HomeMy WebLinkAboutMFP21000699.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21000699 IVR Number: 21000699 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:02/17/2021Application Date:1432701130Parcel Number: 12721 SE 172ND ST Permit Type:03/17/2021Issue Date:Franchise Permit Work Class:03/17/2022Expiration Date:Minor Utility Job Number: 101137029Franchise Type:Electric Description: Puget Sound Energy Electric Pole work at P01 (316649 166908), Installing 1 run of 350 UG TPX. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact KARMARA ALIMAMY D 12721 SE 172ND STREET RENTON , WA 98058 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date P0112721SE 172ND ST151515151010 1010STOPFLAGGER STO P FLAGGER W20-7AROADWORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840L=W S602PSEPUGETSOUNDENERGY-OBFebruary 8, 202110113702912721 Southeast 172nd Street, Renton, WAeduard.volianskyi@pse.comSHEET 1 of 1TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOP WORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m. 12734 127281272412716 17130 12727 12735 17208 12713 12721 SE 172ND ST 127TH AVE SE316649-166908 37.5 kVA 120/240V (B) #2ACSR ROW 60' 316648-166922 SLAG4202 ROL 17 #2ACSR BA316638-166893 25 kVA 120/240V (A) X9791 (ERROR-SET FUSE) 316649-166893 SLAG4196 316662-166893 25 kVA 120/240V (B) 17130 12727 1273512713 12721 ROW 60' 316648-166922 SLAG4202DWY 1'1'17' SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.448,-122.172 Owner / Developer Contact Info officeATTN: ALIMAMY KAMARA 20049 104TH PL SE KENT, WA 98031 ALI 206-898-8635 OVERHEAD CIRCUIT MAP CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-17 06/2020 128 150 176 -1.43 - 128 151.43 176 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 0' 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3000 SQ. FT. 200AMPS GAS 9.8 KW 115A 1.8% 2.5% 8. 9. SCALE: 1" = 50'101137029THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) HP Svc/MSA Distribution SUPERIOR ORDER#NOTIF#PROJECT PHASE CABLE TV PHONE GAS E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM Service Stubs UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 01/08/21 ANN BETTENCOURT 206-584-4182 01/08/21 --- ANN BETTENCOURT 206-584-4182 01/08/21 N/A RENTON AFFABLE 2 NEW UG SERVICE 12721 SE 172ND ST, RENTON, WA 98058 N/A N/A N/A 101137029 AS SHOWN 1/1 KING N/A N/A CSPSKEPM SE 28-A2N-305 N/A N/A 2305E112 2305E136 2305E112 ROL-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 510194085 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X XX UNDERGROUND CIRCUIT MAP SITE SPECIFIC NOTES AT P01: 316649-166908 -EXISTING 45', 1959 CL 4 DISTRIBUTION POLE TO REMAIN -EXISTING 37.5kVA OH 120/240 TRANSFORMER TO REMAIN -INSTALL (1) 3" RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) ± 30' ACTUAL ________' AT M01:NEW METER BASE -CUSTOMER TO INSTALL DUAL PACK -INSTALL (2) 200 A METERS SPAN SPECIFIC NOTES P01 TO M01: -INSTALL 1-RUN 350 UG TPX, ± 90'________' ACTUAL W/10' 4/0 UG TPX TAIL PROJECT SCOPE -INSTALL RISER -INSTALL NEW UG SERVICE -INSTALL (2) 200A METERS JOB SITE JOB SITE 101137029 00 1"2" 00 50'100' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & AT P01 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 TRENCHING & CONDUIT. -INSTALL ± 60' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM P01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . PARTIAL PLAN DETAIL SCALE: 1" = 20' 00 1"2" 00 20'40' 316649-166908 37.5 kVA 120/240V (B) CUSTOMER PROVIDED 4'x4' WORK PIT & 3/4 YD SAND CUSTOMER PROVIDED 4'x4' WORK PIT -CUSTOMER TO INSTALL 1-3" SCHEDULE 40 CONDUIT, +60' -PSE TO INSTALL 1 RUN OF 350 UG TPX W/ 4/0 TAIL, + 100'±40'±20' 90° R=48" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.101137029UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 01/08/21 ANN BETTENCOURT 206-584-4182 01/08/21 --- ANN BETTENCOURT 206-584-4182 01/08/21 N/A RENTON AFFABLE 2 NEW UG SERVICE 12721 SE 172ND ST, RENTON, WA 98058 N/A N/A N/A 101137029 AS SHOWN 1/1 KING N/A N/A CSPSKEPM SE 28-A2N-305 N/A N/A 2305E112 2305E136 2305E112 ROL-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Top View 24" Min PERMANENT METER DETAIL AT M01 NOT TO SCALE 4'3' 4' 24" 32" Typical Min.Gas Meter Relief Vent To Trench Property Line Electric & Joint Utility Work Pit Dimensions BuildingWall Elec. Mtr. Permanent Detail Detail: Not to Scale Elec. Mtr Base Elec. Mtr Utility Provided 2.5" Conduit ServiceRiser Customer Provided Drainage Pipe 12" MinimumClearance from GasService Lines Conduit Stakes Gas ServiceLine Conduit Conduit Depth24" to 36" Max. SealConduitEndsClosed 48" 48" 24" Min.36" Typical 36" Min. Gas Meter AssemblyUtility Provided Regulator Vent 24"-36" 24"-36" TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 SCALE: NONE CABLE & CONDUIT DIAGRAM Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale