Loading...
HomeMy WebLinkAboutMFP21001240.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21001240 IVR Number: 21001240 Permit Information Permit Name: Century Link Permits Address/Location:03/23/2021Application Date:0007200119Parcel Number: 200 S 3RD ST Permit Type:03/23/2021Issue Date:Franchise Permit Work Class:03/23/2022Expiration Date:Minor Utility Job Number: N.611303Franchise Type:Telephone Description: Century Link/Lumen to excavate and lower conduit in 4 locations, remove a HH and access 1 MH. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Heather Binkly Dycom Industries dba North Sky 11770 Us Hwy 1, SUITE 101 Palm Beach Gardens, FL 33408 B: (360) 254-6920 O: (360) 450-3287 Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 N.611303 200 S 3rd St, Renton, WA 98057 CenturyLink/Lumen to excavate/lower conduit in 4 locations, remove a HH, and access 1 MH. X X X X X 3/9/2021Austin Sweeney MFP21001240 Scott Warlick 3/23/2021 RESTORATION PER CITY OF RENTON STANDARDS DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Scott Warlick CED 3/23/2021 MFP21001240 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Austin Sweeney TRAFFIC CONTROL PLANJOB # N.611303 C.46PERMIT # S 3RD ST @ SHATTUCK AVE S EXCAVATE / LOWER CONDUIT SHOULDER WORKSPEEDLIMIT 25 N Comments: EXCAVATE NORTH SIDE S 3RDST, WEST OFSHATTUCK AVE S.SHOULDER WORK.PARKING RESTRICTED.SIDEWALK ACCESSIBLE.SPOTTER WILL ASSIST PEDESTRIANS. ONE LANE TWO WAY TAPER 50' MIN/100' MAX Legend Cone S Spotter Work Area Work Truck CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Sharon Martos Project # N.611303 C.46Designed for LUMENSharon MartosApproved 3/1/2021Traffic Control SupervisorTCS # 010745Phone 253-737-5198sharon.martos@gmail.com NOT TO SCALE Date:3/1/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.611303 C.46CERT:TCS # 010745 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER) Comments: General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm. UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com ONEWAY R6-2R NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 R7-T39 EXCAVATE WORK AREA8 X 40 ROADWORKAHEADW20-1SHOULDERWORKW21-5100'DWY DWY S 3RD ST SHATTUCK AVE SS www.invarion.com MFP21001240 TRAFFIC CONTROL PLANJOB # N.611303 C.46PERMIT # SHATTUCK AVE S @ S 4TH ST EXCAVATE / LOWER CONDUIT SHOULDER WORKSPEEDLIMIT 25 Comments: EXCAVATE AND LOWER CONDUIT.NB LANE SHATTUCK AVE S. NORTHOF S 4TH ST.SHOULDER WORK.SIDEWALK & CROSSWALK ACCESSIBLE.SPOTTER WILL ASSIST PEDESTRIANS. SHATTUCK AVE S S 4TH STS ROADWORKAHEAD W20-1SHOULDERWORKW21-5ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1100' ONE LANE TWO WAY TAPER 50' MIN/100' MAX CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 403020 80 60 Sharon Martos Project # N.611303 C.46Designed for LUMENSharon MartosApproved 3/1/2021Traffic Control SupervisorTCS # 010745Phone 253-737-5198sharon.martos@gmail.com NOT TO SCALE Date:3/1/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.611303 C.46CERT:TCS # 010745 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER) Comments: General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm. UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com Legend Cone S Spotter Work Area Work TruckS 3RD PLN EXCAVATE WORK AREA8 X 225 www.invarion.com MFP21001240 TRAFFIC CONTROL PLANJOB # N.611303 C.46PERMIT # S 4TH ST @ SHATTUCK AVE S HH 1730 REMOVALLANE SHIFT SPEEDLIMIT 25 Comments: REMOVE HH 1730.NE CORNER S 4TH ST & SHATTUCK AVE S.LANE SHIFT.SIDEWALK CLOSED.PEDESTRIANS ROUTED AROUND WORK AREA.SPOTTER WILL ASSIST PEDESTRIANS. ONE LANE TWO WAY TAPER 50' MIN/100' MAX Legend Cone S Spotter Work Area Work Truck CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Sharon Martos Project # N.611303 C.46Designed for LUMENSharon MartosApproved 3/1/2021Traffic Control SupervisorTCS # 010745Phone 253-737-5198sharon.martos@gmail.com NOT TO SCALE Date:3/1/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.611303 C.46CERT:TCS # 010745 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER) Comments: General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm. UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com S SIDEWALKCLOSED R9-9 SIDEWALK CLOSEDCROSS HERER9-11a(R)ROADWORKAHEAD W20-1 LANESHIFTAHEAD W5-5 W1-4 100' 100' 100' SIDEWALK CLOSEDAHEAD CROSS HERE 60'ROADWORKAHEADW20-1ROADWORKAHEADW20-1DWYN SHATTUCK AVE S S 4TH STWHITWORTH AVE S ROADWORKAHEADW20-1HH 1730WORK AREA10 X 100 www.invarion.com MFP21001240 TRAFFIC CONTROL PLANJOB # N.611303 C.46PERMIT # S 2ND ST @ MILL AVE SMH 146 SHOULDER WORK SPEEDLIMIT25 N Comments: ACCESS MH 146.SW CORNER S 2ND ST & MILL AVE S.SHOULDER WORK.CROSSWALK CLOSED.PEDESTRIANS ROUTED AROUND WORK AREA.SPOTTER WILL ASSIST PEDESTRIANS. ONE LANE TWO WAY TAPER 50' MIN/100' MAX Legend Cone S Spotter Work Area Work Truck CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Sharon Martos Project # N.611303 C.46Designed for LUMENSharon MartosApproved 3/1/2021Traffic Control SupervisorTCS # 010745Phone 253-737-5198sharon.martos@gmail.com NOT TO SCALE Date:3/1/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.611303 C.46CERT:TCS # 010745 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER) Comments: General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm. UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 010745 sharon.martos@gmail.comROADWORKAHEADW20-1SHOULDERWORKW21-5MILL AVE SS 2ND ST S CROSSWALK CLOSED CROSS HERE CROSSWALK CLOSEDCROSS HEREMH 146 WORK AREA8 X 30 DWY100' www.invarion.com MFP21001240 S 6TH ST PROJECT LOCATION BURNETT AVE SS 2ND ST SHATTUCK AVE SS 134TH S T 405 LAKE WASHINGTON HOUS E R W A Y S S 3RD ST CITY OF RENTON CenturyLink Civil Base Map RENTON DOWNTOWN UTILITY IMPROVEMENTS CITY OF RENTON RENTON, WASHINGTON Cover Sheet 2 Legend 3 Key Map 4-7 Utility Plans Civil Base Map Color Key:Existing FacilitiesConflict Mitigation Action (Proposed Facilities)Additional Information Needed/Notes Estimated % Design Drawings: 100% Jurisdiction File Name: 18-2251-Renton_DUIP_BidSet_Signed_Half Received file from Jurisdiction Date: 11-30-20 FOR REFERENCE ONLY NOTES: ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON INFORMATIONPROVIDED BY OTHERS. CENTURYLINK CANNOT BE RESPONSIBLE FOR THEACCURACY OF INFORMATION AND/OR PLANS PROVIDED BY OUTSIDE PARTIES. FACILITY LOCATIONS, DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIEDPRIOR TO CONSTRUCTION. PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS ONLY ANDSHOULD BE VERIFIED PRIOR TO CONSTRUCTION. INDEX OF SHEETS Plans Prepared For: Plans Prepared By: LOCATION MAPNOT TO SCALE N SHEET 1 of 7DATE: 1-27-2021 REV. DATE DESCRIPTION 0 11-21-19 Initial TT Draft Issued 1 CTL JOB: N.611303.C.06GEO CODE: WC CLLI: Renton (RNTNWA01)ENGINEER: Jesse PatjensPHONE: 206-733-8591EMAIL: jesse.patjens@centurylink.comCPA: Paul ButlerPHONE: 206-652-5690EMAIL: Paul.Butler@centurylink.com TT Eng: Tom BrownPhone: 206-799-2989E-mail: tbrown@terratechllc.net TT #: WACL19.70097http://www.terratechllc.net 1 12-7-20 Updated w/ 100% Plans 2 1-27-21 Revised for Permit Submittal MFP21001240 Legend X X XXX X X X X HH HH HHX X X XX XCP ) X Existing CenturyLink pedestalor or or New CenturyLink pedestal Existing CenturyLink pedestal to be removed Existing CenturyLink SAI (serving area interface) New CenturyLink SAI (serving area interface) Existing CenturyLink SAI to be removed orabandoned Existing CenturyLink cable or conduit to beremoved or abandoned Existing CenturyLink handhole New CenturyLink handhole Existing CenturyLink handhole to be removed Existing CenturyLink manhole (various sizes) New CenturyLink manhole (various sizes) Existing CenturyLink double lidded manhole(various sizes) New CenturyLink double lidded manhole(various sizes) Existing CenturyLink manhole to be removedor abandoned (all sizes and types) Existing CenturyLink repeater New CenturyLink repeater Existing CenturyLink repeater to be removed CP Existing CenturyLink cool ped. - fiber/electronics New CenturyLink cool ped. - fiber/electronics Existing CenturyLink RT (remote terminal) New CenturyLink RT (remote terminal) Existing CenturyLink pole New CenturyLink pole Existing CenturyLink pole Existing CenturyLink down guy and anchor New CenturyLink down guy and anchor New CenturyLink sidewalk down guy and anchor Existing power company down guy and anchor X X CenturyLink Civil Base Map 2 of 7 btel Existing buried telephone line tduc Existing telephone duct run afo-exist Existing aerial fiber optic aer-tel Existing overhead telephone line fo-exist Existing buried fiber optic bsw-ex Existing buried service wire asw-ex Existing aerial service wire New overhead telephone line BTEL New buried telephone line TDUC New telephone duct run BSW-NEW New buried service wire AFO-NEW New aerial fiber optic AER-TEL FO-NEW New buried fiber optic ASW-NEW New aerial service wire Project Details Narrative/Special Remarks:This project proposes to relocate CenturyLink facilities along (insertproject route) between (insert project extents) for the Construction of(insert Jurisdiction's Project Name and Number). The (insert Jurisdiction) will be protecting in place the followingCenturyLink facilities within the project limits:• • • The CenturyLink relocation scope will include:• • • • Construction Sequencing Description Regarding CenturyLink RelocationScope and Jurisdiction Project Construction:CenturyLink's relocation scope is planned to occur prior to Jurisdiction'sConstruction Start Date. Temporary Facilities:There are no planned temporary facilities as part of CenturyLink'srelocation scope. Example Narrative/Special Remarks: This project proposes to relocate CenturyLink facilities along (insertproject route) between (insert project extents) for the Constructionof (insert Jurisdiction's Project Name and Number). Existing buried splice New buried splice New leased pole Existing leased poleL L Abbreviations ct. Countpr. Pairpp Pending Placementug. Underground Existing joint use pole New joint use pole New foreign owned (e.g. power) Existing foreign owned (e.g. power) J J Existing CenturyLink power pedestal New CenturyLink power pedestal P P Existing CenturyLink pole to be removed 1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW EXISTING FINISHED GRADE. 