HomeMy WebLinkAboutMFP21000941.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21000941
IVR Number: 21000941
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:03/04/2021Application Date:3023059067Parcel Number: 3400 EAST VALLEY RD
Permit Type:03/18/2021Issue Date:Franchise
Permit Work Class:03/18/2022Expiration Date:Minor Utility
Job Number: 105095856Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO INSTALL UG CONDUIT AND SERVICE LINE AT V01 (316667 165787).
POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
D & C INVESTMENTS 555 SW GRADY WY
RENTON , WA 98057
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
V01RR E VALLEY RDE VALLEY RD12 12 12
12 12 12
12 12 121211111111SW 34TH ST
Vault
M01
E VALLEY RD12 12 12 M6-2CONETOPPER
CONETOPPERRIGHTKEEPR4-7BRIGHT
KEEP
R4-7B
BUSINESS(ES) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
RIGHT LANE
CLOSED
AHEAD W20-5RW1-4LROAD
WORK
AHEAD W20-1350'350'350'W1-4RROADWORKAHEADW20-1350'350'ROADWORKAHEADW20-1
100'
PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA1050
X'ROADWORKAHEADW20-1
X'ROADWORKAHEADW20-1THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
JOB105095856
3400 E VALLEY RD, RENTON
02/23/2021
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 1 of 1
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
UG/BOX/VAULTVault
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
TRENCH
Notes:
1. All signs and spacing to conform to the
MUTCD and Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
"3400"
3412
3351
3401 E VALLEY RDE VALLEY RDSW 34TH ST
PVT
℄℄℄℄316667-165777
316693-165776
316712-165792
500 kVA 120/208V (ABC)316705-164756
316711-165777
25 kVA 120/240V (B)
316712-165765
316714-165781
VIC15316667-165787
25 kVA 120/240V (B)
J
J J
JJ
J
ROW 80'
R/W 36'
S/W 7'
N
Vicinity Map
N/A
CUSTOMER-SUPPLIED SERVICE TRENCH
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.105095856 TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in 3" Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
JOB SITE
JOB SITE
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-15
6/2020
120 119 110
-0.15 -
120 119.15 110
SITE SPECIFIC NOTES:
P01 - EXISTING #316667-165787
-EXISTING COMBINATION VAULT AND EQUIPMENT TO REMAIN
M01 - NEW METER CABINET
-POTELCO INSTALL 100A METER SET
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS
-PROVIDE A 4' X 4' WORK PIT @ V01.
TRENCHING & CONDUIT
-FOLLOW TRENCH DIAGRAM
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT
ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
CIRCUIT FEED ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
SQ.
200AMPS
GAS
kW
A
.%
.%
00 1"2"
00 50'100'
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
SITE PLAN
SCALE: 1" = 50'
POWER GENERAL NOTES - COMMERICAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work
sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3)
working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See
sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials
which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them
in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings
from the individual unit's meter base to the designated connection point.
10.Inclement weather conditions may cause delays in construction times and dates.
11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side
slope the trench to 1:1.
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 100'
Owner / Developer Contact Info
officeATTN:
D&C Investments
555 SW Grady Way
Renton, WA 98057
Adam Person 253-924-9073
Job Order
Temporary
Removal
Relocation
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105095856510002523
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
Tin.Nguyen@pse.com
(253) 244-4303
Tin Nguyen
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
T. NGUYEN 253-244-4303 2/16/21
D. BRINKMANN 206-794-8599 2/18/21
D. BRINKMANN -2/21/21
N/A Renton
WALKER'S RENTON MAZDA LIGHTING
NEW UG SERVICE
3400 EAST VALLEY ROAD #LIGHT, RENTON, 98057
N/A N/A
N/A 105095856
AS NOTED 1/1
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.SE 30 N/A N/A
N/A 2305e124 2305e120 VIC-15
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
JOB SITE
Excavation - 11-1/4 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
7'
10'
TOP VIEW
VAULT & EXCAVATION DETAIL
Not to scale 6045.1050
4'-0"6'-0"
6"6'-2"
3'-6"
4'-2"