of the principal of and interest on the loan .
“Loan Security” means the mechanism by which the RECIPIENT pledges to repay the loan .
“Loan Term” means the repayment period of the loan .
“Maintenance and Operation Expense” means all reasonable expenses incurred by the RECIPIENT in causing the Utility to be
operated and maintained in good repair, working order, and condition including payments to other parties, but will not include
any depreciation or RECIPIENT levied taxes or payments to the RECIPIENT in lieu of taxes .
“Net Revenue” means the Gross Revenue less the Maintenance and Operation Expense.
“Original Engineer’s Estimate” means the engineer’s estimate of construction costs included with bid documents .
“Principal and Interest Account” means , for a loan that constitutes Revenue-Secured Debt, the account created in the loan fund
to be first used to repay the principal of and interest on the loan.
“Project” means the project described in this agreement.
“Project Completion Date” means the date specified in the agreement on which the Scope of Work will be fully completed .
This term is only used in loan agreements.
“Project Schedule” means that schedule for the project specified in the agreement.
“Revenue-Secured Debt” means an obligation of the RECIPIENT secured by a pledge of the revenue of a utility and one not
a general obligation of the RECIPIENT.
“Reserve Account” means , for a loan that constitutes a Revenue Secured Debt and if specifically identified as a term and
condition of the funding agreement, the account of that name created in the loan fund to secure the payment of the principal of
and interest on the loan.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 22 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
“Risk-Based Determination” means an approach to sub-recipient monitoring and oversight based on risk factors associated to
a RECIPIENT or project.
“Scope of Work” means the tasks and activities constituting the project .
“Section 319” means the section of the Clean Water Act that provides funding to address nonpoint sources of water pollution .
“Senior Lien Obligations” means all revenue bonds and other obligations of the RECIPIENT outstanding on the date of
execution of this loan agreement (or subsequently issued on a parity therewith, including refunding obligations) or issued after
the date of execution of this loan agreement having a claim or lien on the Gross Revenue of the Utility prior and superior to the
claim or lien of the loan, subject only to Maintenance and Operation Expense.
“State Water Pollution Control Revolving Fund (Revolving Fund)” means the water pollution control revolving fund established
by Chapter 90.50A.020 RCW.
“Termination Date” means the effective date of ECOLOGY’s termination of the agreement .
“Termination Payment Date” means the date on which the RECIPIENT is required to repay to ECOLOGY any outstanding
balance of the loan and all accrued interest.
“Total Eligible Project Cost” means the sum of all costs associated with a water quality project that have been determined to
be eligible for ECOLOGY grant or loan funding, including any required recipient match.
“Total Project Cost” means the sum of all costs associated with a water quality project , including costs that are not eligible for
ECOLOGY grant or loan funding.
“ULID” means any utility local improvement district of the RECIPIENT created for the acquisition or construction of additions
to and extensions and betterments of the Utility.
“ULID Assessments” means all assessments levied and collected in any ULID . Such assessments are pledged to be paid into
the Loan Fund (less any prepaid assessments permitted by law to be paid into a construction fund or account). ULID
Assessments will include principal installments and any interest or penalties which may be due.
“Utility” means the sewer system, stormwater system, or the combined water and sewer system of the RECIPIENT, the Net
Revenue of which is pledged to pay and secure the loan.
SECTION 2: THE FOLLOWING CONDITIONS APPLY TO ALL RECIPIENTS OF WATER QUALITY COMBINED
FINANCIAL ASSISTANCE FUNDING.
The Water Quality Financial Assistance Funding Guidelines are included in this agreement by reference and are available on
ECOLOGY’s Water Quality Program website.
A. Architectural and Engineering Services: The RECIPIENT certifies by signing this agreement that the requirements of
Chapter 39.80 RCW, “Contracts for Architectural and Engineering Services ,” have been, or shall be, met in procuring
qualified architectural/engineering services. The RECIPIENT shall identify and separate eligible and ineligible costs in the final
architectural/engineering services contract and submit a copy of the contract to ECOLOGY.
B. Acquisition: The following provisions shall be in force only if the project described in this agreement is an acquisition project:
a. Evidence of Land Value and Title. The RECIPIENT shall submit documentation of the cost of the property rights and the
type of ownership interest that has been acquired.
b. Legal Description of Real Property Rights Acquired . The legal description of the real property rights purchased with funding
assistance provided through this agreement (and protected by a recorded conveyance of rights to the State of Washington )
shall be incorporated into the agreement before final payment.
c. Conveyance of Rights to the State of Washington. Upon purchase of real property rights (both fee simple and lesser
interests), the RECIPIENT shall execute the document necessary to convey certain rights and responsibilities to ECOLOGY ,
on behalf of the State of Washington . The documents required will depend on the project type, the real property rights being
acquired, and whether or not those rights are being acquired in perpetuity (see options below). The RECIPIENT shall use
language provided by ECOLOGY, to record the executed document in the County where the real property lies, and to
provide a copy of the recorded document to ECOLOGY.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 23 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Documentation Options:
1. Deed of Right. The Deed of Right conveys to the people of the state of Washington the right to preserve , protect, and/or
use the property for public purposes consistent with the fund source. RECIPIENTs shall use this document when acquiring real
property rights that include the underlying land. This document may also be applicable for those easements where the
RECIPIENT has acquired a perpetual easement for public purposes . The RECIPIENT must obtain ECOLOGY approval on
the draft language prior to executing the deed of right.
2. Assignment of Rights. The Assignment of Rights document transfers certain rights such as access and enforcement to
ECOLOGY. The RECIPIENT shall use this document when an easement or lease is being acquired for water quality and
habitat conservation. The Assignment of Rights requires the signature of the underlying landowner and must be incorporated by
reference in the easement document.
3. Easements and Leases. The RECIPIENT may incorporate required language from the Deed of Right or Assignment of
Rights directly into the easement or lease document, thereby eliminating the requirement for a separate document. Language
will depend on the situation; therefore, the RECIPIENT must obtain ECOLOGY approval on the draft language prior to
executing the easement or lease.
d. Real Property Acquisition and Relocation Assistance .
1. Federal Acquisition Policies. See Section 4 of this agreement for requirements specific to Section 319 and SRF funded
projects.
2. State Acquisition Policies. When state funds are part of this agreement, the RECIPIENT agrees to comply with the terms
and conditions of the Uniform Relocation Assistance and Real Property Acquisition Policy of the State of Washington , Chapter
8.26 RCW, and Chapter 468-100 WAC.
3. Housing and Relocation. In the event that housing and relocation costs, as required by federal law set out in subsection (1)
above and/or state law set out in subsection (2) above, are involved in the execution of this project, the RECIPIENT agrees to
provide any housing and relocation assistance required.
e. Hazardous Substances.
1. Certification. The RECIPIENT shall inspect, investigate, and conduct an environmental audit of the proposed acquisition site
for the presence of hazardous substances, as defined in RCW 70.105D.020(10), and certify:
i. No hazardous substances were found on the site, or
ii. Any hazardous substances found have been treated and/or disposed of in compliance with applicable state and federal laws,
and the site is deemed “clean.”
2. Responsibility. Nothing in this provision alters the RECIPIENT's duties and liabilities regarding hazardous substances as set
forth in RCW 70.105D.
3. Hold Harmless. The RECIPIENT will defend, protect and hold harmless ECOLOGY and any and all of its employees
and/or agents, from and against any and all liability, cost (including but not limited to all costs of defense and attorneys' fees)
and any and all loss of any nature from any and all claims or suits resulting from the presence of, or the release or threatened
release of, hazardous substances on the property the RECIPIENT is acquiring .
f. Restriction On Conversion Of Real Property And/Or Facilities To Other Uses
The RECIPIENT shall not at any time convert any real property (including any interest therein) or facility acquired, developed,
maintained, renovated, and/or restored pursuant to this agreement to uses other than those purposes for which funds were
approved without prior approval of ECOLOGY. For acquisition projects that are term limited, such as one involving a lease or
a term-limited restoration, renovation or development project or easement, this restriction on conversion shall apply only for
the length of the term, unless otherwise provided in written documents or required by applicable state or federal law. In such
case, the restriction applies to such projects for the length of the term specified by the lease, easement, deed, or landowner
agreement.
C. Best Management Practices (BMP) Implementation: If the RECIPIENT installs BMPs that are not approved by
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 24 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
ECOLOGY prior to installation, the RECIPIENT assumes the risk that part or all of the reimbursement for that activity may be
delayed or ineligible. For more details regarding BMP Implementation, please reference the Water Quality Financial
Assistance Funding Guidelines available on ECOLOGY’s Water Quality Program funding website .
D. Electronic Fund Transfers: Payment will be issued through Washington State’s Office of Financial Management’s Statewide
Payee Desk. To receive payment you must register as a statewide vendor by submitting a statewide vendor registration form
and an IRS W-9 form at website, https://ofm.wa.gov/it-systems/statewide-vendorpayee-services. If you have questions about
the vendor registration process or electronic fund transfers, you can contact Statewide Payee Help Desk at (360) 407-8180
or email PayeeRegistration@ofm.wa.gov.
E. Equipment Purchase: Equipment purchases over $5,000 and not included in the scope of work or the Ecology approved
construction plans and specifications, must be pre-approved by ECOLOGY’s project manager before purchase . All
equipment purchases over $5,000 and not included in a contract for work being completed on the funded project, must also
be reported on the Equipment Purchase Report in EAGL.
F. Funding Recognition: The RECIPIENT must inform the public about ECOLOGY or any EPA (see Section 3.B for Section
319 funded or Section 5.E for SRF funded projects) funding participation in this project through the use of project signs,
acknowledgement in published materials, reports, the news media, websites, or other public announcements. Projects
addressing site-specific locations must utilize appropriately sized and weather-resistant signs. Sign logos are available from
ECOLOGY’s Financial Manager upon request .
G. Growth Management Planning: The RECIPIENT certifies by signing this agreement that it is in compliance with the
requirements of Chapter 36.70A RCW, “Growth Management Planning by Selected Counties and Cities.” If the status of
compliance changes, either through RECIPIENT or legislative action, the RECIPIENT shall notify ECOLOGY in writing of
this change within 30 days.
H. Interlocal: The RECIPIENT certifies by signing this agreement that all negotiated interlocal agreements necessary for the
project are, or shall be, consistent with the terms of this agreement and Chapter 39.34 RCW, “Interlocal Cooperation Act.”
The RECIPIENT shall submit a copy of each interlocal agreement necessary for the project to ECOLOGY upon request .
I. Lobbying and Litigation: Costs incurred for the purposes of lobbying or litigation are not eligible for funding under this
agreement.
J. Post Project Assessment Survey: The RECIPIENT agrees to participate in a brief survey regarding the key project results or
water quality project outcomes and the status of long-term environmental results or goals from the project approximately three
years after project completion. A representative from ECOLOGY’s Water Quality Program may contact the RECIPIENT to
request this data. ECOLOGY may also conduct site interviews and inspections , and may otherwise evaluate the project, as
part of this assessment.
K. Project Status Evaluation: ECOLOGY may evaluate the status of this project 18 months from the effective date of this
agreement. ECOLOGY’s Project Manager and Financial Manager will meet with the RECIPIENT to review spending trends ,
completion of outcome measures, and overall project administration and performance. If the RECIPIENT fails to make
satisfactory progress toward achieving project outcomes, ECOLOGY may change the scope of work, reduce grant funds, or
increase oversight measures.
L. Technical Assistance: Technical assistance for agriculture activities provided under the terms of this agreement shall be
consistent with the current U.S. Natural Resource Conservation Service (“NRCS”) Field Office Technical Guide for
Washington State and specific requirements outlined in the Water Quality Funding Guidelines . Technical assistance, proposed
practices, or project designs that do not meet these standards may be eligible if approved in writing by ECOLOGY.
SECTION 3: THE FOLLOWING CONDITIONS APPLY TO SECTION 319 AND CENTENNIAL CLEAN WATER
FUNDED PROJECTS BEING USED TO MATCH SECTION 319 FUNDS.
The RECIPIENT must submit the following documents to ECOLOGY before this agreement is signed by ECOLOGY :
1. Federal Funding Accountability and Transparency Act (FFATA) Form, available on the Water Quality Program website.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 25 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
2. “Section 319 Initial Data Reporting” form in EAGL.
A. Data Reporting: The RECIPIENT must complete the “Section 319 Initial Data Reporting” form in EAGL before this
agreement can be signed by Ecology. This form is used to gather general information about the project for EPA .
B. Funding Recognition and Outreach: In addition to Section 2.F. of these Special Terms and Conditions, the RECIPIENT
shall provide signage that informs the public that the project is funded by EPA . The signage shall contain the EPA logo and
follow usage requirements available at http://www2.epa.gov/stylebook/using-epa-seal-and-logo. To obtain the appropriate
EPA logo or seal graphic file, the RECIPIENT may sent a request to their Ecology Financial Manager.
To increase public awareness of projects serving communities where English is not the predominant language , RECIPIENTS
are encouraged to provide their outreach strategies communication in non-English languages. Translation costs for this purpose
are allowable, provided the costs are reasonable.
