Loading...
HomeMy WebLinkAbout0895.06 DFR 281-283.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 281 Time On Site Time Off Site Date Day of Week 8:35 10:00 2/26/21 Friday Travel Time Weather 1 hr. 43°F, Overcast Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the sewer. Erosion Control – Temporary Upon arrival, ESNW rep. tested the pH of the stormwater and conducted an Imhoff Cone test to measure settleable solids of the stormwater vault found onsite. ESNW rep. measured a pH of 10 and 0.0 mL of settleable solids were observed, which is suitable for discharge into the sewer system. Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report. ESNW rep. will return as requested. Alexandra Shaner Senior Field Technician (206) 355-877 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 282 Time On Site Time Off Site Date Day of Week 1:30 2:30 3/1/21 Monday Travel Time Weather 1 hr. 48°F, Partly Cloudy Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the sewer. Erosion Control – Temporary Upon arrival, ESNW rep. tested the pH of the stormwater and conducted an Imhoff Cone test to measure settleable solids of the stormwater vault found onsite. ESNW rep. measured a pH of 10 and 0.0 mL of settleable solids were observed, which is suitable for discharge into the sewer system. Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report. ESNW rep. will return as requested. Alexandra Shaner Senior Field Technician (206) 355-877 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 283 Time On Site Time Off Site Date Day of Week 7:00 8:00 3/3/21 Wednesday Travel Time Weather 1 hr. 35°F, Partly Cloudy Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the sewer. Erosion Control – Temporary Upon arrival, ESNW rep. tested the pH of the stormwater and conducted an Imhoff Cone test to measure settleable solids of the stormwater vault found onsite. ESNW rep. measured a pH of 11 and 0.0 mL of settleable solids were observed, which is suitable for discharge into the sewer system. Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report. ESNW rep. will return as requested. Alexandra Shaner Senior Field Technician (206) 355-877