2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS. Notes All methods, materials, content and form contained in this material are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed, or displayed without the express written permission of Terra Technologies LLC. The technology presented in this material is protected under various U.S. and international patents and pending patent applications, including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934. MFP21001240 1.5' CONC WALLBENCH DWY 4'CHLK AC AC AC AC DWY DWY DWY AC AC AC AC 6' CHLK GATE DWY BUS SHELTER S 3RD ST SHATTUCK AVE SSHATTUCK AVE SS 4TH ST S 3RD STWHITWORTH AVE SMORRIS AVE SLOGAN AVE SBURNETT AVE SWILLIAMS AVE SMILL AVE SS 2ND ST WELLS AVE SHOUS E R W A Y S SW SUNSET BLVD RAINIER AVE SRAINIER AVE SS 2ND ST S 2ND STLAKE AVE SS 4TH PL SMITHERS AVE SS 3RD ST S 4TH ST MAIN AVE SBRO N S O N W A Y S NOTES 1.THE LOCATIONS OF EXISTING UNDERGROUND UTILITY SYSTEMS, AS SHOWN HEREON, ARE TAKEN FROM UTILITY LOCATE PAINT MARKS OR AS-BUILT PLANS AND ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. ALL LOCATOR SERVICES SHOULD BE CONTACTED PRIOR TO ANY CONSTRUCTION OR SUBSURFACE EXPLORATION. CALL 1-800-424-5555. 2.FIELD SURVEY: KPG, NOVEMBER, 2017 - FEBRUARY, 2018; SEPTEMBER 2018 - DECEMBER 2018; FEBRUARY 2019. 3.CONTOUR INTERVAL = 1 FOOT. 4.STORM AND SEWER CONNECTIONS HAVE BEEN DRAWN FROM CENTER OF LID TO CENTER OF LID. 5.THE LOCATIONS AND DIMENSIONS OF UNDERGROUND VAULTS HAVE NOT BEEN VERIFIED AND ARE APPROXIMATE. 6.THIS IS THE CENTER OF TWO OR MORE PAINTED LINES INDICATING A DUCT RUN OF WIDTH AS NOTED. MULTIPLE LINES AND/OR UTILITIES MAY SHARE DUCT RUNS; THIS MAY NOT BE SHOWN IN THE DRAWING. HORIZONTAL DATUM WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NAD 83/91 PER CITY OF RENTON CONTROL STATIONS 205, 884, 1140, AND 1896. VERTICAL DATUM NAVD 88, PER CITY OF RENTON CONTROL STATIONS 2123 AND 2128. NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SRV CTL.dwg G-5 9/6/2019 3:02 PM HCM 23.0s (LMS Tech)SHEET 120 1 NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SRV CTL.dwg G-5 9/6/2019 3:02 PM HCM 23.0s (LMS Tech)SHEET 120 1 18-2251.400 G-5 of X RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT SEPTEMBER 2019 Murraysmith www.murraysmith.us PRELIMINARY ONLYDO NOT USE FOR CONSTRUCTION September 2019 REVISED 50% SUBMITTAL SEO TTT AS SHOWN SURVEY DATA CONTROL PLAN AND NOTES PLAN SCALE: NTS SS-1, W-1 SS-2, W-2 SS-3, SD-3, W-3 SS-4, SD-4 SS-5 SS-24 SS-11SS-10, SD-10, W-10SS-9, SD-9 SS-8, SD-8 SS-7, SD-7, W-7SS-6 SS-13SS-14 SS-12SS-15, SD-15, W-15SS-16, SD-16, W-16SD-17, W-17SD-18, W-18SS-19, SD-19,W-19SS-21SS-22, SD-22SS-23, SD-23SS-25, W-25SS-26, W-26SS-20, SD-20,W-20SS-21, SD-21SD-24 SHEET 3 SHEET 4SHEET 5SHEET 7KEY MAP 3 of 7 MFP21001240 ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••32 32 31 31 32 32 32 32 32STOPC5+00 C6+00 C7+00 C8+00 C9+00 E1+0 0 C5+00 C6+00 C7+00 C8+00 C9+00 24" C900 SS 21" SDR 35 SS C5+00 C6+00 C7+00 C8+00 C9+00 STA C4+90, 14.6' LT 1-48'' SDMH #9 STA C5+32, 14.6' LT 1-48'' SDMH #10 STA C5+32, 21.0' LT 1-CB #13 IE(OUT)12"(S)=27.88 STA C6+85, 14.6' LT1-48'' SDMH #11 STA C6+85, 21.3' LT 1-CB #14 IE(OUT)12"(S)=26.40 STA C8+39, 14.6' LT 1-48'' SDMH #12 STA C8+39, 21.2' LT 1-CB #15 IE(OUT)12"(S)=27.10 12"C900 SD 12"C900 SD 12"C900 SD 12"C900 SD 5 10 15 20 25 30 35 40 5 10 15 20 25 30 35 40 C4+80 C5+00 C5+20 C5+40 C5+60 C5+80 C6+00 C6+20 C6+40 C6+60 C6+80 C7+00 C7+20 C7+40 C7+60 C7+80 C8+00 C8+20 C8+40 C8+60 C8+80 C9+00 C9+20 C9+40 C9+60EXIST WSEXIST WS153 LF 12" C900 @ SLP=0.50%154 LF 12" C900 @ SLP=0.50% 48'' SDMH #10 IE(IN)12"(E)=23.07 