The RECIPIENT shall use the following paragraph in all reports, documents, and signage developed under this agreement:
“This project has been funded wholly or in part by the United States Environmental Protection Agency under an assistance
agreement to the Washington State Department of Ecology . The contents of this document do not necessarily reflect the views
and policies of the Environmental Protection Agency , nor does the mention of trade names or commercial products constitute
endorsement or recommendation for use.”
C. Load Reduction Reporting: The RECIPIENT shall complete the “Section 319 Annual Load Reduction Reporting” form in
EAGL by January 15 of each year and at project close-out. ECOLOGY may hold reimbursements until the RECIPIENT has
completed the form. This form is used to gather information on best management practices (BMPs) installed and associated
pollutant load reductions that were funded as a part of this project.
D. Time Extension: The RECIPIENT may request a one-time extension for up to 12 months. However, the time extension
cannot exceed the time limitation established in EPA’s assistance agreement . In the event a time extension is requested and
approved by ECOLOGY, the RECIPIENT must complete all eligible work performed under this agreement by the expiration
date.
SECTION 4: THE FOLLOWING CONDITIONS APPLY TO SECTION 319 AND STATE REVOLVING FUND (SRF)
LOAN FUNDED PROJECTS ONLY.
A. Accounting Standards: The RECIPIENT shall maintain accurate records and accounts for the project (PROJECT Records)
in accordance with Generally Accepted Accounting Principles (GAAP) as issued by the Governmental Accounting Standards
Board (GASB), including standards related to the reporting of infrastructure assets or in accordance with the standards in
Chapter 43.09.200 RCW “Local Government Accounting – Uniform System of Accounting .”
B. Acquisitions: Section 319 and SRF Equivalency project RECIPIENTs shall comply with the terms and conditions of the
Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, 84 Stat. 1894 (1970)--Public Law
91-646, as amended by the Surface Transportation and Uniform Relocation Assistance Act , PL 100-17-1987, and applicable
regulations and procedures of the federal agency implementing that Act .
C. Audit Requirements: In accordance with 2 CFR 200.501(a), the RECIPIENT agrees to obtain a single audit from an
independent auditor, if their organization expends $750,000 or more in total Federal funds in their fiscal year. The
RECIPIENT must submit the form SF-SAC and a Single Audit Report Package within 9 months of the end of the fiscal year
or 30 days after receiving the report from an independent auditor. The SF-SAC and a Single Audit Report Package MUST be
submitted using the Federal Audit Clearinghouse’s Internet Data Entry System available at :
https://harvester.census.gov/fac/collect/ddeindex.html. For complete information on how to accomplish the single audit
submission, go to the Federal Audit Clearinghouse Web site: http://harvester.census.gov/fac/.
D. Archaeological Resources and Historic Properties (Section 106): The RECIPIENT shall comply with the additional
requirements under section 106 of the National Historic Preservation Act (NHPA, 36 CFR 800).
E. Data Universal Numbering System (DUNS) and Central Contractor Registration (CCR) Requirements: RECIPIENTs shall
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 26 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
have a DUNS number. Unless exempted from this requirement under 2 CFR 25.110, the RECIPIENT must ensure that their
organization’s information in the System for Award Management (SAM), https://www.sam.gov, is kept current through project
closeout. This requires that the RECIPIENT reviews and updates the information at least annually after the initial registration ,
and more frequently if information changes.
F. Disadvantaged Business Enterprise (DBE): General Compliance, 40 CFR, Part 33. The RECIPIENT agrees to comply
with the requirements of the Environmental Protection Agency’s Program for Utilization of Small , Minority, and Women’s
Business Enterprises (MBE/WBE) 40CFR, Part 33 in procurement under this agreement.
Six Good Faith Efforts, 40 CFR, Part 33, Subpart C. The RECIPIENT agrees to make the following good faith efforts
whenever procuring construction, equipment, services, and supplies under this agreement. Records documenting compliance
with the following six good faith efforts shall be retained:
1) Ensure Disadvantaged Business Enterprises are made aware of contracting opportunities to the fullest extent practicable
through outreach and recruitment activities. For Indian Tribal, State and Local and Government RECIPIENTs , this shall
include placing Disadvantaged Business Enterprises on solicitation lists and soliciting them whenever they are potential sources.
2) Make information on forthcoming opportunities available to Disadvantaged Business Enterprises and arrange time frames for
contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation
by Disadvantaged Business Enterprises in the competitive process. This includes, whenever possible, posting solicitations for
bids or proposals for a minimum of thirty (30) calendar days before the bid or proposal closing date.
3) Consider, in the contracting process, whether firms competing for large contracts could subcontract with Disadvantaged
Business Enterprises. For Indian Tribal, State, and Local Government RECIPIENTs, this shall include dividing total
requirements when economically feasible into smaller tasks or quantities to permit maximum participation by Disadvantaged
Business Enterprises in the competitive process.
4) Encourage contracting with a consortium of Disadvantaged Business Enterprises when a contract is too large for one of
these firms to handle individually.
5) Use services and assistance of the Small Business Administration and the Minority Business Development Agency of the
Department of Commerce.
6) If the prime contractor awards subcontracts, require the prime contractor to take the five good faith efforts steps in
paragraphs 1 through 5 above.
The RECIPIENT agrees to submit ECOLOGY’s Contractor Participation Report Form D with each payment request .
Contract Administration Provisions, 40 CFR, Section 33.302. The RECIPIENT agrees to comply with the contract
administration provisions of 40 CFR, Section 33.302.
Non-discrimination Provision. The RECIPIENT shall not discriminate on the basis of race , color, national origin or sex in the
performance of this agreement. The RECIPIENT shall carry out applicable requirements of 40 CFR Part 33 in the award and
administration of contracts awarded under EPA financial assistance agreements . Failure by the RECIPIENT to carry out these
requirements is a material breach of this agreement which may result in the termination of this contract or other legally available
remedies.
This does not preclude the RECIPIENT from enacting broader nondiscrimination protections .
The RECIPIENT shall comply with all federal and state nondiscrimination laws, including but not limited to, Title VI and VII of
the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, Title IX of the Education Amendments of 1972,
the Age Discrimination Act of 1975, and Chapter 49.60 RCW, Washington’s Law Against Discrimination, and 42 U.S.C.
12101 et seq, the Americans with Disabilities Act (ADA).
In the event of the RECIPIENT’s noncompliance or refusal to comply with any applicable nondiscrimination law , regulation, or
policy, this agreement may be rescinded, canceled, or terminated in whole or in part and the RECIPIENT may be declared
ineligible for further funding from ECOLOGY. The RECIPIENT shall, however, be given a reasonable time in which to cure
this noncompliance.
The RECIPIENT shall include the following terms and conditions in contracts with all contractors , subcontractors, engineers,
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 27 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
vendors, and any other entity for work or services pertaining to this agreement.
“The Contractor will not discriminate on the basis of race, color, national origin or sex in the performance of this Contract. The
Contractor will carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded
under Environmental Protection Agency financial agreements . Failure by the Contractor to carry out these requirements is a
material breach of this Contract which may result in termination of this Contract or other legally available remedies.”
Bidder List, 40 CFR, Section 33.501(b) and (c). The RECIPIENT agrees to create and maintain a bidders list . The bidders
list shall include the following information for all firms that bid or quote on prime contracts, or bid or quote subcontracts,
including both MBE/WBEs and non-MBE/WBEs.
1. Entity's name with point of contact
2. Entity's mailing address, telephone number, and e-mail address
3. The procurement on which the entity bid or quoted, and when
4. Entity's status as an MBE/WBE or non-MBE/WBE
G. Electronic and information Technology (EIT) Accessibility: RECIPIENTs shall ensure that loan funds provided under this
agreement for costs in the development or purchase of EIT systems or products provide individuals with disabilities reasonable
accommodations and an equal and effective opportunity to benefit from or participate in a program , including those offered
through electronic and information technology as per Section 504 of the Rehabilitation Act, codified in 40 CFR Part 7.
Systems or products funded under this agreement must be designed to meet the diverse needs of users without barriers or
diminished function or quality. Systems shall include usability features or functions that accommodate the needs of persons with
disabilities, including those who use assistive technology.
H. Hotel-Motel Fire Safety Act: The RECIPIENT shall ensure that all space for conferences , meetings, conventions or training
seminars funded in whole or in part with federal funds complies with the protection and control guidelines of the Hotel and
Motel Fire Safety Act (15 USC 2225a, PL 101-391, as amended). Recipients may search the Hotel-Motel National Master
List at http://www.usfa.dhs.gov/applications/hotel/ to see if a property is in compliance, or to find other information about the
Act. Pursuant to 15 USC 2225a.
I. Trafficking In Persons: The RECIPIENT and RECIPIENT employees that are private entities shall not engage in forms of
trafficking in persons during the period of time this agreement is effective . This includes, but is not limited to, the procurement
of a commercial sex act or forced labor. The RECIPIENT shall notify ECOLOGY immediately of any information received
from any source alleging a violation under this provision.
SECTION 5: THE FOLLOWING CONDITIONS APPLY TO STATE REVOLVING FUND (SRF) LOAN FUNDED
PROJECTS ONLY.
The RECIPIENT must submit the following documents/forms to ECOLOGY before this agreement is signed by ECOLOGY :
1. Financial Capability Assessment Documentation
2. Opinion of RECIPIENT’s Legal Council
3. Authorizing Ordinance or Resolution
4. Federal Funding Accountability and Transparency Act (FFATA) Form
5. CWSRF Federal Reporting Information form available in EAGL
6. Fiscal Sustainability Plan Certification Form (only required if the project includes construction of a wastewater or
stormwater facility construction)
7. Cost and Effectiveness Analysis Certification Form
A. Alteration and Eligibility of Project: During the term of this agreement, the RECIPIENT (1) shall not materially alter the
design or structural character of the project without the prior written approval of ECOLOGY and (2) shall take no action
which would adversely affect the eligibility of the project as defined by applicable funding program rules and state statutes , or
which would cause a violation of any covenant, condition, or provision herein.
B. American Iron and Steel (Buy American): This loan provision applies to projects for the construction, alteration,
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 28 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
maintenance, or repair of a “treatment works” as defined in the Federal Water Pollution Control Act (33 USC 1381 et seq.)
The RECIPIENT shall ensure that all iron and steel products used in the project are produced in the United States . Iron and
Steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers
and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast
concrete, and construction materials. The RECIPIENT may request waiver from this requirement from the Administrator of
the Environmental Protection Agency. The RECIPIENT must coordinate all waiver requests through ECOLOGY . This
provision does not apply if the engineering plans and specifications for the project were approved by ECOLOGY prior to
January 17, 2014. ECOLOGY reserves the right to request documentation of RECIPIENT’S compliance with this provision .
C. Authority of RECIPIENT: This agreement is authorized by the Constitution and laws of the state of Washington , including
the RECIPIENT’s authority, and by the RECIPIENT pursuant to the authorizing ordinance or resolution . The RECIPIENT
shall submit a copy of the authorizing ordinance or resolution to the ECOLOGY Financial Manager before this agreement shall
be signed by ECOLOGY.
D. Equivalency Projects: (For designated equivalency projects only)
1. The RECIPIENT must procure architectural and engineering services in accordance with the federal requirements in
Chapter 11 of Title 40, U.S.C. (see
www.gpo.gov/fdsys/pkg/USCODE-2011-title40/pdf/USCODE-2011-title40-subtitleI-chap11.pdf).
E. Fiscal Sustainability Plan Certification: The RECIPIENT shall submit a completed Fiscal Sustainability Plan Certification
before this agreement is signed by ECOLOGY. The Fiscal Sustainability Plan Certification is available from the ECOLOGY
Financial Manager or on the Water Quality Program website .
F. Funding Recognition and Outreach: In addition to Section 2.F of these Terms and Conditions, the
RECIPIENT agrees to comply with the EPA SRF Signage Guidance in order to enhance public awareness of EPA assistance
agreements nationwide. The signage guidance can be found at:
http://www.ecy.wa.gov/programs/wq/funding/FundPrgms/CWSRF/SignageGuidanceJune2015.pdf.
G. Insurance: The RECIPIENT shall at all times carry fire and extended insurance coverage , public liability, and property
damage, and such other forms of insurance with responsible insurers and policies payable to the RECIPIENT on such of the
buildings, equipment, works, plants, facilities, and properties of the Utility as are ordinarily carried by municipal or
privately-owned utilities engaged in the operation of like systems, and against such claims for damages as are ordinarily carried
by municipal or privately-owned utilities engaged in the operation of like systems, or it shall self-insure or participate in an
insurance pool or pools with reserves adequate, in the reasonable judgment of the RECIPIENT, to protect it against loss.
H. Litigation Authority: No litigation is now pending, or to the RECIPIENT’s knowledge, threatened, seeking to restrain, or
enjoin:
(i) the execution of this agreement; or
(ii) the fixing or collection of the revenues, rates, and charges or the formation of the ULID and the levy and collection of
ULID Assessments therein pledged to pay the principal of and interest on the loan (for revenue secured lien obligations); or
(iii) the levy and collection of the taxes pledged to pay the principal of and interest on the loan (for general obligation-secured
loans and general obligation payable from special-assessment-secured loans); or
(iv) in any manner questioning the proceedings and authority under which the agreement, the loan, or the project are
authorized. Neither the corporate existence, or boundaries of the RECIPIENT nor the title of its present officers to their
respective offices is being contested . No authority or proceeding for the execution of this agreement has been repealed,
revoked, or rescinded.
