To: RJ Development Date: March 17, 2021
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Jeff Bennett
Email: jeffb@accrete.build
No. of
Copies Date Description
1 3/11 – 3/12/21 Daily Field Report(s) # 286 & 287
Comments:
CC:
1: Mark Richardson ATTN: mark@accrete.build
2: Jennifer Vogele ATTN: jennifer@accrete.build
3: Jonathan Chavez ATTN: jchavez@rentonwa.gov
4: Joe W ATTN: joew@accrete.build
5: ATTN:
6: ATTN:
7: ATTN:
8: ATTN:
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 286
Time On Site Time Off Site Date Day of Week
3:00 PM 3:30 PM 3/11/21 Thursday
Travel Time Weather
1.00Hr. RT 50s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test power crossing backfill in Talbot Road South.
Power Crossing Backfill
ESNW arrived onsite and observed that the contractor was compacting 60’ of a 3’ deep trench grading to
approximately 6’ deep (from West to East) for a residential power crossing across Talbot Road South adjacent to
the Weatherly Inn development. Contractor placed 4’’ schedule 80 PVC pipe bedded in approximately 18’’ of
sandy import material and backfilled with 1-1/4’’ minus recycled crushed concrete compacted in 12’’ lifts to grade
with a hoe pack. ESNW rep used a ½’’ steel T-probe and found the subgrade to be suitably dense, firm, and
unyielding. ESNW rep observed that the contractor had achieved minimum compaction standards of 95%
or greater in tested locations. ESNW rep will return as requested to continue observation and testing of further
earthwork activities.
ESNW rep will return to observe earthwork activities when requested by client
Fig. 1: Power crossing trench backfilled with 1 ¼’’ minus recycled concrete
Jackson Lundgren, G.I.T.
Senior Field Technician 206-468-0991
1/2
Type text here
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 286
Time On Site Time Off Site Date Day of Week
3:00 PM 3:30 PM 3/11/21 Thursday
Travel Time Weather
1.00Hr. RT 50s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Test Number Test Location
(Power crossing
backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
266 See map -2’ SG 9 127.7 8.7 123.2 96
267 See map -2’ SG 9 127.7 9.6 124.1 97
268 See map SG 9 127.7 8.5 122.9 96
269 See map SG 9 127.7 8.4 123.5 97
Fig. 2: Approximate location of compaction tests 266-269 on power crossing backfill.
2/2
266-269
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 287
Time On Site Time Off Site Date Day of Week
12:45 PM 2:45 PM 3/12/21 Friday
Travel Time Weather
1.00Hr. RT 50s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test power crossing backfill in Talbot Road South.
Power Crossing Backfill
ESNW arrived onsite and observed that the contractor was compacting 60’ of a 3’ deep trench grading to
approximately 6’ deep (from West to East) for a residential power crossing across Talbot Road South adjacent to
the Weatherly Inn development. Contractor placed 4’’ schedule 80 PVC pipe bedded in approximately 18’’ of
sandy import material and backfilled with 1-1/4’’ minus recycled crushed concrete compacted in 12’’ lifts to grade
with a hoe pack. ESNW rep used a ½’’ steel T-probe and found the subgrade to be suitably dense, firm, and
unyielding. ESNW rep observed that the contractor had achieved minimum compaction standards of 95%
or greater in tested locations. ESNW rep will return as requested to continue observation and testing of further
earthwork activities.
ESNW rep will return to observe earthwork activities when requested by client
Fig. 1: Power crossing trench backfilled with 1 ¼’’ minus recycled concrete
Jackson Lundgren, G.I.T.
Senior Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 287
Time On Site Time Off Site Date Day of Week
12:45 PM 2:45 PM 3/12/21 Friday
Travel Time Weather
1.00Hr. RT 50s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Test Number Test Location
(Power crossing
backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
270 See map -4’ SG 9 127.7 8.2 123.5 97
271 See map -4’ SG 9 127.7 8.6 124.1 97
272 See map -2’ SG 9 127.7 7.8 122.9 96
273 See map SG 9 127.7 7.7 125.2 98
Fig. 2 Approximate location of compaction tests 270-273 on power crossing backfill.
2/2
270-273