IE(IN)12"(N)=27.80 IE(OUT)12"(W)=23.07 STA C5+32, 15' LT RIM=31.23 48'' SDMH #9 IE(IN)12"(E)=22.38 IE(OUT)12"(NW)=22.37 STA C4+90, 15' LT RIM=31.20 48'' SDMH #11 IE(IN)12"(E)=23.83 IE(IN)12"(N)=26.34 IE(OUT)12"(W)=23.83 STA C6+85, 15' LT RIM=31.42 144 LF 12" C900 @ SLP=0.50% 42 LF 12" C900 @ SLP=1.63%48'' SDMH #12 IE(IN)12"(E)=24.60 IE(IN)12"(N)=26.99 IE(OUT)12"(W)=24.60 STA C8+39, 15' LT RIM=31.73EXIST UGPEXIST 12" WEXIST FHEXIST UGP(RECONNECT) (RECONNECT) 20100 40 60 PLAN SCALE: 1"=20' 18-2251 SD-7 of 120 RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT November 2020AS SHOWN S 3RD ST STORM PLAN & PROFILE STA C4+80 TO STA C9+60 SEO BAW TTT 25NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SD.dwg SD-7 11/11/2020 3:33 PM ANGEL.CASTRO 23.0s (LMS Tech)SHEET 120 1 SCALE: 1"=20' HORIZ, 1"=5' VERT PROFILE EXIST GR @ ROW CL S 3RD ST MATCHLINE STA C9+60SEE SHEET SD-8MATCHLINE STA A9+60SEE SHEET SD-811 12 1212 12 1 TYP 11 11 15 74CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 INSTALL CB PER COR STD PLAN 200.00 INSTALL CB PER COR STD PLAN 201.00 CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE INSTALL 5 LF OF 12-IN PP PIPE AT SLP=1.6% INSTALL 5 LF OF 12-IN PP PIPE AT SLP=1.2% INSTALL 5 LF OF 12-IN PP PIPE AT SLP=2.2% EXIST FRANCHISE UTILITY TO BE RELOCATED BY OTHERS DURING CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY PRIOR TO CONSTRUCTION CONSTRUCTION NOTES: 1 11 12 15 2727 24 24 25 26 25 26 27 250 300 107 111 115 125 112 112 112 11/16/20 HH HHHH HH #3-5, 463-TA tductductductduc tduc 1-unknown duct 1-unknown duct 1-300 pr. ug. tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc HH #107-1, 463-TA tduc tduc tduc HH #115, 463-TA 1-unknown duct 1-300 pr. ug. 1-unknown duct 1-300 pr. ug.tduc100 pr. ug.btel50 pr. buried 3-unknown ducts 2-200 pr. ug. 1-24 ct. ug. fiber 1-tracer wire HH HH #7-2, 463-TA HH HH #HH 106, 264-TA tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc tductductductduc1-100 pr. ug. 1-24 ct. ug. fiber 1-tracer wire 4 of 7 C C = Excavate and Lower Existing Conduits/Cables approximately 1.5' Replace Existing Surface improvements in kind MFP21001240 ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••313131 31 •••••••••••••••••••••••••••••••••••••••••••••••••• F6+00 F7+00 F8+00 F9+00 F10+00 12"DI W 21" SDR 35 SS8" SDR 35 SS F6+00 F7+00 F8+00 F9+00 F10+00F6+00 F7+00 F8+00 F9+00 F10+00 STA F5+86, 21.2' RT 1-CB #17 STA F5+99, 10.7' RT 1-48'' SDMH #15 STA F5+88, 17.1' RT 1-48'' SDMH #14 STA F7+73, 21.3' LT 1-48" SDMH #56W/ RECTANGULAR FRAME & VANED GRATE STA F7+67, 13.6' RT 1-48'' SDMH #33 STA F7+66, 21.0' RT 1-CB #42 STA F8+98, 18.8' LT 1-48'' SDMH #52 W/RECTANGULAR FRAME & VANED GRATE STA F9+24, 13.7' RT 1-60'' SDMH #34 STA F8+96, 23.4' RT 1-CB #44 STA F9+60, 28.0' RT 1-CB #46 STA F10+01, 18.1' LT 1-48'' SDMH #53 W/RECTANGULARFRAME & VANED GRATE STA F10+01, 13.6' RT 1-48'' SDMH #35 STA F10+80, 18.2' LT 1-48'' SDMH #54 W/RECTANGULARFRAME & VANED GRATE 18" PP SD 24" PP SD18" PP SD24" PP SD 24" PP SD12"PP SD12"PP SD12" D I S D 12"DI S D 12 " C 9 0 0 SD12"C900 SD5 10 15 20 25 30 35 40 5 10 15 20 25 30 35 40 F5+60 F5+80 F6+00 F6+20 F6+40 F6+60 F6+80 F7+00 F7+20 F7+40 F7+60 F7+80 F8+00 F8+20 F8+40 F8+60 F8+80 F9+00 F9+20 F9+40 F9+60 F9+80 F10+00 F10+20 F10+40EXIST 12"WEXIST 12"SDIE=25.6EXIST UGPEXIST UGPEXIST TEXIST 16"WEXIST UGP/COMM DUCTEXIST WSEXIST GEXIST COMPROP 21" SSIE=18.8EXIST 12"SD(TO BE ABAN)EXIST T63 LF 18" PP SD @ SLP=0.33% 48'' SDMH #14 