I. Loan Interest Rate and Terms: This loan agreement shall remain in effect until the date of final repayment of the loan , unless
terminated earlier according to the provisions herein.
When the Project Completion Date has occurred, ECOLOGY and the RECIPIENT shall execute an amendment to this loan
agreement which details the final loan amount (Final Loan Amount), and ECOLOGY shall prepare a final loan repayment
schedule. The Final Loan Amount shall be the combined total of actual disbursements made on the loan and all accrued
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 29 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
interest to the computation date.
The Estimated Loan Amount and the Final Loan Amount (in either case, as applicable, a “Loan Amount”) shall bear interest
based on the interest rate identified in this agreement as the “Effective Interest Rate ,” per annum, calculated on the basis of a
365 day year. Interest on the Estimated Loan Amount shall accrue from and be compounded monthly based on the date that
each payment is mailed to the RECIPIENT. The Final Loan Amount shall be repaid in equal installments , semiannually, over
the term of this loan “Loan Term” as outlined in this agreement .
J. Loan Repayment:
Sources of Loan Repayment
1. Nature of RECIPIENT's Obligation. The obligation of the RECIPIENT to repay the loan from the sources identified below
and to perform and observe all other agreements and obligations on its part, contained herein, shall be absolute and
unconditional, and shall not be subject to diminution by setoff , counterclaim, or abatement of any kind. To secure the
repayment of the loan from ECOLOGY, the RECIPIENT agrees to comply with all of the covenants , agreements, and
attachments contained herein.
2. For General Obligation. This loan is a General Obligation Debt of the RECIPIENT.
3. For General Obligation Payable from Special Assessments . This loan is a General Obligation Debt of the RECIPIENT
payable from special assessments to be imposed within the constitutional and statutory tax limitations provided by law without
a vote of the electors of the RECIPIENT on all of the taxable property within the boundaries of the RECIPIENT .
4. For Revenue-Secured: Lien Position. This loan is a Revenue-Secured Debt of the RECIPIENT’s Utility. This loan shall
constitute a lien and charge upon the Net Revenue junior and subordinate to the lien and charge upon such Net Revenue of any
Senior Lien Obligations.
In addition, if this loan is also secured by Utility Local Improvement Districts (ULID) Assessments, this loan shall constitute a
lien upon ULID Assessments in the ULID prior and superior to any other charges whatsoever .
5. Other Sources of Repayment. The RECIPIENT may repay any portion of the loan from any funds legally available to it .
6. Defeasance of the Loan. So long as ECOLOGY shall hold this loan, the RECIPIENT shall not be entitled to, and shall not
affect, an economic Defeasance of the loan. The RECIPIENT shall not advance refund the loan.
If the RECIPIENT defeases or advance refunds the loan , it shall be required to use the proceeds thereof immediately upon
their receipt, together with other available RECIPIENT funds, to repay both of the following:
(i) The Loan Amount with interest
(ii) Any other obligations of the RECIPIENT to ECOLOGY under this agreement , unless in its sole discretion ECOLOGY
finds that repayment from those additional sources would not be in the public interest.
Failure to repay the Loan Amount plus interest within the time specified in ECOLOGY’s notice to make such repayment shall
incur Late Charges and shall be treated as a Loan Default.
7. Refinancing or Early Repayment of the Project. So long as ECOLOGY shall hold this loan, the RECIPIENT shall give
ECOLOGY thirty days written notice if the RECIPIENT intends to refinance or make early repayment of the loan .
Method and Conditions on Repayments
1. Semiannual Payments. Notwithstanding any other provision of this agreement, the first semiannual payment of principal and
interest on this loan shall be due and payable no later than one year after the project completion date or initiation of operation
date, whichever comes first.
Thereafter, equal payments shall be due every six months.
If the due date for any semiannual payment falls on a Saturday, Sunday, or designated holiday for Washington State agencies ,
the payment shall be due on the next business day for Washington State agencies .
Payments shall be mailed to:
Department of Ecology
Cashiering Unit
P.O. Box 47611
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 30 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Olympia WA 98504-7611
In lieu of mailing payments, electronic fund transfers can be arranged by working with ECOLOGY’s Financial Manager .
No change to the amount of the semiannual principal and interest payments shall be made without a mutually signed amendment
to this agreement. The RECIPIENT shall continue to make semiannual payments based on this agreement until the amendment
is effective, at which time the RECIPIENT’s payments shall be made pursuant to the amended agreement .
2. Late Charges. If any amount of the Final Loan Amount or any other amount owed to ECOLOGY pursuant to this
agreement remains unpaid after it becomes due and payable, ECOLOGY may assess a late charge . The late charge shall be
one percent per month on the past due amount starting on the date the debt becomes past due and until it is paid in full.
3. Repayment Limitations. Repayment of the loan is subject to the following additional limitations, among others: those on
defeasance, refinancing and advance refunding, termination, and default and recovery of payments.
4. Prepayment of Loan. So long as ECOLOGY shall hold this loan, the RECIPIENT may prepay the entire unpaid principal
balance of and accrued interest on the loan or any portion of the remaining unpaid principal balance of the Loan Amount . Any
prepayments on the loan shall be applied first to any accrued interest due and then to the outstanding principal balance of the
Loan Amount. If the RECIPIENT elects to prepay the entire remaining unpaid balance and accrued interest , the RECIPIENT
shall first contact ECOLOGY’s Revenue/Receivable Manager of the Fiscal Office .
K. Loan Security
Due Regard: For loans secured with a Revenue Obligation: The RECIPIENT shall exercise due regard for Maintenance and
Operation Expense and the debt service requirements of the Senior Lien Obligations and any other outstanding obligations
pledging the Gross Revenue of the Utility, and it has not obligated itself to set aside and pay into the loan Fund a greater
amount of the Gross Revenue of the Utility than, in its judgment, shall be available over and above such Maintenance and
Operation Expense and those debt service requirements.
Where collecting adequate gross utility revenue requires connecting additional users, the RECIPIENT shall require the sewer
system connections necessary to meet debt obligations and expected operation and maintenance expenses.
Levy and Collection of Taxes (if used to secure the repayment of the loan): For so long as the loan is outstanding, the
RECIPIENT irrevocably pledges to include in its budget and levy taxes annually within the constitutional and statutory tax
limitations provided by law without a vote of its electors on all of the taxable property within the boundaries of the
RECIPIENT in an amount sufficient, together with other money legally available and to be used therefore, to pay when due the
principal of and interest on the loan, and the full faith, credit and resources of the RECIPIENT are pledged irrevocably for the
annual levy and collection of those taxes and the prompt payment of that principal and interest.
Not an Excess Indebtedness: For loans secured with a general obligation pledge or a general obligation pledge on special
assessments: The RECIPIENT agrees that this agreement and the loan to be made do not create an indebtedness of the
RECIPIENT in excess of any constitutional or statutory limitations .
Pledge of Net Revenue and ULID Assessments in the ULID (if used to secure the repayment of this loan): For so long as the
loan is outstanding, the RECIPIENT irrevocably pledges the Net Revenue of the Utility , including applicable ULID
Assessments in the ULID, to pay when due the principal of and interest on the loan.
Utility Local Improvement District (ULID) Assessment Collection (if used to secure the repayment of the loan): All ULID
Assessments in the ULID shall be paid into the Loan Fund and used to pay the principal of and interest on the loan.
L. Maintenance and Operation of a Funded Utility: The RECIPIENT shall, at all times, maintain and keep the funded Utility in
good repair, working order, and condition.
M. Opinion of RECIPIENT’s Legal Counsel: The RECIPIENT must submit an “Opinion of Legal Counsel to the
RECIPIENT” to ECOLOGY before this agreement will be signed. ECOLOGY will provide the form.
N. Prevailing Wage (Davis-Bacon Act): The RECIPIENT agrees, by signing this agreement, to comply with the Davis-Bacon
Act prevailing wage requirements. This applies to the construction, alteration, and repair of treatment works carried out, in
whole or in part, with assistance made available by the State Revolving Fund as authorized by Section 513, title VI of the
Federal Water Pollution Control Act (33 U.S.C. 1372). Laborers and mechanics employed by contractors and
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 31 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
subcontractors shall be paid wages not less often than once a week and at rates not less than those prevailing on projects of a
character similar in the locality as determined by the Secretary of Labor.
The RECIPIENT shall obtain the wage determination for the area in which the project is located prior to issuing requests for
bids, proposals, quotes or other methods for soliciting contracts (solicitation). These wage determinations shall be
incorporated into solicitations and any subsequent contracts. The RECIPIENT shall ensure that the required EPA contract
language regarding Davis-Bacon Wages is in all contracts and sub contracts in excess of $2,000. The RECIPIENT shall
maintain records sufficient to document compliance with the Davis -Bacon Act, and make such records available for review
upon request.
The RECIPIENT also agrees, by signing this agreement, to comply with State Prevailing Wages on Public Works, Chapter
39.12 RCW, as applicable. Compliance may include the determination whether the project involves “public work” and
inclusion of the applicable prevailing wage rates in the bid specifications and contracts. The RECIPIENT agrees to maintain
records sufficient to evidence compliance with Chapter 39.12 RCW, and make such records available for review upon
request.
O. Progress Reports: RECIPIENTS funded with State Revolving Fund Loan or Forgivable Principal shall include the
following verification statement in the “General Comments” text box of each progress report.
“We verify that we are in compliance with all the requirements as outlined in our funding agreement (s) with the Department of
Ecology. This includes but is not limited to:
- The Davis-Bacon Act, 29 CFR (If applicable)
- Washington State Prevailing Wage Rate, Chapter 39.12 RCW (Pertaining to all recipients)
- The Disadvantaged Business Enterprise (DBE), 40 CFR, Part 33”
P. Representations and Warranties: The RECIPIENT represents and warrants to ECOLOGY as follows:
Application: Material Information. All information and materials submitted by the RECIPIENT to ECOLOGY in connection
with its loan application were, when made, and are, as of the date the RECIPIENT signs this agreement, true and correct.
There is no material adverse information relating to the RECIPIENT, the project, the loan, or this agreement known to the
RECIPIENT, which has not been disclosed in writing to ECOLOGY.
Existence; Authority. It is a duly formed and legally existing municipal corporation or political subdivision of the state of
Washington or a federally recognized Indian Tribe . It has full corporate power and authority to execute, deliver, and perform
all of its obligations under this agreement and to undertake the project identified herein.
Certification. Each payment request shall constitute a certification by the RECIPIENT to the effect that all representations and
warranties made in this loan agreement remain true as of the date of the request and that no adverse developments, affecting
the financial condition of the RECIPIENT or its ability to complete the project or to repay the principal of or interest on the
loan, have occurred since the date of this loan agreement. Any changes in the RECIPIENT’s financial condition shall be
disclosed in writing to ECOLOGY by the RECIPIENT in its request for payment .
Q. Sale or Disposition of Funded Utility: The RECIPIENT shall not sell, transfer, or otherwise dispose of any of the works,
plant, properties, facilities, or other part of the funded Utility or any real or personal property comprising a part of the funded
Utility unless:
1. The facilities or property transferred are not material to the operation of the funded Utility, or have become
unserviceable, inadequate, obsolete, or unfit to be used in the operation of the funded Utility or are no longer necessary,
material, or useful to the operation of the funded Utility; or
2. The aggregate depreciated cost value of the facilities or property being transferred in any fiscal year comprises no more
than three percent of the total assets of the funded Utility; or
3. The RECIPIENT receives from the transferee an amount equal to an amount which will be in the same proportion to
the net amount of Senior Lien Obligations and this LOAN then outstanding (defined as the total amount outstanding less the
amount of cash and investments in the bond and loan funds securing such debt) as the Gross Revenue of the funded Utility from
the portion of the funded Utility sold or disposed of for the preceding year bears to the total Gross Revenue for that period.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 32 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
4. Expressed written agreement by the ECOLOGY-.
The proceeds of any transfer under this paragraph must be used (1) to redeem promptly, or irrevocably set aside for the
redemption of, Senior Lien Obligations and to redeem promptly the loan, and (2) to provide for part of the cost of additions to
and betterments and extensions of the Utility.
R. Sewer-Use Ordinance or Resolution for Funded Wastewater Facility Projects : If not already in existence, the RECIPIENT
shall adopt and shall enforce a sewer-use ordinance or resolution. Such ordinance or resolution shall be submitted to
ECOLOGY upon request.
The sewer use ordinance must include provisions to:
1) Prohibit the introduction of toxic or hazardous wastes into the RECIPIENT’s sewer system .
2) Prohibit inflow of stormwater into separated sewer systems.
3) Require that new sewers and connections be properly designed and constructed.
S. Termination and Default:
Termination and Default Events
1. For Insufficient ECOLOGY or RECIPIENT Funds. ECOLOGY may terminate this loan agreement for insufficient
ECOLOGY or RECIPIENT funds.
2. For Failure to Commence Work. ECOLOGY may terminate this loan agreement for failure of the RECIPIENT to
commence project work.
3. Past Due Payments. The RECIPIENT shall be in default of its obligations under this loan agreement when any loan
repayment becomes 60 days past due.
