Loading...
HomeMy WebLinkAboutCO 4Community Services Facilities Division CONTRACT NO: CAG-18-216 CO NO. 4 CONTRACT CHANGE ORDER (CO) PROJECT TITLE: Renton City Hall Elevator Mod. - Phase 2 TO: RC Zeigler Company, Inc. (CONTRACTOR) the contract. Description Amount COP 4 Change in Sales Tax 01/01/21 add .001 $ 36.25 Revise Completion Date - Add 163 Days $ - No Cost TOTAL $ 36.25 CONTRACT UM: O NO CHANGE O INCREASE OF: Thirty Six and 25/100 $ 36.25 U DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: ❑ NO CHANGE O INCREASE OF: one hundred sixty three 163 O DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM $ 115,207.40 PREVIOUS ADDITIONS/DELETIONS $ (9,S95.30) PREVIOUS TOTAL $ 105,612.10 CHANGE AMOUNT THIS CHANGE ORDER $ 36.25 REVISED CONTRACT TOTAL $ 10S,648.35 PERCENT TOTAL CHANGE FROM ORIGINAL -8.30% NOTICE TO PROCEED DATE February 21, 2019 PREVIOUS CONTRACT CALENDAR DAYS 543 PREVIOUS SUBSTANTIAL COMPLETION DATE August 17, 2020 REVISED CONTRA CALENDAR DAYS THIS CHANGE ORDER 706 CURRENT SUBSTANTIAL COMPLETION nuary 27, 2021 2/18/21 __ Architect AckrLowledgement Date ont cknowle ent Date The City of Renton hereby accepts the foregoing Change Order Proposal(s). This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Ord 322_ A THOR ING A RE DATE Community Services Facilities Division Project No: CAG-18-216 COP If CHANGE ORDER PROPOSAL Project Name: RCH Elevator Modernization - Phase 2 (COP) TO: R.C. Zeigler Company, Inc_ (CONTRACTOR) Proposal Request oats: 02/09/21 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Changes to contract due to extended close-out of project. Inclusion of extended time to allow project to meet substantial completion date: Previous Sub Comp date: 8/17/20 Revised Sub Comp date:1/27/21 Add for 1/1/21 change in WSST on dollar amount remaining to be invoiced: $36,245' 0.001= $36.25 REASON FOR CHANGE: Design Errors ❑ Design Omissions ❑ Owner Unknown Conditions ❑ Code/AHJ 0 Other EXPLANATION: Extended ciase-out requires additional time and additional WSST. DATE PROPOSAL REQUIRED: 2/23/21 CHANGE ORIGINATED BY: Russ Woodruff (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Thomas Horton TO: Thomas Horton (A/E) TO: _ Russ Woodruff CDR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE Q INCREASE OF thirty six and 25 cents $ 36.25 DECREASE (WASHINGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: L] NO CHANGE Q INCREASE OF 163 CALENDAR DAYS DECREASE J The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until Incorporation of this COP Into a Change Order by the City of Renton. RC Zeigler Co CONTRACTOR SIGN DATE We have cari ft, Mined this proposal and find the cost to be reasonable. ' 2/18/21 A/E DATE City of R n to ' d Signatu 3 CITY F RENTO DATE Therefore, we recommend acceptance.