IE(IN)18"(N)=21.72 IE(IN)12"(S)=21.72 IE(IN)12"(NW)=26.80 IE(OUT)18"(SE)=21.72 STA F5+88, 17' RT RIM=31.04 48'' SDMH #15 IE(IN)18"(NW)=21.69 IE(OUT)18"(S)=21.69 STA F5+99, 11' RT RIM=31.26 48'' SDMH #16 SEE SHT SD-8 105 LF 24" PP SD @ SLP=0.38% 48'' SDMH #33 IE(IN)24"(N)=20.63 IE(IN)12"(W)=25.14 IE(IN)12"(E)=23.62 IE(OUT)24"(S)=20.63 STA F7+67, 14' RT RIM=30.69 60'' SDMH #34 IE(IN)24"(N)=20.10 IE(IN)12"(N)=24.40 IE(IN)12"(E)=23.50 IE(IN)12"(NE)=24.09 IE(IN)12"(SW)=26.84 IE(OUT)24"(S)=20.10 STA F9+24, 14' RT RIM=30.81 157 LF 24" PP SD @ SLP=0.34% 13 LF 18" PP SD @ SLP=0.23% 48'' SDMH #35 IE(IN)24"(N)=19.84 IE(IN)12"(E)=20.24 IE(OUT)24"(S)=19.84 STA F10+01, 14' RT RIM=30.26 77 LF 24" PP SD @ SLP=0.34% ±(RECONNECT)EXIST UGPEXIST SS (TO BE ABAN)IE=23.0EXIST 4"GEXIST UGP20100 40 60 PLAN SCALE: 1"=20' 18-2251 SD-16 of 120 RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT November 2020AS SHOWN SHATTUCK AVE S STORM PLAN & PROFILE STA F5+60 TO STA F10+40 SEO BAW TTT 30NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SD.dwg SD-16 11/11/2020 3:33 PM ANGEL.CASTRO 23.0s (LMS Tech)SHEET 120 1 SCALE: 1"=20' HORIZ, 1"=5' VERT PROFILES 3RD STMATCHLINE STA F10+40SEE SHEET SD-17SHATTUCK AVE S MATCHLINE STA F5+60SEE SHEET SD-15MATCHLINE STA F5+60SEE SHEET SD-15MATCHLINE STA F10+40SEE SHEET SD-17EXIST GR @ ROW CL 12 12 15 1 TYP 15 11 11 12 12 12 12 13 SDMH #16, SEE SHT SD-8 S 3RD PLFOR CONTINUATION SEE SHEET SD-8 11 15 12 11 CB #19, SEE SHT SD-8 CB #18, SEE SHT SD-8 13 15 565710916 12 AT&T CRITICAL FIBER OPTIC, PROTECT IN PLACE PER 1-07.17 AT&T CRITICAL FIBER OPTIC, PROTECT IN PLACE PER 1-07.17 AT&T CRITICAL FIBER OPTIC, PROTECT IN PLACE PER 1-07.17 16 16 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 INSTALL CB PER COR STD PLAN 200.00 INSTALL CB PER COR STD PLAN 201.00 CONNECT PIPE TO EXIST DRAINAGE STRUCTURE CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION AND TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN LATERAL IS ACTIVE, RECONNECT EXIST PIPE TO NEW STORM DRAIN PIPE WITH NYLOPLAST FITTING OR APPROVED EQUAL, PER THE SPECIFICATIONS EXIST FRANCHISE UTILITY TO BE RELOCATED BY OTHERS PRIOR TO CONSTRUCTION SEE PROFILE 6 ON SHT SD-42 SEE PROFILE 7 ON SHT SD-42 SEE PROFILE 8 ON SHT SD-42 SEE PROFILE 1 ON SHT SD-43 SEE PROFILE 2 ON SHT SD-43 CONDUCT SITE SPECIFIC UTILITY POTHOLING IN ADVANCE OF CONSTRUCTION TO CONFIRM LOCATION AND ELEVATION OF UTILITY, IF CONFLICT PREVENTS INSTALLATION OF A TYPE 1 CB, CONTRACTOR SHALL INSTALL A SHALLOW CONCRETE INLET WITH ENGINEER APPROVAL PER COR STD PLAN 200.3 AT NO ADDITIONAL COST TO THE CITY EXIST FRANCHISE UTILITY TO BE RELOCATED BY OTHERS DURING CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY PRIOR TO CONSTRUCTION CONSTRUCTION NOTES: 1 11 12 13 15 16 PLACE DENSE FOAM CUSHION PER THE SPECIFICATION BETWEEN SD AND W AS DIRECTED BY THE ENGINEER 18 18 SEE DET 2, SHT SD-45 18 18 19 20 21 22 23 24 19 20 20 27 22 21 22 23 301 207 220 2424 27 11/16/20 11/16/20HHHHHHHH HH #12-1, 463-TA tductductductductductduc1-unknown duct 1-300 pr. ug. HH #205-1, 463-TAtductduc1-unknown duct 1-300 pr. ug. tduc tduc tduc tduc HH #205-1, 463-TA 1-unknown duct 1-300 pr. ug. 1-400 pr. ug. 1-48 ct. ug. fiber (pp)btelbtel 25 pr. buried tductductductduc1-unknown duct 2-400 pr. ug. 1-48 ct. ug. fiber (pp) HH #17-1, 463-TA tduc tductduc tduc1-unknown duct 2-4" pvc ducts 1-1200 pr. ug. 1-24 ct. ug. fiber 1-48 ct. ug. fiber (pp) 1-Tracer wire HH HH #UN58, 463-TA tductduc1-unknown duct tduc