4. Other Cause. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance in full by the
RECIPIENT of all of its obligations under this loan agreement . The RECIPIENT shall be in default of its obligations under this
loan agreement if, in the opinion of ECOLOGY, the RECIPIENT has unjustifiably failed to perform any obligation required of
it by this loan agreement.
Procedures for Termination. If this loan agreement is terminated prior to project completion, ECOLOGY shall provide to the
RECIPIENT a written notice of termination at least five working days prior to the effective date of termination (the
“Termination Date”). The written notice of termination by the ECOLOGY shall specify the Termination Date and , when
applicable, the date by which the RECIPIENT must repay any outstanding balance of the loan and all accrued interest (the
“Termination Payment Date”).
Termination and Default Remedies
No Further Payments. On and after the Termination Date, or in the event of a default event, ECOLOGY may, at its sole
discretion, withdraw the loan and make no further payments under this agreement.
Repayment Demand. In response to an ECOLOGY initiated termination event , or in response to a loan default event,
ECOLOGY may at its sole discretion demand that the RECIPIENT repay the outstanding balance of the Loan Amount and all
accrued interest.
Interest after Repayment Demand. From the time that ECOLOGY demands repayment of funds, amounts owed by the
RECIPIENT to ECOLOGY shall accrue additional interest at the rate of one percent per month , or fraction thereof.
Accelerate Repayments. In the event of a default, ECOLOGY may, in its sole discretion, declare the principal of and interest
on the loan immediately due and payable, subject to the prior lien and charge of any outstanding Senior Lien Obligation upon
the Net Revenue. That is, the loan is not subject to acceleration so long as any Senior Lien Obligations are outstanding.
Repayments not made immediately upon such acceleration will incur Late Charges .
Late Charges. All amounts due to ECOLOGY and not paid by the RECIPIENT by the Termination Payment Date or after
acceleration following a default event, as applicable, shall incur late charges.
Intercept State Funds. In the event of a default event and in accordance with Chapter 90.50A.060 RCW, “Defaults,” any
state funds otherwise due to the RECIPIENT may, at ECOLOGY’s sole discretion, be withheld and applied to the repayment
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 33 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
of the loan.
Property to ECOLOGY. In the event of a default event and at the option of ECOLOGY, any personal property (equipment)
acquired under this agreement may, in ECOLOGY’s sole discretion, become ECOLOGY’s property. In that circumstance,
ECOLOGY shall reduce the RECIPIENT’s liability to repay money by an amount reflecting the fair value of such property .
Documents and Materials. If this agreement is terminated, all finished or unfinished documents, data studies, surveys,
drawings, maps, models, photographs, and reports or other materials prepared by the RECIPIENT shall , at the option of
ECOLOGY, become ECOLOGY property . The RECIPIENT shall be entitled to receive just and equitable compensation for
any satisfactory work completed on such documents and other materials.
Collection and Enforcement Actions. In the event of a default event, the state of Washington reserves the right to take any
actions it deems necessary to collect the amounts due, or to become due, or to enforce the performance and observance of
any obligation by the RECIPIENT, under this agreement.
Fees and Expenses. In any action to enforce the provisions of this agreement, reasonable fees and expenses of attorneys and
other reasonable expenses (including, without limitation, the reasonably allocated costs of legal staff ) shall be awarded to the
prevailing party as that term is defined in Chapter 4.84.330 RCW.
Damages. Notwithstanding ECOLOGY’s exercise of any or all of the termination or default remedies provided in this
agreement, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by ECOLOGY and /or
the state of Washington because of any breach of this agreement by the RECIPIENT . ECOLOGY may withhold payments for
the purpose of setoff until such time as the exact amount of damages due ECOLOGY from the RECIPIENT is determined .
T. User-Charge System for Funded Utilities: The RECIPIENT certifies that it has the legal authority to establish and implement
a user-charge system and shall adopt a system of user -charges to assure that each user of the funded utility shall pay its
proportionate share of the cost of operation and maintenance, including replacement during the design life of the project. The
user-charge system will include provisions for a connection charge .
In addition, the RECIPIENT shall regularly evaluate the user-charge system, at least annually, to ensure the system provides
adequate revenues necessary to operate and maintain the funded utility, to establish reserves to pay for replacement, and to
repay the loan.
GENERAL FEDERAL CONDITIONS
If a portion or all of the funds for this agreement are provided through federal funding sources or this agreement is
used to match a federal grant award, the following terms and conditions apply to you.
A. CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY
EXCLUSION:
1.The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred, proposed for
debarment, declared ineligible or otherwise excluded from contracting with the federal government, or from receiving
contracts paid for with federal funds. If the RECIPIENT/CONTRACTOR is unable to certify to the statements
contained in the certification, they must provide an explanation as to why they cannot.
2.The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become erroneous by
reason of changed circumstances.
3.The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant, person,
primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meaning set
out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact
ECOLOGY for assistance in obtaining a copy of those regulations .
4.The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction with a
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 34 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
person who is proposed for debarment under the applicable Code of Federal Regulations, debarred, suspended,
declared ineligible, or voluntarily excluded from participation in this covered transaction.
5.The RECIPIENT/CONTRACTOR further agrees by signing this agreement , that it will include this clause titled
“CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY
EXCLUSION” without modification in all lower tier covered transactions and in all solicitations for lower tier covered
transactions.
6.Pursuant to 2CFR180.330, the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier covered
transaction complies with certification of suspension and debarment requirements.
7.RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of Federal
Regulations may result in the delay or negation of this funding agreement, or pursuance of legal remedies, including
suspension and debarment.
8.RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file , that it, and all lower tier recipients or
contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for
reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in
<http://www.sam.gov> and print a copy of completed searches to document proof of compliance.
B. FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA) REPORTING
REQUIREMENTS:
CONTRACTOR/RECIPIENT must complete the FFATA Data Collection Form (ECY 070-395) and return it with the
signed agreement to ECOLOGY.
Any CONTRACTOR/RECIPIENT that meets each of the criteria below must report compensation for its five
top executives using the FFATA Data Collection Form .
·Receives more than $25,000 in federal funds under this award.
·Receives more than 80 percent of its annual gross revenues from federal funds.
·Receives more than $25,000,000 in annual federal funds.
Ecology will not pay any invoices until it has received a completed and signed FFATA Data Collection Form . Ecology is
required to report the FFATA information for federally funded agreements , including the required DUNS number, at
www.fsrs.gov <http://www.fsrs.gov/> within 30 days of agreement signature. The FFATA information will be available to
the public at www.usaspending.gov <http://www.usaspending.gov/>.
For more details on FFATA requirements, see www.fsrs.gov <http://www.fsrs.gov/>.
C. FEDERAL FUNDING PROHIBITION ON CERTAIN TELECOMMUNICATIONS OR VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT:
As required by 2 CFR 200.216, federal grant or loan recipients and subrecipients are prohibited from obligating or expending
loan or grant funds to:
1.Procure or obtain;
2.Extend or renew a contract to procure or obtain; or
3.Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that use
covered telecommunications equipment, video surveillance services or services as a substantial or essential component
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 35 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
of any system, or as critical technology as part of any system. As described in Public Law 115-232
<https://www.govinfo.gov/content/pkg/PLAW-115publ232/pdf/PLAW-115publ232.pdf>, section 889, covered
telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE
Corporation (or any subsidiary or affiliate of such entities ).
Recipients, subrecipients, and borrowers also may not use federal funds to purchase certain prohibited equipment, systems, or
services, including equipment, systems, or services produced or provided by entities identified in section 889, are recorded in
the System for Award Management (SAM) <https://sam.gov/SAM/> exclusion list.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 36 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
GENERAL TERMS AND CONDITIONS
Pertaining to Grant and Loan Agreements With the state of Washington, Department of Ecology
GENERAL TERMS AND CONDITIONS AS OF LAST UPDATED 7-1-2019 VERSION
1.ADMINISTRATIVE REQUIREMENTS
a)RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans – EAGL Edition ."
(https://fortress.wa.gov/ecy/publications/SummaryPages/1701004.html)
b)RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper management of all
funds and resources made available under this Agreement .
c)RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement , including ensuring all
subgrantees and contractors comply with the terms and conditions of this Agreement . ECOLOGY reserves the right to request
proof of compliance by subgrantees and contractors.
d)RECIPIENT’s activities under this Agreement shall be subject to the review and approval by ECOLOGY for the extent
and character of all work and services.
2.AMENDMENTS AND MODIFICATIONS
This Agreement may be altered, amended, or waived only by a written amendment executed by both parties. No subsequent
modification(s) or amendment(s) of this Agreement will be of any force or effect unless in writing and signed by authorized
representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff contacts and administrative
information without the concurrence of either party.
3.ACCESSIBILITY REQUIREMENTS FOR COVERED TECHNOLOGY
The RECIPIENT must comply with the Washington State Office of the Chief Information Officer , OCIO Policy no. 188,
Accessibility (https://ocio.wa.gov/policy/accessibility) as it relates to “covered technology.” This requirement applies to all
products supplied under the agreement, providing equal access to information technology by individuals with disabilities,
including and not limited to web sites/pages, web-based applications, software systems, video and audio content, and electronic
documents intended for publishing on Ecology’s public web site .
4.ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take reasonable action to avoid, minimize, or mitigate adverse effects to archeological and historic resources .
The RECIPIENT must agree to hold harmless the State of Washington in relation to any claim related to historical or cultural
artifacts discovered, disturbed, or damaged due to the RECIPIENT’s project funded under this Agreement .
RECIPIENT shall:
a)Contact the ECOLOGY Program issuing the grant or loan to discuss any Cultural Resources requirements for their project :
•For capital construction projects or land acquisitions for capital construction projects, if required, comply with Governor
Executive Order 05-05, Archaeology and Cultural Resources.
•For projects with any federal involvement, if required, comply with the National Historic Preservation Act .
•Any cultural resources federal or state requirements must be completed prior to the start of any work on the project site.
b)If required by the ECOLOGY Program, submit an Inadvertent Discovery Plan (IDP) to ECOLOGY prior to implementing
any project that involves ground disturbing activities. ECOLOGY will provide the IDP form.
RECIPIENT shall:
•Keep the IDP at the project site.
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 37 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
•Make the IDP readily available to anyone working at the project site .
•Discuss the IDP with staff and contractors working at the project site .
•Implement the IDP when cultural resources or human remains are found at the project site .
c)If any archeological or historic resources are found while conducting work under this Agreement :
•Immediately stop work and notify the ECOLOGY Program , the Department of Archaeology and Historic Preservation at
(360) 586-3064, any affected Tribe, and the local government.
d)If any human remains are found while conducting work under this Agreement :
•Immediately stop work and notify the local Law Enforcement Agency or Medical Examiner /Coroner’s Office, and then the
ECOLOGY Program.
e)Comply with RCW 27.53, RCW 27.44.055, and RCW 68.50.645, and all other applicable local, state, and federal laws
protecting cultural resources and human remains.
5.ASSIGNMENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT .
6.COMMUNICATION
RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT 's designees, ECOLOGY, all
affected local, state, or federal jurisdictions, and any interested individuals or groups.
7.COMPENSATION
a)Any work performed prior to effective date of this Agreement will be at the sole expense and risk of the RECIPIENT .
ECOLOGY must sign the Agreement before any payment requests can be submitted .
b)Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement .
c)RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be clarified with
ECOLOGY prior to incurring costs. Costs that are conditionally eligible require approval by ECOLOGY prior to expenditure .
d)RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY .
e)ECOLOGY will not process payment requests without the proper reimbursement forms , Progress Report and supporting
documentation. ECOLOGY will provide instructions for submitting payment requests .
f)ECOLOGY will pay the RECIPIENT thirty (30) days after receipt of a properly completed request for payment.
g)RECIPIENT will receive payment through Washington State’s Office of Financial Management’s Statewide Payee Desk .
To receive payment you must register as a statewide vendor by submitting a statewide vendor registration form and an IRS W -9
form at website, https://ofm.wa.gov/it-systems/statewide-vendorpayee-services. If you have questions about the vendor
registration process, you can contact Statewide Payee Help Desk at (360) 407-8180 or email PayeeRegistration@ofm.wa.gov.
h)ECOLOGY may, at its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT fails to
satisfactorily comply with any term or condition of this Agreement .
i)Monies withheld by ECOLOGY may be paid to the RECIPIENT when the work described herein , or a portion thereof,
has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to this Agreement ,
as appropriate, or upon completion of an audit as specified herein.
j)RECIPIENT must submit within thirty (30) days after the expiration date of this Agreement , all financial, performance, and
other reports required by this agreement. Failure to comply may result in delayed reimbursement.
8.COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable federal, state and local laws, orders, regulations, and permits related to
this Agreement, including but not limited to:
a)RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State of
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 38 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
Washington which affect wages and job safety .
b)RECIPIENT agrees to be bound by all applicable federal and state laws , regulations, and policies against discrimination.
c)RECIPIENT certifies full compliance with all applicable state industrial insurance requirements .
d)RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits required
by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their project timeline for the
permit and approval processes.
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the RECIPIENT fails to
comply with above requirements.
If any provision of this Agreement violates any statute or rule of law of the state of Washington , it is considered modified to
conform to that statute or rule of law.
