HomeMy WebLinkAbout0895.06 DFR 285.pdf
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
AES 0895.06 1 of 1 285
Time On Site Time Off Site Date Day of Week
9:40 10:40 3/8/21 Monday
Travel Time Weather
1 hr. RT 47°F, Partly Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC
General Contractor Contact Field Supervisor Reviewed
Accrete Construction, LLC Joe LAC/MTK
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the
sewer.
Erosion Control – Temporary
Upon arrival, ESNW rep. tested the pH and conducted an Imhoff Cone test to measure settleable solids of the
stormwater in the onsite vault. ESNW rep. measured a pH of 11 and 0.0 mL/L of settleable solids were observed,
which is suitable for discharge into the sewer system.
Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report.
ESNW rep. will return as requested.
Alexandra Shaner
Senior Field Technician
(206) 355-877