tduc tduc tduc tductductductduc1-unknown duct 1-100 pr. ug. tduc tduc tduc tduc tduc tduc tduc tduc tduc tduc btel btel btel btel btel btel btel btel btel 1-unknown duct 1-48 ct. ug. fiber (pp)1-200 pr. buried 15 of 29SEE SHEET 16SEE SHEET 14SEE SHEET 12 SEE SHEET 11 5 of 7 C = Excavate and Lower Existing Conduits/Cables approximately 1.5' if needed C C MFP21001240 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 30 30 3030 29 29 29 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••• F11+00 F12+00 F13+00 F14+00 F15+00F11+00 F12+00 F13+00 F14+00 F15+00F11+00 F12+00 F13+00 F14+00 F15+00 STA F10+01, 13.6' RT 1-48'' SDMH #35 STA F10+80, 13.6' RT 1-48'' SDMH #36 STA F10+80, 21.5' RT 1-CB #49 STA F10+80, 18.2' LT 1-48'' SDMH #54 W/RECTANGULAR FRAME & VANED GRATE STA F12+04, 21.5' RT 1-CB #51 STA F12+04, 17.4' RT 1-60'' SDMH #38 STA F12+37, 27.1' LT1-CB #52 STA F12+15, 17.3' RT 1-60'' SDMH #39 STA F13+65, 21.9' RT 1-CB #54 STA F13+65, 13.9' RT 1-60'' SDMH #40 STA F13+65, 21.1' LT 1-48'' SDMH #55 W/RECTANGULAR FRAME & VANED GRATE STA F11+85, 27.5' LT 1-CB #50 STA F12+03, 26.3' LT 1-48'' SDMH #37 36" PP SD24" PP SD24" PP SD 12"PP SD24"PP SD18"PP SD12"DI SD 36"PP SD 12"C900 SD(RECONNECT) (RECONNECT) 5 10 15 20 25 30 35 40 5 10 15 20 25 30 35 40 F10+40 F10+60 F10+80 F11+00 F11+20 F11+40 F11+60 F11+80 F12+00 F12+20 F12+40 F12+60 F12+80 F13+00 F13+20 F13+40 F13+60 F13+80 F14+00 F14+20 F14+40 F14+60 F14+80 F15+00EXIST GSEXIST WSEXIST UGPEXIST UGP124 LF 24" PP SD @ SLP=0.34%150 LF 36" PP SD @ SLP=0.23% 11 LF 24" PP SD @ SLP=0.19% 48'' SDMH #36 IE(IN)24"(N)=19.57 IE(IN)12"(E)=20.09 IE(IN)12"(W)=24.45 IE(OUT)24"(S)=19.57 STA F10+80, 14' RT RIM=30.10 146 LF 36" PP SD @ SLP=0.25% 60'' SDMH #40 IE(IN)36"(N)=18.78 IE(IN)12"(W)=23.60 IE(IN)12"(E)=21.65 IE(OUT)36"(S)=18.78 STA F13+65, 14' RT RIM=29.55 60'' SDMH #39 IE(IN)24"(N)=19.13 IE(IN)6"(W)=22.40 IE(OUT)36"(S)=19.13 STA F12+15, 17' RT RIM=29.71 79 LF 24" PP SD @ SLP=0.34% 60'' SDMH #38 IE(IN)24"(N)=19.15 IE(IN)18"(E)=19.48 IE(IN)12"(W)=24.27 IE(IN)18"(N)=22.00 IE(OUT)24"(S)=19.15 STA F12+04, 17' RT RIM=29.71 20100 40 60 PLAN SCALE: 1"=20' 18-2251 SD-17 of 120 RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT November 2020AS SHOWN SHATTUCK AVE S STORM PLAN & PROFILE STA F10+40 TO STA F15+00 SEO BAW TTT 31NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SD.dwg SD-17 11/11/2020 3:33 PM ANGEL.CASTRO 23.0s (LMS Tech)SHEET 120 1 SCALE: 1"=20' HORIZ, 1"=5' VERT PROFILE EXIST GR @ ROW CLS 4TH STMATCHLINE STA F15+00SEE SHEET SD-18SHATTUCK AVE S MATCHLINE STA F10+40SEE SHEET SD-16MATCHLINE STA F15+00SEE SHEET SD-18MATCHLINE STA F10+40SEE SHEET SD-1612 11 12 12 12 12 11 11 12 1 15 TYP 11 11 12 15 15 15 12CONTRACTOR SHALL VERIFY EXIST SD ELEVATION PRIOR TO CONSTRUCTION. FINAL DEPTH OF SDMH #37 SHALL BE PER DIRECTION OF CITY ENGINEER AT&T CRITICAL FIBER OPTIC, PROTECT IN PLACE PER 1-07.17 AT&T CRITICAL FIBER OPTIC, PROTECT IN PLACE PER 1-07.17 16 16 1616 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 REPLACE SURVEY MONUMENT PER CITY STANDARD DETAIL H031 AS REQUIRED FOR CONSTRUCTION INSTALL CB PER COR STD PLAN 200.00 INSTALL CB PER COR STD PLAN 201.00 CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION AND TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN LATERAL IS ACTIVE, RECONNECT EXIST PIPE TO NEW STORM DRAIN PIPE WITH NYLOPLAST FITTING OR APPROVED EQUAL, PER THE SPECIFICATIONS EXIST FRANCHISE UTILITY TO BE RELOCATED BY OTHERS PRIOR TO