9.CONFLICT OF INTEREST
RECIPIENT and ECOLOGY agree that any officer, member, agent, or employee, who exercises any function or responsibility
in the review, approval, or carrying out of this Agreement, shall not have any personal or financial interest, direct or indirect, nor
affect the interest of any corporation, partnership, or association in which he/she is a part, in this Agreement or the proceeds
thereof.
10.CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goods or services related to its performance under this Agreement . RECIPIENT shall award
all contracts for construction, purchase of goods, equipment, services, and professional architectural and engineering services
through a competitive process, if required by State law. RECIPIENT is required to follow procurement procedures that ensure
legal, fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures . RECIPIENT may be
required to provide written certification that they have followed their standard procurement procedures and applicable state law
in awarding contracts under this Agreement .
ECOLOGY reserves the right to inspect and request copies of all procurement documentation , and review procurement
practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with state
procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY’s sole discretion .
11.DISPUTES
When there is a dispute with regard to the extent and character of the work, or any other matter related to this Agreement the
determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal decisions as provided for
below:
a)RECIPIENT notifies the funding program of an appeal request .
b)Appeal request must be in writing and state the disputed issue(s).
c)RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal .
d)ECOLOGY reviews the RECIPIENT’s appeal.
e)ECOLOGY sends a written answer within ten (10) business days, unless more time is needed, after concluding the review.
The decision of ECOLOGY from an appeal will be final and conclusive , unless within thirty (30) days from the date of such
decision, the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the Director or duly
authorized representative will be final and conclusive.
The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal.
Appeals of the Director's decision will be brought in the Superior Court of Thurston County . Review of the Director’s decision
will not be taken to Environmental and Land Use Hearings Office .
Pending final decision of a dispute, the RECIPIENT agrees to proceed diligently with the performance of this Agreement and in
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 39 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
accordance with the decision rendered.
Nothing in this Agreement will be construed to limit the parties’ choice of another mutually acceptable method , in addition to the
dispute resolution procedure outlined above.
12.ENVIRONMENTAL DATA STANDARDS
a)RECIPIENT shall prepare a Quality Assurance Project Plan (QAPP) for a project that collects or uses environmental
measurement data. RECIPIENTS unsure about whether a QAPP is required for their project shall contact the ECOLOGY
Program issuing the grant or loan. If a QAPP is required, the RECIPIENT shall:
•Use ECOLOGY’s QAPP Template/Checklist provided by the ECOLOGY, unless ECOLOGY Quality Assurance (QA)
officer or the Program QA coordinator instructs otherwise.
•Follow ECOLOGY’s Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies , July 2004
(Ecology Publication No. 04-03-030).
•Submit the QAPP to ECOLOGY for review and approval before the start of the work .
b)RECIPIENT shall submit environmental data that was collected on a project to ECOLOGY using the Environmental
Information Management system (EIM), unless the ECOLOGY Program instructs otherwise. The RECIPIENT must confirm
with ECOLOGY that complete and correct data was successfully loaded into EIM , find instructions at:
http://www.ecy.wa.gov/eim.
c)RECIPIENT shall follow ECOLOGY’s data standards when Geographic Information System (GIS) data is collected and
processed. Guidelines for Creating and Accessing GIS Data are available at :
https://ecology.wa.gov/Research-Data/Data-resources/Geographic-Information-Systems-GIS/Standards. RECIPIENT, when
requested by ECOLOGY, shall provide copies to ECOLOGY of all final GIS data layers, imagery, related tables, raw data
collection files, map products, and all metadata and project documentation.
13.GOVERNING LAW
This Agreement will be governed by the laws of the State of Washington , and the venue of any action brought hereunder will be
in the Superior Court of Thurston County.
14.INDEMNIFICATION
ECOLOGY will in no way be held responsible for payment of salaries , consultant's fees, and other costs related to the project
described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit , each party will indemnify and hold the other
harmless from and against any liability for any or all injuries to persons or property arising from the negligent act or omission of
that party or that party's agents or employees arising out of this Agreement .
15.INDEPENDENT STATUS
The employees, volunteers, or agents of each party who are engaged in the performance of this Agreement will continue to be
employees, volunteers, or agents of that party and will not for any purpose be employees, volunteers, or agents of the other
party.
16.KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement to give up
any part of the compensation to which he/she is otherwise entitled to or receive any fee, commission, or gift in return for award
of a subcontract hereunder.
17.MINORITY AND WOMEN’S BUSINESS ENTERPRISES (MWBE)
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 40 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
RECIPIENT is encouraged to solicit and recruit, to the extent possible, certified minority-owned (MBE) and women-owned
(WBE) businesses in purchases and contracts initiated under this Agreement .
Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged to
take the following actions, when possible, in any procurement under this Agreement :
a)Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of goods or
services.
b)Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum participation
by qualified minority and women's businesses.
c)Establish delivery schedules, where work requirements permit, which will encourage participation of qualified minority and
women's businesses.
d)Use the services and assistance of the Washington State Office of Minority and Women 's Business Enterprises (OMWBE)
(866-208-1064) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as appropriate.
18.ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement, unless otherwise provided herein, the inconsistency shall be resolved by giving
precedence in the following order: (a) applicable federal and state statutes and regulations; (b) The Agreement; (c) Scope of
Work; (d) Special Terms and Conditions; (e) Any provisions or terms incorporated herein by reference, including the
"Administrative Requirements for Recipients of Ecology Grants and Loans"; (f) Ecology Funding Program Guidelines; and (g)
General Terms and Conditions.
19.PRESENTATION AND PROMOTIONAL MATERIALS
ECOLOGY reserves the right to approve RECIPIENT’s communication documents and materials related to the fulfillment of
this Agreement:
a)If requested, RECIPIENT shall provide a draft copy to ECOLOGY for review and approval ten (10) business days prior
to production and distribution.
b)RECIPIENT shall include time for ECOLOGY’s review and approval process in their project timeline .
c)If requested, RECIPIENT shall provide ECOLOGY two (2) final copies and an electronic copy of any tangible products
developed.
Copies include any printed materials, and all tangible products developed such as brochures, manuals, pamphlets, videos, audio
tapes, CDs, curriculum, posters, media announcements, or gadgets with a message, such as a refrigerator magnet, and any
online communications, such as web pages, blogs, and twitter campaigns. If it is not practical to provide a copy, then the
RECIPIENT shall provide a description (photographs, drawings, printouts, etc.) that best represents the item.
Any communications intended for public distribution that uses ECOLOGY’s logo shall comply with ECOLOGY’s graphic
requirements and any additional requirements specified in this Agreement . Before the use of ECOLOGY’s logo contact
ECOLOGY for guidelines.
RECIPIENT shall acknowledge in the communications that funding was provided by ECOLOGY .
20.PROGRESS REPORTING
a)RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress reports to
ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does not document
timely use of funds.
b)RECIPIENT must submit a progress report with each payment request . Payment requests will not be processed without a
progress report. ECOLOGY will define the elements and frequency of progress reports .
c)RECIPIENT shall use ECOLOGY’s provided progress report format .
d)Quarterly progress reports will cover the periods from January 1 through March 31, April 1 through June 30, July 1 through
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 41 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
September 30, and October 1 through December 31. Reports shall be submitted within thirty (30) days after the end of the
quarter being reported.
e)RECIPIENT must submit within thirty (30) days of the expiration date of the project, unless an extension has been
approved by ECOLOGY, all financial, performance, and other reports required by the agreement and funding program
guidelines. RECIPIENT shall use the ECOLOGY provided closeout report format.
21.PROPERTY RIGHTS
a)Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable property
under this Agreement, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free , nonexclusive,
and irrevocable license to reproduce, publish, recover, or otherwise use the material(s) or property, and to authorize others to
use the same for federal, state, or local government purposes.
b)Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY information ;
present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports, maps, or other data
in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to ECOLOGY.
c)Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or graphic
materials produced in fulfillment of this Agreement , in any manner ECOLOGY deems appropriate. ECOLOGY shall
acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the materials .
d)Tangible Property Rights. ECOLOGY's current edition of "Administrative Requirements for Recipients of Ecology Grants
and Loans," shall control the use and disposition of all real and personal property purchased wholly or in part with funds
furnished by ECOLOGY in the absence of state and federal statutes , regulations, or policies to the contrary, or upon specific
instructions with respect thereto in this Agreement .
e)Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the RECIPIENT
for use in performance of the project, it shall be returned to ECOLOGY prior to final payment by ECOLOGY . If said property
is lost, stolen, or damaged while in the RECIPIENT's possession, then ECOLOGY shall be reimbursed in cash or by setoff by
the RECIPIENT for the fair market value of such property .
f)Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes funds for the
acquisition of land or facilities:
1.RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for in this
Agreement.
2.RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to disbursement of
funds provided by this Agreement. Such evidence may include title insurance policies, Torrens certificates, or abstracts, and
attorney's opinions establishing that the land is free from any impediment, lien, or claim which would impair the uses intended by
this Agreement.
g)Conversions. Regardless of the Agreement expiration date , the RECIPIENT shall not at any time convert any equipment ,
property, or facility acquired or developed under this Agreement to uses other than those for which assistance was originally
approved without prior written approval of ECOLOGY. Such approval may be conditioned upon payment to ECOLOGY of
that portion of the proceeds of the sale, lease, or other conversion or encumbrance which monies granted pursuant to this
Agreement bear to the total acquisition, purchase, or construction costs of such property.
22.RECORDS, AUDITS, AND INSPECTIONS
RECIPIENT shall maintain complete program and financial records relating to this Agreement , including any engineering
documentation and field inspection reports of all construction work accomplished.
All records shall:
a)Be kept in a manner which provides an audit trail for all expenditures.
b)Be kept in a common file to facilitate audits and inspections.
c)Clearly indicate total receipts and expenditures related to this Agreement .
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 42 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
d)Be open for audit or inspection by ECOLOGY, or by any duly authorized audit representative of the State of Washington ,
for a period of at least three (3) years after the final grant payment or loan repayment, or any dispute resolution hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify discrepancies in the
records.
ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the state has
been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be enforced.
Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination.
All work performed under this Agreement and any property and equipment purchased shall be made available to ECOLOGY
and to any authorized state, federal or local representative for inspection at any time during the course of this Agreement and for
at least three (3) years following grant or loan termination or dispute resolution hereunder.
RECIPIENT shall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times, in
order to monitor and evaluate performance, compliance, and any other conditions under this Agreement .
23.RECOVERY OF FUNDS
The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory performance
of this Agreement and completion of the work described in the Scope of Work .
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY , and any unauthorized expenditure(s) or
unallowable cost charged to this Agreement shall be refunded to ECOLOGY by the RECIPIENT .
RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this Agreement .
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or repayments within
thirty (30) days of a written notice. Interest will accrue at the rate of twelve percent (12%) per year from the time ECOLOGY
demands repayment of funds.
Any property acquired under this Agreement , at the option of ECOLOGY, may become ECOLOGY's property and the
RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property.
24.SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid , such
invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid provision , and to
this end the provisions of this Agreement are declared to be severable .
25.STATE ENVIRONMENTAL POLICY ACT (SEPA)
RECIPIENT must demonstrate to ECOLOGY’s satisfaction that compliance with the requirements of the State Environmental
Policy Act (Chapter 43.21C RCW and Chapter 197-11 WAC) have been or will be met. Any reimbursements are subject to
this provision.
26.SUSPENSION
When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or any
portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT . RECIPIENT shall resume
performance on the next business day following the suspension period unless another day is specified by ECOLOGY.
27.SUSTAINABLE PRACTICES
In order to sustain Washington’s natural resources and ecosystems , the RECIPIENT is fully encouraged to implement
sustainable practices and to purchase environmentally preferable products under this Agreement .
a)Sustainable practices may include such activities as: use of clean energy, use of double-sided printing, hosting low impact
meetings, and setting up recycling and composting programs.
b)Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers and
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 43 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
imaging equipment, independently certified green cleaning products, remanufactured toner cartridges, products with reduced
packaging, office products that are refillable , rechargeable, and recyclable, 100% post-consumer recycled paper, and toxic free
products.
For more suggestions visit ECOLOGY’s web page, Green Purchasing,
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Sustainable-purchasing.
28.TERMINATION
a)For Cause
ECOLOGY may terminate for cause this Agreement with a seven (7) calendar days prior written notification to the
RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or for a material breach of
any term or condition. If this Agreement is so terminated, the parties shall be liable only for performance rendered or costs
incurred in accordance with the terms of this Agreement prior to the effective date of termination .
Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to commence work
on the project funded within four (4) months after the effective date of this Agreement, or by any date mutually agreed upon in
writing for commencement of work, or the time period defined within the Scope of Work .
Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the
RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails, in the opinion of
ECOLOGY, to perform any obligation required of it by this Agreement , ECOLOGY may refuse to pay any further funds,
terminate in whole or in part this Agreement, and exercise any other rights under this Agreement .
Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by ECOLOGY
and the State of Washington because of any breach of this Agreement by the RECIPIENT . ECOLOGY may withhold
payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY from the RECIPIENT is
determined.
b)For Convenience
ECOLOGY may terminate for convenience this Agreement , in whole or in part, for any reason when it is the best interest of
ECOLOGY, with a thirty (30) calendar days prior written notification to the RECIPIENT, except as noted below. If this
Agreement is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the
terms of this Agreement prior to the effective date of termination .
