Loading...
HomeMy WebLinkAboutMFP21000813.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21000813 IVR Number: 21000813 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/24/2021Application Date:1823059074Parcel Number: 205 RAINIER AVE S Permit Type:03/12/2021Issue Date:Franchise Permit Work Class:03/14/2022Expiration Date:Minor Utility Job Number: 101120729Franchise Type:Electric Description: Puget Sound Energy Electric Crew to replace B.O. pole at P01. Will require Northbound closure of Hardie Ave SW at P01 w/ flaggers to allow for through traffic. No disturbance of hard surfaces are required. RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact SLE ENTERPRISES LLC 4708 NE 1ST PLACE RENTON , WA 98059 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP21000813 Scott Warlick CED 3/12/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date P01 BUSSTOPBUSSTOPHARDIE AVE SWHARDIE AVE SWHARDIE AVE SWSW 2N D S T 991315 1313 1513 1913 PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K STOP FLAGGER STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100' 100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROADAHEAD100'100'100'CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 PSE PUGETSOUNDENERGY -OB101120729 HARDIE AVE SW & SW 2ND ST, RENTON 02/03/2021 FLAVIANA.NUNES@PSE.COM 425-424-7809 SHEET 1 of 1 Notes: 1. All signs and spacing to conform to the MUTCD and Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP21000813 NVicinity MapN.T.S.Owner / Developer Contact InfoofficeATTN:PSE--JOSH GRENNER425-748-6307THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.PHONECABLE TV11460228 101120729N/A 593227657N/A 594139307N/A 583065672N/A N/AN/A 108125066PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPJ. GRENNER 425-457-4542 11/12/20D. FIELDS 425-240-0400 11/12/20...S. MORALES 425-518-1589 11/12/20N/A RENTONEAR-17 REPL 1 POLEDISTRIBUTION POLE REPLACEMENT205 HARDIE AVE SW RENTON, WA 98057ASPLUNDH CONSTRUCTIONN/A N/AN/A 101120729AS NOTED 1 OF 1KING N/A N/A QCSOKENW18-T23N-R05E N/A N/A2305E070 2305E076 2305E070 EAR-17COMCAST..SEATTLE CITY LIGHT........E-Mail:Cell Phone:Project Manager Contact Information:Manager:JOSH GRENNER425-457-4542JOSHUA.GRENNER@PSE.COM......101120729 EAR-17 REPL 1 POLEDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILERemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP01317880-16578375kVAInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P01317880-16578375kVA6211400SITE PLAN1" = 50' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 317880-165783 45 3 1957POLE TABLE (NEW)Site#Pole DataGrid #HeightClass Year Remarks / Location Ref.P01 317880-165783 50 2OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurementsare from the roadside face of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers.UNDERGROUND CONSTRUCTIONExcavation-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover forprimary conductors and 24” of cover for secondary conductors.-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimumof 36” of cover for all conductors or as required by the permitting Agency.-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.-No rocks larger than 6” shall be included in backfill.-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as requiredby the permitting Agency.-Restore all excavated areas to original condition.LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONCLCONDUIT RISER PLACEMENT DETAILTOP VIEWNOT TO SCALEP01: 317880-165783 (Avg. Span = 172', Angle = 0°)JOINT POLE W/ SEATTLE CITY LIGHT 12.5KV UNDERBUILDBRUSH REMOVAL REQ'DGRID # INCORRECT IN FIELD-EX 45' CL 3, 1957 POLE TO BE REPLACED-INST 50' CL 2 (PD502) 6010.1000-INST 1Ø DBL DE #2ACSR (DDE2115) 6031.1043-SUB DE #4CU (NE) (9240000)-TRANSFER 1Ø #2ACSR PRI & NEUT (SW)-TRANSFER 1Ø #4CU PRI & NEUT (NE)-RM EX RUSTY 75kVA XFMR & L/B C/O-INST 75kVA120/240v XFMR & L/B C/O (TRFSXF) 6025.1000-INST (2) RIGID CLEVISES (INDNRC) 6015.1000-TRANSFER (3) OH TPX SEC'S-TRANSFER OH TPX SVC-RM EX RISER-INST 3" RISER (RIS3CSS) 6042.1000-TRANSFER 350 UG TPX SEC (SE); EXTEND AS REQ'D-ACTUAL 350 UG TPX SEC ADDED L=_________ BATCH YEAR_________-ACTIAL TRENCH L=________-TRANSFER STREET LIGHT (SLAS7607)-TOP POLE ABOVE SEATTLE CITY LIGHT-REMOVE POLE STUB AFTER COMM & SEATTLE CITY LIGHT HAS TRANSFERREDMAPS AND RECORDS NOTE (P01):350 UG TPX SVC APPEARS TO ONLY FEED HHAT 205 HARDIE AVE SW IN THE FIELD.COMMERCIAL CUSTOMERS AT 205 & 235RAINIER AVE S APPEAR TO BE FED FROM TUT'S(317880-165808) & (317879-165808)1-20-21120211-1a1-31-8a2-3022-129MFP21000813RESTORATION PER CITY OF RENTON STANDARDS