HomeMy WebLinkAboutAdden 4   AMENDMENTNO._4_TOAGREEMENTFORDESIGNAND CONSTRUCTIONADMINISTRATIONSERVICESFORSUNSET NEIGHBORHOODPARK,PHASE2.   THISAMENDMENT,dated_______________,2021,isbyandbetweentheCityofRenton(the “City”),aWashingtonmunicipalcorporation,andHBBLandscapeArchitecture,Inc. (“Consultant”),aWashingtoncorporation.TheCityandtheConsultantarereferredtocollectively inthisAmendmentasthe“Parties.”OncefullyexecutedbytheParties,thisAmendmentis effectiveasofthelastdatesignedbybothparties.  Whereas,theCityengagedtheservicesoftheConsultantunderAgreementCAGͲ18Ͳ063,dated April10,2018,toprovidenecessaryservicesfortheSunsetNeighborhoodPark,Phase2(referred tohereinasthe“Agreement”);  Whereas,thePartieswishtoamendtheAgreementtochangethescopeofworkandchangethe compensationinordertoprovideadditionalconstructionadministrationservices.  NOWTHEREFORE,ItismutuallyagreeduponthatCAGͲ18Ͳ063isamendedasfollows:  1. ScopeofWork:Section1,ScopeofWork,isamendedtoaddworkasspecifiedinExhibit A,whichisattachedandincorporatedherein.  2. TimeofPerformance:Section3,TimeofPerformance,isamendedpursuanttothe schedule(s)setforthinExhibitA.AllWorkshallbeperformedbynolaterthanMay31, 2021.  3. Compensation:Section4,Compensation,isamendedsothatthemaximumamountof compensationpayabletoConsultantisincreasedby$_14,326.82__from$_495,731.28__ to$_510,058.10_,plusanyapplicablestateandlocalsalestaxes.Theadditional compensationshallbepaidbaseduponWorkactuallyperformedaccordingtotherate(s) oramountsspecifiedinExhibitA,whichisattachedandincorporatedherein.  4. AlltermsoftheAgreementnotexplicitlymodifiedhereinshallremaininfullforceand effectandsuchtermsshallapplytoWorkperformedaccordingtothisAmendmentasif fullysetforthherein.  CAG-18-063, Adden #4-21 March 8th (approved via email from Cheryl Beyer) Hough Beck & Baird Inc. 206.682.3051 Phone 2101 4th Avenue, Suite 1800 206.682.3245 Fax Seattle, WA 98121 www.hbbseattle.com Page 1 of 3 Contract Amendment Date 22 February 2021 HBB Project No. 2018-12 Project Name Sunset Neighborhood Park, Phase 2 Addendum No. FOUR Description of Amendment This amendment request is for the additional CA scope of services required for the design team to review contractor site progress and additional contractor coordination meetings beyond those that were scoped in the original contract in order to maintain project schedule and momentum. Much of the additional scope and fee was due to the prolonged and extended schedule, and the slow progress of construction throughout 2020. The original construction schedule had substantial completion occurring in May 2020. This was then pushed to July 2020, and then again to September 2020, and finally to March 2021 which is 10 months of additional time and effort. The team’s scope of work anticipated site visits and meetings would address multiple items at once. The prolonged schedule and construction progress, stretched out the effort and necessitated several additional visits and meetings then originally scoped for. In addition, multiple nonconforming items on the project necessitated additional follow-up, meeting coordination, field observations, and research to provide design team support and professional assistance to the City of Renton. Field and Site Visits: HBB was scoped to provide 20 field visits. At this point in time, HBB has provided 27 field visits and 1 site visit. These were due to the prolonged and extended pace of the construction schedule which was not originally anticipated. Several of the field visits were also due to several construction items that weren’t in conformance with contract documents. See as follows for a general summary of these visits: 1. Field Review #21 08-31-2020 Activity: sandblast walls, irrigation PSI, & plant materials. 2. Field Review #22 09-08-2020 Activity: weed growth, plant materials, walls, irrigation mainline incorrect size, & boulders. 3. Field Review #23 09-11-2020 Activity: sod placement, tree planting, soil compaction, & pergola correction progress. 4. Field Review #24 09-29-2020 Activity: contractor progress meeting, plant materials, rootballs, step lights, & ramp landings. 5. Field Review #25 10-02-2020 Activity: mushrooms in sod, cobble rock, plant materials, splash bollards, & trench drains. 6. Field Review #26 11-10-2020 Activity: gazebo picnic tables, inter. sign pad, slot drains, & handrail slip joint. 7. Site Visit 11-24-2020 Purpose: for observation of interpretive sign concrete pad redo #2. Photos shared with city via email. 