Non-Allocation of Funds. ECOLOGY’s ability to make payments is contingent on availability of funding . In the event funding
from state, federal or other sources is withdrawn, reduced, or limited in any way after the effective date and prior to the
completion or expiration date of this Agreement, ECOLOGY, at its sole discretion, may elect to terminate the Agreement, in
whole or part, or renegotiate the Agreement, subject to new funding limitations or conditions. ECOLOGY may also elect to
suspend performance of the Agreement until ECOLOGY determines the funding insufficiency is resolved . ECOLOGY may
exercise any of these options with no notification or restrictions, although ECOLOGY will make a reasonable attempt to provide
notice.
In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the RECIPIENT through the
effective date of termination or suspension. Reimbursed costs must be agreed to by ECOLOGY and the RECIPIENT . In no
event shall ECOLOGY’s reimbursement exceed ECOLOGY’s total responsibility under the agreement and any amendments .
If payments have been discontinued by ECOLOGY due to unavailable funds , the RECIPIENT shall not be obligated to repay
monies which had been paid to the RECIPIENT prior to such termination .
RECIPIENT’s obligation to continue or complete the work described in this Agreement shall be contingent upon availability of
funds by the RECIPIENT's governing body.
c)By Mutual Agreement
Template Version 12/10/2020
AGENDA ITEM #5. b)
Page 44 of 44State of Washington Department of Ecology
Agreement No:
Project Title:
Recipient Name:
WQC-2021-Renton-00187
Heather Downs Detention Pond Water Quality Retrofit Project
City of Renton
ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, at any time, by mutual written agreement.
d)In Event of Termination
All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other materials
prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY, will become property of ECOLOGY and the
RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work completed on such
documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the RECIPIENT in
accordance with Recovery of Funds, identified herein.
29.THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement , the state of
Washington is named as an express third party beneficiary of such subcontracts with full rights as such .
30.WAIVER
Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or breach , and will
not be construed as a modification of the terms of this Agreement unless stated as such in writing by the authorized
representative of ECOLOGY.
Template Version 12/10/2020
AGENDA ITEM #5. b)
AGENDA ITEM #5. b)
AB - 2803
City Council Regular Meeting - 01 Mar 2021
SUBJECT/TITLE: Project Acceptance: CAG-19-029 with McClure and Sons, Inc. for the
Kennydale Reservoir Project
RECOMMENDED ACTION: Council Concur
DEPARTMENT: Public Works Utility Systems Division
STAFF CONTACT: Abdoul Gafour, Water Utility Engineering Manager
EXT.: 7210
FISCAL IMPACT SUMMARY:
The original contract amount was $5,188,392 and the final contract amount is $5,244,940.75. The increase of
$56,548.75 (1.1% of the original contract amount) is for authorized change orders for additional work and for
design changes to resolve field conflicts. There is sufficient funding in the 2020 -2021 Water Utility Capital
Improvement Program budget (425.455606) to cover the increase in the contract cost.
SUMMARY OF ACTION:
The construction contract for the Kennydale Reservoir Project (CAG -19-029) was awarded to McClure and
Sons, Inc. on April 1, 2019. The contractor started construction on May 22, 2019, and substantially completed
the contract work on September 2, 2020. Th e contractor completed all punch list items and provided the city
with all project close-out documentation, operation and maintenance manual, and record drawings on
January 21, 2021.
The contractor completed all of the improvements to the satisfaction of the city. The contractor will not
receive clearance from the state Department of Revenue, Labor and Industries and the Employment Security
Department until after the city submits the project acceptance. The retainage bond will not be released until
clearance from the aforementioned state agencies is received.
The project consisted of the construction of a 1.3 million gallon steel reservoir over a concrete auger -cast pile
foundation, mechanical and electrical work, site utilities, parking lot, paving, landscaping, and lighting. The
new reservoir will provide reliable water storage capacity for domestic use and for fire protection to the
Kennydale area and improve the operation of the city water system.
EXHIBITS:
A. Notice of Completion of Public Works Contract
STAFF RECOMMENDATION:
Accept the Kennydale Reservoir Project with McClure and Sons, Inc. and authorize release of the retainage
bond after 60 days once all the releases from the state have been obtained.
AGENDA ITEM #5. c)
Revised #
Assigned to:
UBI Number:
Yes No
Yes
Telephone #
Bond Number:
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
Date Work Commenced Date Work Completed
Contractor Address
Date Contract Awarded
Retainage Bond Contract/Payment bond (valid for federally funded transportation projects)
Name:
Department Use Only
Original
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Project Name
Date Assigned:
Job Order Contracting
Federally funded transportation project?
Contractor's Name
Description of Work Done/Include Jobsite Address(es)
Affidavit ID*
No (if yes, provide Contract Bond Statement below)
Name & Mailing Address of Public Agency
E-mail Address
Contract Number
Notice is hereby given relative to the completion of contract or project described below
Date:Contractor's UBI Number:
Date Work Accepted
Were Subcontracters used on this project? If so, please complete Addendum A. Yes No
$
$$
$$
$$
%
$
$$
Contact Name:Title:
Affidavit ID* - No L&I release will be granted until all affidavits are listed.
Amount Disbursed
p
Sales Tax Rate
Contract Amount
NOTE: These two totals must be equal
TOTAL
Comments:
Sales Tax Amount
Reductions ( - )
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
TOTAL
Liquidated Damages
Email Address: Phone Number:
p
Sub-Total
Additions ( + )
Amount Retained
(If various rates apply, please send a breakdown)
Contract Release
(855) 545-8163, option # 4
ContractRelease@LNI.WA.GOV
Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360) 902-9450
publicworks@esd.wa.gov
Department of Revenue
Public Works Section
(360) 704-5650
PWC@dor.wa.gov
F215-038-000 10-2014REV 31 0020e (10/26/15)
p@g
AGENDA ITEM #5. c)
Subcontractor's Name:UBI Number: (Required)Affidavit ID*
Addendum A: Please List all Subcontractors and Sub-tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15)F215-038-000 10-2014
AGENDA ITEM #5. c)
AB - 2804
City Council Regular Meeting - 01 Mar 2021
SUBJECT/TITLE: Agreement with RH2 Engineering, Inc. for Services During
Construction of the Highlands Reservoir Phase 1 - Offsite
Improvements CAG-20-133
RECOMMENDED ACTION: Refer to Utilities Committee
DEPARTMENT: Public Works Utility Systems Division
STAFF CONTACT: Eric Ott, Water Utility Engineer
EXT.: 7313
FISCAL IMPACT SUMMARY:
Funding for this agreement in the amount of $350,827 is available through the approved 2020 Water Utility
Capital Improvement Program budget for the Highlands 435 Reservoir Project (425.455597). There is sufficient
funding in the budget to cover the cost of the agreement. The 2020 approved budget is $23,100,000, which
includes funding for the construction of the reservoir anticipated in 2022 to 2024.
SUMMARY OF ACTION:
The Water Utility has planned and budgeted funding for the design and construction of a new 6.3 -million
gallon (MG) reservoir on city-owned property in the Highlands neighborhood to replace the existing 50 -year
old and leaky 2 MG reservoir. Construction of the project will be done in 2 phases: Phase 1 Offsite
Improvements in 2021-2022 and Phase 2 Reservoir Construction in 2022-2024.
Phase 1 of the project includes the installation of approximately 6,250 feet of 24-inch and 16-inch
transmission water mains and 3,240 feet of city communication conduit in NE 12th Street from Edmonds
Avenue NE to Queen Avenue NE ,and in Monroe Avenue NE from NE 12th Street to NE Sunset Blvd. The new
transmission mains are needed to operate the new reservoir and to provide necessary fire flow capacity for
development and redevelopment projects in the Highlands area.
The city selected RH2 Engineering, Inc. through a formal request for proposals on February 26, 2013 to
perform the initial master site plan study (CAG-13-174) and to perform subsequent design services and
services during construction for various phases of this multi-year project under separate contracts (CAG-14-
137, CAG-16-103, CAG-16-138).
Under this agreement, RH2 Engineering, Inc. will provide construction management services to supplement
city staff for administration and observation of the project, conduct weekly construction meetings, respond to
contractors requests for information, review submittals of materials, pay requests, change orders, prepare
records drawings and provide supplemental services as requested.
EXHIBITS:
A. Agreement
B. Vicinity Map
STAFF RECOMMENDATION:
AGENDA ITEM #5. d)
Authorize the Mayor and City Clerk to execute the agreement with RH2 Engineering, Inc., in the amount of
$350,827 for professional services during construction of the Highlands Reservoir Phase 1 – Offsite
Improvements project.
AGENDA ITEM #5. d)
AGREEMENT FOR SERVICES DURING CONSTRUCTION OF
HIGHLANDS RESERVOIR PHASE 1 - OFFSITE IMPROVEMENTS
CAG-20-133
THIS AGREEMENT, January 25, 2021, is by and between the City of Renton (the “City”), a
Washington municipal corporation, and RH2 Engineering, Inc. (“Consultant”), a Washington
corporation. The City and the Consultant are referred to collectively in this Agreement as the
“Parties.” Once fully executed by the Parties, this Agreement is effective as of the last date signed
by both parties.
1. Scope of Work: Consultant agrees to provide professional services as specified in Exhibit
A, which is attached and incorporated herein and may hereinafter be referred to as the
“Work.”
2. Changes in Scope of Work: The City, without invalidating this Agreement, may order
changes to the Work consisting of additions, deletions or modifications. Any such changes
to the Work shall be ordered by the City in writing and the Compensation shall be
equitably adjusted consistent with the rates set forth in Exhibit C or as otherwise mutually
agreed by the Parties.
3. Time of Performance: Consultant shall commence performance of the Agreement
pursuant to the schedule(s) set forth in Exhibit B. All Work shall be performed by no later
than December 31, 2022.
4. Compensation:
A. Amount. Total compensation to Consultant for Work provided pursuant to this
Agreement shall not exceed $350,827.00, plus any applicable state and local sales
taxes. Compensation shall be paid based upon Work actually performed according to
the rate(s) or amounts specified in Exhibit D. The Consultant agrees that any hourly or
flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless
otherwise agreed to in writing or provided in Exhibit C. Except as specifically provided
herein, the Consultant shall be solely responsible for payment of any taxes imposed
as a result of the performance and payment of this Agreement.
B. Method of Payment. On a monthly or no less than quarterly basis during any quarter
in which Work is performed, the Consultant shall submit a voucher or invoice in a form
AGENDA ITEM #5. d)
PAGE 2 OF 10
specified by the City, including a description of what Work has been performed, the
name of the personnel performing such Work, and any hourly labor charge rate for
such personnel. The Consultant shall also submit a final bill upon completion of all
Work. Payment shall be made by the City for Work performed within thirty (30)
calendar days after receipt and approval by the appropriate City representative of the
voucher or invoice. If the Consultant’s performance does not meet the requirements
of this Agreement, the Consultant will correct or modify its performance to comply
with the Agreement. The City may withhold payment for work that does not meet the
requirements of this Agreement.
C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by
the City of any remedies it may have against the Consultant for failure of the
Consultant to perform the Work or for any breach of this Agreement by the
Consultant.
D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for
payment under this Agreement for any future fiscal period, the City shall not be
obligated to make payments for Work or amounts incurred after the end of the
current fiscal period, and this Agreement will terminate upon the completion of all
remaining Work for which funds are allocated. No penalty or expense shall accrue to
the City in the event this provision applies.
5. Termination:
A. The City reserves the right to terminate this Agreement at any time, with or without
cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event
of such termination or suspension, all finished or unfinished documents, data, studies,
worksheets, models and reports, or other material prepared by the Consultant
pursuant to this Agreement shall be submitted to the City, if any are required as part
of the Work.
B. In the event this Agreement is terminated by the City, the Consultant shall be entitled
to payment for all hours worked to the effective date of termination, less all payments
previously made. If the Agreement is terminated by the City after partial performance
of Work for which the agreed compensation is a fixed fee, the City shall pay the
Consultant an equitable share of the fixed fee. This provision shall not prevent the
City from seeking any legal remedies it may have for the violation or nonperformance
of any of the provisions of this Agreement and such charges due to the City shall be
deducted from the final payment due the Consultant. No payment shall be made by
the City for any expenses incurred or work done following the effective date of
termination unless authorized in advance in writing by the City.
AGENDA ITEM #5. d)
PAGE 3 OF 10
6. Warranties And Right To Use Work Product: Consultant represents and warrants that
Consultant will perform all Work identified in this Agreement in a professional and
workmanlike manner and in accordance with all reasonable and professional standards
and laws. Compliance with professional standards includes, as applicable, performing the
Work in compliance with applicable City standards or guidelines (e.g. design criteria and
Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall
certify engineering plans, specifications, plats, and reports, as applicable, pursuant to
RCW 18.43.070. Consultant further represents and warrants that all final work product
created for and delivered to the City pursuant to this Agreement shall be the original work
of the Consultant and free from any intellectual property encumbrance which would
restrict the City from using the work product. Consultant grants to the City a non-
exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and
display all final work product produced pursuant to this Agreement. The City’s or other’s
adaptation, modification or use of the final work products other than for the purposes of
this Agreement shall be without liability to the Consultant. The provisions of this section
shall survive the expiration or termination of this Agreement.