CONSTRUCTION SEE PROFILE 3 ON SHT SD-43 SEE PROFILE 4 ON SHT SD-43 SEE PROFILE 5 ON SHT SD-43 SEE PROFILE 6 ON SHT SD-43 CONDUCT SITE SPECIFIC UTILITY POTHOLING IN ADVANCE OF CONSTRUCTION TO CONFIRM LOCATION AND ELEVATION OF UTILITY CONSTRUCTION NOTES: 1 11 12 15 16 18 18 11336 400 408 416 418 440 19 20 21 22 22 20 20 21 21 19 24 24 8 8 11/16/20HH HH1-unknown duct 1-48 ct. ug. fiber (pp) 200 pr. buried btel btel btel btel bteltductductductductductduc tduc tduc tduc HH #UN59, 463-TA HH #11-3, 463-TA btel btel btel bteltductductduc tduc tduc tduc tduc tduc tduc tduc tduc tduc btel btel btel btel btel btel btel 200 pr. buriedPedestal 1-unknown duct (bored) 1-48 ct. ug. fiber (pp)SEE SHEET 15SEE SHEET 176 of 7 C A C = Excavate and Lower Existing Conduits/Cables approximately 1.5' if needed A = Excavate Pit, Remove Handhole, Backfill & Replace Existing Improvements in Kind MFP21001240 ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••46 454644 45 4544 4 4 45 46 4 343 CRPL#3 66" STL CPPL#3 66" STLK3+00K4+00L0+00 L1+00 L2+00 L3+00 L4+00 12"DI W TS TS TS L0+00 L1+00 L2+00 L3+00 L4+0012" C900 SSK3+00K4+008" SDR 35 SS12" CIPP SSC900L0+00 L1+00 L2+00 L3+00 L4+00 STA L4+31, 17.4' RT 1-CB #65 STA L4+60, 15.5' LT 1-CB #67 STA L4+60, 17.4' RT 1-CB #66 12"PP SD24"C900 SD25 30 35 40 45 50 55 60 25 30 35 40 45 50 55 60 L0+40 L0+60 L0+80 L1+00 L1+20 L1+40 L1+60 L1+80 L2+00 L2+20 L2+40 L2+60 L2+80 L3+00 L3+20 L3+40 L3+60 L3+80 L4+00 L4+20 L4+40 L4+60 L4+80 48'' SDMH #47 IE(IN)12"(S)=39.20 IE(IN)12"(W)=39.00 IE(OUT)24"(E)=39.20 STA L4+16, 14' RT RIM=45.46 CB #67 IE(IN)12"(S)=41.57 IE(OUT)12"(W)=41.57 STA L4+60, 16' LT RIM=45.07EXIST 2"G15 LF 12" PP SD @ SLP=5.66% CB #65 IE(IN)12"(S)=40.05 IE(OUT)12"(N)=40.05 STA K3+07, 35' RT RIM=44.72 CB #66 IE(IN)12"(E)=41.40 IE(OUT)12"(N)=41.40 STA L4+60, 17' RT RIM=44.95 29 LF 12"C900 @ SLP=4.66%PROP 12"CIPP SSEXIST TEXIST TEXIST UGP (2)EXIST 2"GEXIST SS LATSPU CRPL BEYOND 18-2251 SD-25 of 120 RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT November 2020AS SHOWN MILL AVE S STORM PLAN & PROFILE STA L0+00 TO STA L4+80 SEO BAW TTT 37NO.DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SD.dwg SD-25 11/11/2020 3:33 PM ANGEL.CASTRO 23.0s (LMS Tech)SHEET 120 1 SCALE: 1"=20' HORIZ, 1"=5' VERT PROFILE MILL AVE S S 2ND STFOR CONTINUATION SEE SHEET SD-24 MATCHLINE STA L4+80SEE SHEET SD-2620100 40 60 PLAN SCALE: 1"=20' EXIST GR @ ROW CL MATCHLINE STA L4+80SEE SHEET SD-266970CB #68, SEE SHT SD-24 16 11 11 11 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 INSTALL CB PER COR STD PLAN 200.00 PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION AND TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN LATERAL IS ACTIVE, RECONNECT EXIST PIPE TO NEW STORM DRAIN PIPE WITH NYLOPLAST FITTING OR APPROVED EQUAL, PER THE SPECIFICATIONS SEE PROFILE 6 ON SHT SD-44 SEE PROFILE 7 ON SHT SD-44 CONSTRUCTION NOTES: 1 11 16SDMH #48, SEE SHT SD-24 SDMH #47, SEE SHT SD-24 1 TYP 100 1023 1010 19 20 20 19 GAS WILL BE DEACTIVATED BY PSE PRIOR TO CONSTRUCTION 11/16/20 tductductductductductductductducHH tduc tduc tduc tduc tduc tduc tduc tduc tductductduc 1-unknown duct 1-100 pr. ug.btelbtel50 pr. buried td u c td u c td u c td u c td u c 1-BIP duct 1-400 pr. ug. t d u c t d u c td u c td u c t d u c 12-TK transite ducts 1-900 pr. ug. 1-1100 pr. ug. 3-1500 pr. ug. 1-1800 pr. ug. 2-2400 pr. ug. 1-2700 pr. ug. 7 of 7 B = APS to open MH and Point out the limits of the existing structure B MFP21001240