8. Field Review #27 12-09-2020 Activity: irrigation coverage test, mist feature concrete, play surfacing, scratches, & yellow sod. Substantial & Final Completion walk-throughs and lists: To date the team has provided direct edits and formatting for 3 Substantial Completion Lists for progress of items, and several of the nonconforming items were continuously not addressed by the contractor. The design team conducted the site walk-throughs and the lists as additional ‘Field Reviews and Reports.’ The 3 occurred as follows: 1. 10-15-2020 First Substantial Completion List. 2. 11-20-2020 Second revised Substantial Completion List. 3. 12-11-2020 Third reformatted Substantial Completion List. EXHIBIT A Hough Beck & Baird Inc. 206.682.3051 Phone 2101 4th Avenue, Suite 1800 206.682.3245 Fax Seattle, WA 98121 www.hbbseattle.com P:\2018 Projects\2018-12 Sunset Ngh Park Ph 2\Admin\01-Contracts\Amendments to Agreement\Proposed Amendment\2021 February\2021_02-22 SNP2 HBB Contract Amend 4 Proposal.docx Page 2 of 3 Contract Amendment Meetings & Teleconferences Regarding Nonconforming Items: Several meetings and teleconferences were requested by the contractor to further discuss nonconforming items and contractor’s proposals. In many instances these were to address items that should have been addressed directly by the contractor and did not need design team coordination. 1. Teleconference to discuss contractor’s pay application progress with city and contractor (Note: pay application reviews in general are not in HBB’s contracted scope of work). 2. Step Lights: Harbor Power research time, follow-up, and meeting to review nonfunctional step lights that resulted in contractor exercising product warranty. 3. Handrail Slip Joints: Meetings to review the nonconforming slip joints in handrail that necessitated PND Structural review of proposed solutions, with additional research time and follow-up. 4. Color Concrete Finish: Nonconforming color concrete finish reviewed by HBB and PND several times in the field, contractor meetings to discuss options, with additional research time and follow-up. 5. Gazebo Trench Drains: Nonconforming gazebo trench drains with additional PND time to document and exhibit in-field conversation with and direction to contractor (that was not followed). 6. Rust from Pergola Gap: Follow-up and additional research by PND Structural review of pergola areas where rust has been observed. 7. CCTV & Contractor Wiring: Additional Harbor Power time, research, meetings, and site visits to resolve nonconforming power wiring and circuits for CCTV. This is per Contractor’s electrical subcontractor’s statements that they are unable to identify the wiring and circuits that they installed to verify that 2 switched circuits for lighting and 1 unswitched circuit for CCTV had been installed per contract documents and per the original installation. There was also an apparent lack of coordination between contractor and city of Renton CCTV vendor for camera power installation (which is contractor’s responsibility per contract documents) which necessitated Harbor Power time and follow-up. 8. Electrical Splices: Additional Harbor Power time, research, and teleconference to resolve splicing that does not conform to contract documents that reference City of Renton standards. Schedule: There is no impact to the schedule. Addendum Fee The fee breakdown is attached to this Contract Amendment as follows: HBB $14,775.28 PND & Harbor Power $8,360.00 Rolluda $1,350.00 SUBTOTAL $24,485.28 Structural & Architectural Pergola Modification Credit [-$10,158.46] TDI CO-06 Dec 28, 2020 (attached) TOTAL $14,326.82 Hough Beck & Baird Inc. 206.682.3051 Phone 2101 4th Avenue, Suite 1800 206.682.3245 Fax Seattle, WA 98121 www.hbbseattle.com P:\2018 Projects\2018-12 Sunset Ngh Park Ph 2\Admin\01-Contracts\Amendments to Agreement\Proposed Amendment\2021 February\2021_02-22 SNP2 HBB Contract Amend 4 Proposal.docx Page 3 of 3 Contract Amendment The above contract addendum request is beyond the existing scope of work tasks as described in our agreement dated April 10, 2018 and are at the rates established in the contract. If you have any questions or need clarification regarding the addendum, please call. Best Regards Dean W. Koonts, ASLA, CPD Principal HBB Landscape Architecture Original Total Contract Amount $ 493,354.50 Contract Amendment ONE dated Dec. 17, 2019 $ 0.00 (Contract Date Extension Only) Contract