7. Record Maintenance: The Consultant shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Work provided in the
performance of this Agreement and retain such records for as long as may be required by
applicable Washington State records retention laws, but in any event no less than six
years after the termination of this Agreement. The Consultant agrees to provide access
to and copies of any records related to this Agreement as required by the City to audit
expenditures and charges and/or to comply with the Washington State Public Records Act
(Chapter 42.56 RCW). The provisions of this section shall survive the expiration or
termination of this Agreement.
8. Public Records Compliance: To the full extent the City determines necessary to comply
with the Washington State Public Records Act, Consultant shall make a due diligent search
of all records in its possession or control relating to this Agreement and the Work,
including, but not limited to, e-mail, correspondence, notes, saved telephone messages,
recordings, photos, or drawings and provide them to the City for production. In the event
Consultant believes said records need to be protected from disclosure, it may, at
Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend,
and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim
or litigation related to a Public Records Act request for which Consultant has responsive
records and for which Consultant has withheld records or information contained therein,
or not provided them to the City in a timely manner. Consultant shall produce for
distribution any and all records responsive to the Public Records Act request in a timely
manner, unless those records are protected by court order. The provisions of this section
shall survive the expiration or termination of this Agreement.
AGENDA ITEM #5. d)
PAGE 4 OF 10
9. Independent Contractor Relationship:
A. The Consultant is retained by the City only for the purposes and to the extent set forth
in this Agreement. The nature of the relationship between the Consultant and the City
during the period of the Work shall be that of an independent contractor, not
employee. The Consultant, not the City, shall have the power to control and direct the
details, manner or means of Work. Specifically, but not by means of limitation, the
Consultant shall have no obligation to work any particular hours or particular
schedule, unless otherwise indicated in the Scope of Work or where scheduling of
attendance or performance is mutually arranged due to the nature of the Work.
Consultant shall retain the right to designate the means of performing the Work
covered by this agreement, and the Consultant shall be entitled to employ other
workers at such compensation and such other conditions as it may deem proper,
provided, however, that any contract so made by the Consultant is to be paid by it
alone, and that employing such workers, it is acting individually and not as an agent
for the City.
B. The City shall not be responsible for withholding or otherwise deducting federal
income tax or Social Security or contributing to the State Industrial Insurance
Program, or otherwise assuming the duties of an employer with respect to Consultant
or any employee of the Consultant.
C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the
Consultant agrees to notify the City and complete any required form if the Consultant
retired under a State of Washington retirement system and agrees to indemnify any
losses the City may sustain through the Consultant’s failure to do so.
10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless
the City, elected officials, employees, officers, representatives, and volunteers from any
and all claims, demands, actions, suits, causes of action, arbitrations, mediations,
proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees,
penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or
by any and all persons or entities, arising from, resulting from, or related to the negligent
acts, errors or omissions of the Consultant in its performance of this Agreement or a
breach of this Agreement by Consultant, except for that portion of the claims caused by
the City’s sole negligence.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
AGENDA ITEM #5. d)
PAGE 5 OF 10
Consultant and the City, its officers, officials, employees and volunteers, Consultant’s
liability shall be only to the extent of Consultant’s negligence.
It is further specifically and expressly understood that the indemnification provided in
this Agreement constitute Consultant’s waiver of immunity under the Industrial
Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties
have mutually negotiated and agreed to this waiver. The provisions of this section shall
survive the expiration or termination of this Agreement.
11. Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City
employees from soliciting, accepting, or receiving any gift, gratuity or favor from any
person, firm or corporation involved in a contract or transaction. To ensure compliance
with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind
to City employees or officials. Consultant also confirms that Consultant does not have a
business interest or a close family relationship with any City officer or employee who was,
is, or will be involved in selecting the Consultant, negotiating or administering this
Agreement, or evaluating the Consultant’s performance of the Work.
12. City of Renton Business License: The Consultant shall obtain a City of Renton Business
License prior to performing any Work and maintain the business license in good standing
throughout the term of this agreement with the City.
Information regarding acquiring a city business license can be found at:
http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882
Information regarding State business licensing requirements can be found at:
http://dor.wa.gov/doing-business/register-my-business
13. Insurance: Consultant shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B. In the event that Work delivered pursuant to this Agreement either directly or
indirectly involve or require Professional Services, Professional Liability, Errors and
Omissions coverage shall be provided with minimum limits of $1,000,000 per
occurrence. "Professional Services", for the purpose of this section, shall mean any
Work provided by a licensed professional or Work that requires a professional
standard of care.
C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the
State of Washington, shall also be secured.
AGENDA ITEM #5. d)
PAGE 6 OF 10
D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired
or non-owned, with minimum limits of $1,000,000 per occurrence combined single
limit, if there will be any use of Consultant’s vehicles on the City’s Premises by or on
behalf of the City, beyond normal commutes.
E. Consultant shall name the City as an Additional Insured on its commercial general
liability policy on a non-contributory primary basis. The City’s insurance policies shall
not be a source for payment of any Consultant liability, nor shall the maintenance of
any insurance required by this Agreement be construed to limit the liability of
Consultant to the coverage provided by such insurance or otherwise limit the City’s
recourse to any remedy available at law or in equity.
F. Subject to the City’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to the City before performing the Work.
G. Consultant shall provide the City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
14. Delays: Consultant is not responsible for delays caused by factors beyond the
Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable
control occur, the City agrees the Consultant is not responsible for damages, nor shall the
Consultant be deemed to be in default of the Agreement.
15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or
encumber any rights, duties or interests accruing from this Agreement without the
written consent of the other.
16. Notices: Any notice required under this Agreement will be in writing, addressed to the
appropriate party at the address which appears below (as modified in writing from time
to time by such party), and given personally, by registered or certified mail, return receipt
requested, by facsimile or by nationally recognized overnight courier service. Time period
for notices shall be deemed to have commenced upon the date of receipt, EXCEPT
facsimile delivery will be deemed to have commenced on the first business day following
transmission. Email and telephone may be used for purposes of administering the
Agreement, but should not be used to give any formal notice required by the Agreement.
CITY OF RENTON
Eric F. Ott
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-7313
EOtt@RentonWA.gov
Fax: (425) 430-7241
CONSULTANT
Ryan Feskens
22722 29th Drive SE
Bothell, WA 98021
Phone: (425) 951-5396
RFeskens@RH2.com
Fax: (425) 951-5401
AGENDA ITEM #5. d)
PAGE 7 OF 10
17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Consultant agrees as follows:
A. Consultant, and Consultant’s agents, employees, representatives, and volunteers
with regard to the Work performed or to be performed under this Agreement, shall
not discriminate on the basis of race, color, sex, religion, nationality, creed, marital
status, sexual orientation or preference, age (except minimum age and retirement
provisions), honorably discharged veteran or military status, or the presence of any
sensory, mental or physical handicap, unless based upon a bona fide occupational
qualification in relationship to hiring and employment, in employment or application
for employment, the administration of the delivery of Work or any other benefits
under this Agreement, or procurement of materials or supplies.
B. The Consultant will take affirmative action to insure that applicants are employed and
that employees are treated during employment without regard to their race, creed,
color, national origin, sex, age, sexual orientation, physical, sensory or mental
handicaps, or marital status. Such action shall include, but not be limited to the
following employment, upgrading, demotion or transfer, recruitment or recruitment
advertising, layoff or termination, rates of pay or other forms of compensation and
selection for training.
C. If the Consultant fails to comply with any of this Agreement’s non-discrimination
provisions, the City shall have the right, at its option, to cancel the Agreement in
whole or in part.
D. The Consultant is responsible to be aware of and in compliance with all federal, state
and local laws and regulations that may affect the satisfactory completion of the
project, which includes but is not limited to fair labor laws, worker's compensation,
and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton
Council Resolution Number 4085.
18. Miscellaneous: The parties hereby acknowledge:
A. The City is not responsible to train or provide training for Consultant.
B. Consultant will not be reimbursed for job related expenses except to the extent
specifically agreed within the attached exhibits.
C. Consultant shall furnish all tools and/or materials necessary to perform the Work
except to the extent specifically agreed within the attached exhibits.
D. In the event special training, licensing, or certification is required for Consultant to
provide Work he/she will acquire or maintain such at his/her own expense and, if
AGENDA ITEM #5. d)
PAGE 8 OF 10
Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform
the Work, said employee/sub-contractor/assignee will acquire and or maintain such
training, licensing, or certification.
E. This is a non -exclusive agreement and Consultant is free to provide his/her Work to
other entities, so long as there is no interruption or interference with the provision of
Work called for in this Agreement.
F. Consultant is responsible for his/her own insurance, including, but not limited to
health insurance.
G. Consultant is responsible for his/her own Worker’s Compensation coverage as well as
that for any persons employed by the Consultant.
19. Other Provisions:
A. Approval Authority. Each individual executing this Agreement on behalf of the City
and Consultant represents and warrants that such individuals are duly authorized to
execute and deliver this Agreement on behalf of the City or Consultant.
B. General Administration and Management. The City’s project manager is Michael
Mitchell. In providing Work, Consultant shall coordinate with the City’s contract
manager or his/her designee.
C. Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
D. Conflicts. In the event of any inconsistencies between Consultant proposals and this
Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to
this Agreement are incorporated by reference only to the extent of the purpose for
which they are referenced within this Agreement. To the extent a Consultant
prepared exhibit conflicts with the terms in the body of this Agreement or contains
terms that are extraneous to the purpose for which it is referenced, the terms in the
body of this Agreement shall prevail and the extraneous terms shall not be
incorporated herein.
E. Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington and the City of
Renton. Consultant and all of the Consultant’s employees shall perform the Work in
accordance with all applicable federal, state, county and city laws, codes and
ordinances.
F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared
by the joint efforts of the Parties and shall not be construed against one party or the
AGENDA ITEM #5. d)
PAGE 9 OF 10
other as a result of the preparation, substitution, submission or other event of
negotiation, drafting or execution.
G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or
interpret this Agreement or any of its terms or covenants shall be brought in the King
County Superior Court for the State of Washington at the Maleng Regional Justice
Center in Kent, King County, Washington, or its replacement or successor. Consultant
hereby expressly consents to the personal and exclusive jurisdiction and venue of
such court even if Consultant is a foreign corporation not registered with the State of
Washington.
H. Severability. A court of competent jurisdiction’s determination that any provision or
part of this Agreement is illegal or unenforceable shall not cancel or invalidate the
remainder of this Agreement, which shall remain in full force and effect.
I. Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
J. Time is of the Essence. Time is of the essence of this Agreement and each and all of
its provisions in which performance is a factor. Adherence to completion dates set
forth in the description of the Work is essential to the Consultant’s performance of
this Agreement.
K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement will
be for the sole and exclusive benefit of the Parties and no one else.
L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns,
and legal representatives to the other party to this Agreement, and to the partners,
successors, assigns, and legal representatives of such other party with respect to all
covenants of the Agreement.
M. Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s
failure to enforce any provision of this Agreement shall not be a waiver and shall not
prevent either the City or Consultant from enforcing that provision or any other
provision of this Agreement in the future. Waiver of breach of any provision of this
Agreement shall not be deemed to be a waiver of any prior or subsequent breach
unless it is expressly waived in writing.
AGENDA ITEM #5. d)
PAGE 10 OF 10
N. Counterparts. The Parties may execute this Agreement in any number of
counterparts, each of which shall constitute an original, and all of which will together
constitute this one Agreement.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Armondo Pavone
Mayor
Tony V. Pardi
President
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Shane Moloney
Renton City Attorney
Contract Template Updated 03/12/2019 clb (92) 7/13/20
AGENDA ITEM #5. d)
1
6/26/2020 12:43:09 PM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit A_SOW_Services During Construction.docx
EXHIBIT A
Scope of Work
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1 – Off-Site Utilities
Services During Construction
Professional Engineering Services
January 2021
Background
The City of Renton (City) is planning to construct off-site utility improvements as Phase 1 of the
Highlands Reservoir project. The project extents span along NE 12th Street from Edmonds Avenue NE
to Queen Avenue NE, with the existing reservoir site located at 3410 NE 12th Street. Project design
was completed under a separate contract by RH2 Engineering, Inc. (RH2). The City has requested RH2
prepare this Scope of Work to provide engineering services to support the City during project
construction.
The proposed off-site utility improvements include installation of approximately 6,250 linear feet (lf)
of ductile iron water main, one (1) pressure reducing valve (PRV) station, 635 lf of storm and sanitary
sewer pipe, and 3,240 feet of polyvinyl chloride (PVC) communication conduit.
CONSTRUCTION PHASE SERVICES
Scope of Work
The proposed Scope of Work is divided into the following Tasks:
• Task 1 – Project Management Services
• Task 2 – Construction Phase Services
• Task 3 – Supplemental Services
Task 1 – Project Management Services
Objective: Provide project administration and coordination among RH2 staff, the City Project
Manager, and other City staff.