Amendment TWO dated Mar. 16, 2020 $ 2,376.78 (Structural Pedestrian Pole Footing Design) Contract Amendment THREE dated Jan. 4, 2021 $ 0.00 (Contract Date Extension Only) Contract Amendment FOUR dated Feb. 15, 2021 $ 14,326.82 (Additional CA Scope Performed) New Total Contract Amount $ 510,058.10 FEE EXHIBIT Project: Owner: Firm: Date: Principal PM / LA Design Comp./ Tech Business Dev. Admin. $ 191.78 $ 139.47 $ 83.15 $ 71.08 $ 107.29 $ 65.71 TASK 6.7600000$14,575.28 6.1 Meetings & Teleconferences 21 6.2 55 6.3 Submittals & Requests for Information 6.4 Change Orders 6.5 Record Drawings 7600000 $14,575.28 $0.00 $0.00 $0.00 $0.00 $0.00 $14,575.28 Reimbursable Expenses Mileage, zip car, reproduction, printing, and other project related costs.200.00$ 14,775.28$ Sunset Park Phase 2, Exhibit A City of Renton Hough Beck & Baird Inc. (HBB) 02/22/21 TOTAL COST OF SERVICES Reimbursable Expenses TASK SUBTOTAL Total Cost Scope of Work Total Hours Construction Adminstration Assistance Field Visits & Field Reports (follow-up) (+ Completion walk-throughs/lists) 1 of 3 P:\2018 Projects\2018-12 Sunset Ngh Park Ph 2\Admin\01-Contracts\Amendments to Agreement\Proposed Amendment\2021 February\2021_02-22 SNP2 HBB Contract Amend 4 Fee.xlsx FEE EXHIBIT Project: Owner: Firm: Date: Senior Engineer VII PIC Senior Engineer IV PM/CIVIL Senior Engineer VI Structural Electrical Harbor Power Admin Technician IV $ 190.00 $ 150.00 $ 175.00 $ 105.00 $ 95.00 TASK 6.0 32 6 22 0 8,160.00$ 6.1 Meetings & Teleconferences 6610 6.2 Field Visits & Reports (Follow-up) (+ Completion walk-throughs/lists) 26 12 6.3 Submittals & Requests for Information 6.4 Change Orders 6.5 Record Drawings 0326220 60 $0.00 $4,800.00 $1,050.00 $2,310.00 $0.00 8,160.00$ Reimbursable Expenses Mileage, parking, reproduction, printing, and other project related costs.200.00$ 8,360.00$ Total Cost TASK SUBTOTAL CONSTRUCTION ADMINISTRATION ASSISTANCE Sunset Park Phase 1 City of Renton PND & Harbor Power 02/22/21 Scope of Work Total Hours 2 of 3 P:\2018 Projects\2018-12 Sunset Ngh Park Ph 2\Admin\01-Contracts\Amendments to Agreement\Proposed Amendment\2021 February\2021_02-22 SNP2 HBB Contract Amend 4 Fee.xlsx FEE EXHIBIT Project: Owner: Firm: Date: Principal PM Proj Arch Admin. $ 150.00 $ 140.00 $ 110.00 $ 75.00 TASK 6.0 9 0 0 $1,260.00 6.1 Meetings & Teleconferences 6.2 Field Reviews & Reports (+ Completion walk-throughs/lists) 9 6.3 Submittals & Requests for Information 6.4 Change Orders 6.5 Record Drawings 09 0 0 $0.00 $1,260.00 $0.00 $0.00 $1,260.00 Reimbursable Expenses Mileage, parking, reproduction, printing, and other project related costs.90.00$ $1,350.00 Sunset Park Phase 2 City of Renton Rolluda Architects 02/22/21 Scope of Work TOTAL COST OF SERVICES Reimbursable Expenses Total Hours Total Cost TASK SUBTOTAL CONSTRUCTION ADMINISTRATION ASSISTANCE 3 of 3P:\2018 Projects\2018-12 Sunset Ngh Park Ph 2\Admin\01-Contracts\Amendments to Agreement\Proposed Amendment\2021 February\2021_02-22 SNP2 HBB Contract Amend 4 Fee.xlsx CITYOFRENTON CommunityServicesDepartment CONTRACTCHANGEORDERAGREEMENT 12.28.2020 CONTRACT:SunsetNeighborhoodPark,Phase2 CAGͲ19Ͳ243 CONTRACTOR:TerraDynamics,Inc. CHANGEORDER:Six(6) SUMMARYOFPROPOSEDCHANGE: Reason/Justification: Modificationstositeconstructionduetositeconditions,plantingareas,andtimeextensionofwork duetodeliveryschedules. DESCRIPTION: Item Qty.Description UnitPrice Amount No.w/WSST COP5 Modificationtopergolasstructures 9,234.96$10,158.46$ COP6SSSteelfinishmodificationͲcredit ($3,000.00)(3,300.00)$ COP7Plantmaterialadditionforartsculpturearea 5,660.27$6,226.30$ COP8PlantmaterialsubsitutionsͲcreditforreplace ($3,264.19)(3,590.61)$ COP9CatchBasinandGradeConflictModifications $2,224.43 2,446.87$ COP10 Extensionoftemporaryfencerental$1,209.44 1,330.38$ TotalthisChangeOrder: 13,271.40$ ORIGINALCONTRACT CURRENTCONTRACT NETCHANGE REVISEDCONTRACT AMOUNT(W/WSST) AMOUNT THISORDER(W/WSST) TOTALAFTERCHANGE AdditionalCalendarDays: 0calendardays(zero)calendardays.CompletionDateisJanuary31,2021. SIGNATURES: Contractor:Date: ProjectManager:Date ApprovedBy:Date: Thepaymentspecifiedandagreedtointhischangeorderincludeseveryclaimbythecontractorforany extrapaymentwithrespecttotheworkdescribedinthischangeorder.Theworkcoveredbythischange ordermustbeperformedunderthesametermsandconditionsasthatincludedintheoriginal agreement.Alloftheothertermsoftheoriginalagreementremainineffect. 4,059,000.00$4,081,335.16$13,271.40$4,094,606.56$