Approach:
1.1 Provide Project Status Reporting: Provide regular status updates of work activities,
information needs, staffing requirements, project outlook, and project issues requiring City
input. Status reporting to be conducted via email, phone calls, meetings, teleconferences, or
virtual meetings.
1.2 Prepare Monthly Invoices and Budget Summaries: Prepare monthly project invoices,
including description of work performed and budget status summaries.
AGENDA ITEM #5. d)
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements Exhibit A
Phase 1 – Off-Site Utilities Services During Construction Scope of Work
2
6/26/2020 12:43:09 PM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit A_SOW_Services During Construction.docx
1.3 Provide Quality Assurance/Quality Control (QA/QC): Manage and coordinate the in-house
quality assurance reviews of deliverables.
RH2 Deliverables:
• Regular correspondence, emails, and documentation.
• Initial project schedule and regular updates in electronic PDF.
• Monthly project invoices and budget summaries.
Task 2 – Construction Phase Services
Objective: Provide construction observation and contract administration services during project
construction of the off-site utilities improvements to support the City. As the Engineer of Record,
RH2 will provide periodic observation of the construction to review whether those elements of
construction that are observed by RH2 conform to the project plans and specifications. While not on
site, RH2 will work with the City and its designated inspector to help determine that elements of
construction not observed by RH2 are also in conformance with the project plans and specifications.
It is anticipated that the City will take the lead role in inspection and construction administration and
will handle day-to-day construction observation and administration responsibilities.
Approach:
2.1 Attend Pre-Construction Conference: Prepare for and attend a pre-construction conference
with the contractor, City, impacted or adjacent utilities, and other stakeholders. Discuss
important sections of the construction contract and contract requirements to bring them to
the contractor’s attention. Prepare an agenda and invitation list in coordination with City
Project Manager. Record meeting minutes for distribution to the meeting attendees. The City
will extend invitations for the pre-construction conference to all required parties.
2.2 Conform and Provide Construction Documents: Conform plans and specifications for
construction by incorporating addenda items into the documents. Produce and distribute
construction contract plans and specifications to the contractor and the City at the
pre-construction conference, including: four (4) full-size sets of plans (two (2) for contractor
and two (2) for the City), and eight (8) sets of half-size plans and specifications for the
contractor, City, and RH2 use during construction (four (4) for contractor, and two (2) each
for the City and RH2). Production of hard copies will be provided by outside printing service
and invoiced at cost. The Fee Estimate assumes a budget of $1,000 for these outside services.
Actual costs may vary.
2.3 Review Submittals and Shop Drawings: Review contractor submittals, shop drawings, and
field testing procedures, per the project documents, as requested by the City. Coordinate
with the City regarding substitute and “or-equal” items proposed for use by the contractor.
Provide a written response to the contractor and City for each shop drawing , submittal, and
procedure reviewed. Maintain a submittals tracking sheet and provide to the City upon
request. Provide a file-sharing platform for submittal items accessible to the City, contractor,
RH2, and any other required parties.
AGENDA ITEM #5. d)
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements Exhibit A
Phase 1 – Off-Site Utilities Services During Construction Scope of Work
3
6/26/2020 12:43:09 PM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit A_SOW_Services During Construction.docx
2.4 Review Construction Schedule and Pay Requests: Support the City in tracking and projecting
project progress/schedule and costs, validating contractor pay requests, and resolving
discrepancies. Confirm schedule of values quantities in support of the City Project Manager
based on work complete as defined in the contract documents and as supported by City
Inspector daily records.
2.5 Provide On-Call Construction Technical Support Services: Conduct periodic conference calls
with City staff to review contractor’s progress and coordinate oversight of construction
activities for conformance with project plans and specifications . Provide on-call technical
support services, as requested by the City, including but not limited to, attending weekly
construction meetings; performing periodic on-site construction observation, including
construction observation reports for each visit; responding to contractor’s technical
questions and requests for information (RFIs); and reviewing change orders. The City will be
responsible for day-to-day construction administration and inspection services with RH2
supporting the City as requested. RH2 will coordinate with the contractor and City inspectors
to provide supplementary construction observation at critical stages of construction and when
directed by the City. The City will retain and coordinate with testing firm(s) for all special
inspections.
2.6 Attend Final On-Site Observation and Assist with Project Closeout: Conduct a final
walkthrough of the project with City staff and the contractor. Prepare a punch list of
outstanding work items to be completed to achieve Final Completion , perform a follow-up
walkthrough to confirm all punch list items have been addressed, and prepare for the City’s
acceptance of the project. Recommend procedures for timing for accep tance of the project.
Advise the City and contractor of the dates for the warranty periods in accordance with the
construction contract documents.
2.7 Prepare Record Drawings: Provide record drawings representative of the as-constructed
project. Record drawings will be completed based upon contractor, RH2, and City inspector
red-lined markups to conformed drawings. Record drawings will be completed per City
Standards. Provide electronic copies of record drawings in AutoCAD DWG and PDF formats
to the City.
Assumptions:
• The construction duration will be approximately 240 working days.
• RH2 will provide on-call construction technical support services identified in Subtask 2.5 as
requested by the City. An average of twenty-five (25) hours per week for forty-eight (48) weeks
has been assumed for budgetary purposes.
• The City will assume the lead role for construction administration, management, on-site
inspection services, construction observation, and communication with the contractor as the
primary contact.
• At the direction/request of the City, RH2 will attend project meetings, perform reviews, issue
directions and clarifications, and all other Consultant tasks identified herein.
AGENDA ITEM #5. d)
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements Exhibit A
Phase 1 – Off-Site Utilities Services During Construction Scope of Work
4
6/26/2020 12:43:09 PM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit A_SOW_Services During Construction.docx
• The City will coordinate water distribution system operation as required for construction
activities.
• The City will prepare, provide, and distribute all public notifications.
• The City will be responsible for all activities related to the supervisory control and data
acquisition (SCADA) system.
• Permitting assistance during construction is outside of this Scope of Work.
• The contractor will be responsible for providing construction survey and staking for field
control and as-built surveying for use in preparing as-constructed drawings.
• RH2 is not responsible for site safety or for directing any contractor in their work.
• The City will coordinate directly with the contractor for testing, system shut downs, and
connections.
• Construction phase services defined in this Task are variable in nature and depend in part on
the contractor awarded the project. RH2’s estimate is based upon an experienced and
reasonable contractor being awarded the construction contract. RH2 recommends the City
budget the amount shown in the estimate plus a contingency amount. The contingency would
cover additional services if a more intensive level of observation and construction support is
necessary.
Provided by the City:
• Project lead for construction inspection and administration. Retention of and coordination
with testing firm(s) for special inspections.
• Preparation and submittal of the Construction Completion Report to the Washington State
Department of Health.
RH2 Deliverables: Deliverables will be provided in electronic format (PDF) unless otherwise noted.
• Pre-construction conference administration and documentation, including pre-construction
conference meeting agenda and minutes.
• Paper sets of full- and half-size plans and specifications as identified in Subtask 2.2.
• Clarifications and written responses to RFIs.
• Change orders and pay requests review and documentation.
• Submittal and shop drawings review and documentation.
• Weekly construction meeting agenda and minutes.
• Construction observation and correspondence with the City and contractor. Construction
observation reports and photos from site visits to be provided to the City ahead of weekly
progress meetings.
• Punch list following final walkthrough.
• Record drawings in AutoCAD DWG format, including all external references.
AGENDA ITEM #5. d)
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements Exhibit A
Phase 1 – Off-Site Utilities Services During Construction Scope of Work
5
6/26/2020 12:43:09 PM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit A_SOW_Services During Construction.docx
Task 3 – Supplemental Services
Objective: Provide additional service not anticipated at the time of development of this Scope of
Work. Such services will be undertaken only upon written request and authorization from the City.
An estimated reserve budget is included in the Fee Estimate for unanticipated services for this Task.
AGENDA ITEM #5. d)
1/13/2021 11:48:00 AM Z:\Projects\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit B_Schedule_Services During Construction.docx
Exhibit B: Time Schedule of Completion
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1 – Off-Site Utilities
Services During Construction
ANTICIPATED NOTICE TO PROCEED DATE: March 1, 2021
Task
Anticipated
Completion
Task 1 – Project Management Services December 31, 2022
Task 2 – Construction Phase Services December 31, 2022
Task 3 – Supplemental Services December 31, 2022
ANTICIPATED CONTRACT COMPLETION DATE: December 31, 2022
AGENDA ITEM #5. d)
Overhead
Multiplier
Fee
Multiplier
Negotiated Rate
Per Hour
RATE LIST 188.54%0.12 RATE
Professional I 46.73 88.10 16.18 $151
Professional II 51.37 96.85 17.79 $166
Professional III 56.32 106.18 19.50 $182
Professional IV 60.65 114.35 21.00 $196
Professional V 65.29 123.10 22.61 $211
Professional VI 69.31 130.69 24.00 $224
Professional VII 74.27 140.02 25.71 $240
Professional VIII 77.36 145.85 26.79 $250
Professional IX 77.36 145.85 26.79 $250
Control Specialist I 42.39 79.93 14.68 $137
Control Specialist II 46.11 86.93 15.96 $149
Control Specialist III 50.75 95.68 17.57 $164
Control Specialist IV 55.08 103.85 19.07 $178
Control Specialist V 58.48 110.27 20.25 $189
Control Specialist VI 62.82 118.43 21.75 $203
Control Specialist VII 67.46 127.19 23.36 $218
Control Specialist VIII 70.24 132.44 24.32 $227
Technician I 35.59 67.09 12.32 $115
Technician II 38.68 72.93 13.39 $125
Technician III 43.94 82.85 15.21 $142
Technician IV 47.34 89.26 16.39 $153
Technician V 51.68 97.43 17.89 $167
Technician VI 56.63 106.77 19.61 $183
Technician VII 61.27 115.52 21.21 $198
Technician VIII 64.67 121.93 22.39 $209
Administrative I 23.21 43.76 8.04 $75
Administrative II 27.23 51.34 9.43 $88
Administrative III 32.80 61.84 11.36 $106
Administrative IV 38.68 72.93 13.39 $125
Administrative V 44.25 83.43 15.32 $143
CAD/GIS System $27.50
CAD Plots - Half Size $2.50
CAD Plots - Full Size $10.00
CAD Plots - Large $25.00
Copies (bw) 8.5" X 11"$0.09
Copies (bw) 8.5" X 14"$0.14
Copies (bw) 11" X 17"$0.20
Copies (color) 8.5" X 11"$0.90
Copies (color) 8.5" X 14"$1.20
Copies (color) 11" X 17"$2.00
Mileage $0.560
Subconsultants 15%
Outside Services At Cost
EXHIBIT C-1
Consultant Fee Determination- Summary Sheet
(Negotiated Hourly Rates of Pay)
2021 Fee Schedule
SubConsultant:
RH2 Engineering, Inc
Negotiated
Hourly Rate
Rates listed are adjusted annually.
AGENDA ITEM #5. d)
AGENDA ITEM #5. d)
EXHIBIT C-2
Fee Estimate
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1 - Off-Site Utilities
Services During Construction
Jan-21
Description Total
Hours Total Labor Total Expense Total Cost
Classification
Task 1 Project Management Services 118 26,198$ -$ 26,198$
1.1 Provide Project Status Reporting 58 12,976$ -$ 12,976$
1.2 Prepare Monthly Invoices and Budget Summaries 30 6,310$ -$ 6,310$
1.3 Provide QA/QC 30 6,912$ -$ 6,912$
Task 2 Construction Phase Services 1522 281,420$ 12,086$ 293,506$
2.1 Attend Pre-Construction Conference 22 4,448$ 27$ 4,475$
2.2 Conform and Provide Construction Documents 40 7,452$ 4,778$ 12,230$
2.3 Review Submittals and Shop Drawings 80 15,330$ 246$ 15,576$
2.4 Review Construction Schedule and Invoices 60 11,268$ -$ 11,268$
2.5 Provide On-Call Construction Technical Support Services 1212 222,436$ 4,768$ 227,204$
2.6 Attend Final On-Site Observation and Assist with Project Closeout 28 5,288$ 37$ 5,325$
2.7 Prepare Record Drawings 80 15,198$ 2,230$ 17,428$
Task 3 Supplemental Services 160 30,512$ 611$ 31,123$
3.1 Provide Supplemental Services as Requested 160 30,512$ 611$ 31,123$
PROJECT TOTAL 1800 338,130$ 12,697$ 350,827$
Z:\Projects\Data\REN\113-104\00 Contracts and PM\Project Scoping\Services During Construction\PSA_Exhibit C2_FEE_Services During Construction SFC.xlsm 1/13/2021 11:46 AM
AGENDA ITEM #5. d)
4,514
376
WGS_1984_Web_Mercator_Auxiliary_Sphere
Highlands Reservoir Offsite Improvements - Vicinity Map
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
Legend
256 0 128 256 Feet
Michael Mitchell, P.E. - Water
MMitchell@Rentonwa.gov
07/16/2020
City and County Labels
City and County Boundary
Addresses
Parcels
Streets
Points of Interest
Parks
Waterbodies
2019.sid
Red: Band_1
Green: Band_2
Blue: Band_3
Map
Extent2010
Highlands Reservoir Offsite Improvements - Vicinity Map
Michael Mitchell, P.E.
Water Utility