HomeMy WebLinkAboutCO 1Change Order #01 Change Order WSDOT LAG Change Order Checklist Originating Documents (Verbal Approval, i.e. CCD, email, memo to file) Independent Cost Estimate (ICE) Contractor’s Proposal/Cost Estimate (RFP – Request for Proposal) Time Impact Analysis (TIA) Back Up Change Order Checklist Date Sent to Contractor: Date Signed / Acknowledged by Contractor: Date Approved by Agency: Date Fully Executed Copy Sent to Contractor: CAG-20-143, CO #1-21 City of Renton Change Order #1 2/24/2021 1 Background: Reason/Justification for Change: Description of Change: Contract Items Added/Deducted: Deduct 0 Deduct 0 Deduct 0 Deduct 0 Deduct 0 Deduct 0 Subtotal Existing Items: New Items Added: Add 48 EA Add 1 CY Add 1 LS Add 1 LS Add Add You are ordered to perform the following described work upon receipt of an approved copy of this change order: Due to the existing cross slope of the sidewalk near STA 89+00 RT, the planned grade break in the sidewalk would result in a cross slope from the grade break to back of curb in excess of 12%. The attached plans provide a 2” increase to the typical curb height. The cross slope and increased curb height transition would create a trip hazard at the tree grate frame. This change also includes the change to have the tree grates and frames omitted from the tree pits and the addition of plantings per the attached plans. The tree grates and frames will be delivered to the City. CO1-04 item is based on the sum of Force Account Sheets #9, #9.1 and #11. This time is for the setting of forms to create a grade break in the sidewalk on the west side of the project as per FWD #002. Change Order Page 2 of 3 This change order is due to existing conditions that would exceed ADA standards. Three (3) additional working days are added to the contract time. N/A Add new item: C01-01 - 1-Gal. Autumn Moor Grass: Add new item: C01-02 - Bark Mulch: Add new item: C01-03 - Curb Height Transition Add new item: C01-04 - FA Tracked Time for Grade N/A N/A N/A N/A N/A N/A N/A 1 Measurement: Measurement for New Item #C01-01 will be per EA. Measurement for New Item #C01-02 will be per CY. Measurement for New Item #C01-03 will be per LS. Measurement for New Item #C01-04 will be per LS. Measurement for New Item #C01-05 will be per . Measurement for New Item #C01-06 will be per . Payment: SUMMARY OF QUANTITIES Existing Bid Item Adjustments Item No.Description Unit Qty.Unit Price Amount Change Order Items Item No.Description Unit Qty.Unit Price Amount EA 48 CY 1 LS 1 LS 1 $0.00 SUBTOTAL CHANGE ORDER AMOUNT: WSST (%): TOTAL CHANGE ORDER AMOUNT:$8,720.67 $0.00 -- Payment for all work associated with the tasks described above shall be made under new items at unit prices as detailed in the summary of quantities below, and will be full compensation for all costs associated with labor, equipment, incidental material, haul, tools, incidentals, subcontractor and service provider mark-up, overhead and profit required to furnish, install, and successfully complete all work for the above-described tasks Change Order Page 3 of 3 Subtotal Existing Items: - - - -- - - C01-01 1-Gal. Autumn Moor Grass 37.00$ - C01-04 FA Tracked Time for Grade Break 3,093.67$ 3,093.67$ 1,776.00$ C01-02 Bark Mulch 101.00$ 101.00$ $8,720.67 $8,720.67 -- -- Subtotal Change Order Items: C01-03 Curb Height Transition Scope 3,750.00$ 3,750.00$ Originating Documents REQUEST FOR PROPOSAL DATE: 01/25/21 BUDGET NO.: - PROJECT NO.: 19052 CONTRACT NO.: CAG-20-143 PROJECT NAME: Renton Downtown Core Streetscapes Phase 1 SUBJECT: Curb Height Transition and Removal of Tree Grates and Frames SPECIFICATION REF: 8-02, 8-03, 8-04, 8-32 PLAN REF: Sheets 5, 9, 12, 13, 14, 15 ATTACHMENTS: Revised Plan Sheets 5, 9, 12, 13, 14, 15 TO: PRIME CONTRACTOR Provide proposal and time impact analysis, within fifteen (15) days or as stated above for the scope of work described: NOTE: This is NOT a change order and does NOT constitute approval or notice to proceed on the issue. SCOPE: Due to the existing cross slope of the sidewalk near STA 89+00 RT, the planned grade break in the sidewalk would result in a cross slope from the grade break to back of curb in excess of 12%. The attached plans provide a 2” increase to the typical curb height. The cross slope and increased curb height transition would create a trip hazard at the tree grate frame. This change also includes the ch ange to have the tree grates and frames omitted from the tree pits and the addition of plantings per the attached plans. The tree grates and frames will be delivered to the City. MATERIAL: The attached plan sheets identify the new plant materials and ir rigation head changes. All materials not specifically identified in the plans or specifications shall conform to the WSDOT Standard Specifications. MEASUREMENT AND PAYMENT: No change is required for the bid items #25, #26, #27, 28, #29, #30 and #46 This RFP will add the following bid items to the contract; CO-XX – Sesleria autumnalis/ Autumn moor grass; 1 gal. cont. (48 EA) CO-XX – Bark or Wood Chip Mulch (1 CY) CO-XX – 8” Cement Concrete Traffic Curb, Incl. Transition, LS (1 LS) By: Michael Mayfarth Date: January 27th, 2021 CC: CEMENT CONC. RAMP FOR BUILDING ENTRANCE ROOF DRAIN DETAIL SHALLOW CONCRETE INLET •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• CURB HEIGHT TRANSTION DETAIL NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052DET-RD.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design R EGIST E R E D NOTGNI HSAWFOETATS ERN EPRFOE NNALIO E S IGS 41380OLIVIA B . PARA S C HI V7-24-2020TYPICAL ROADWAY DETAILS 5 19052 CDBG #C19352 JULY 2020 285 KPG BRAA BRAA OBP DOWNTOWN CORE STREETSCAPE PHASE 1 OBP S 3RD STS 2ND STWELLS AVE S GENERAL NOTES CONSTRUCTION NOTES BENCH TYPE I SCHEDULE BENCH TYPE I SCHEDULE BENCH TYPE I SCHEDULE WAYFINDING SIGN SCHEDULE TRASH-RECYCLE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052URB.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020PHU O N G N. NG U Y ENNO. 1 493 EXP. 0 9 /1 6 /2020STATE O F W A SHIN GTONLAND S CAP E A R C H ITECTURBAN DESIGN PLAN 9 19052 CDBG #C19352 JULY 2020 289 KPG JJ PN PN PLAN DOWNTOWN CORE STREETSCAPE PHASE 1 OBP BENCH SCHEDULE TREE GRATE SCHEDULE WASTE RECEPTACLE SCHEDULE PEDESTRIAN DIRECTION FOUNDATION AND POST SCHEDULE SALVAGED PLAQUE SCHEDULE S 3RD STS 2ND STWELLS AVE S CONSTRUCTION NOTES TREE PLANTING NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052LS.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020PHU O N G N. NG U Y ENNO. 1 493 EXP. 0 9 /1 6 /2020STATE O F W A SHIN GTONLAND S CAP E A R C H ITECTNUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052LS.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020PHU O N G N. NG U Y ENNO. 1 493 EXP. 0 9 /1 6 /2020STATE O F W A SHIN GTONLAND S CAP E A R C H ITECTPLAN LANDSCAPE PLAN & DETAILS 12 19052 CDBG #C19352 JULY 2020 2812 KPG JJ PN PN DOWNTOWN CORE STREETSCAPE PHASE 1 OBP PLANT SCHEDULE TREE GRATE PLANTING DETAIL ROOT BARRIER DETAIL TYPICAL GRASS PLANTING DETAIL TYPICAL STREET TREE PLANTING DETAIL WELLS AVE SS 3RD STS 2ND STCONSTRUCTION NOTES IRRIGATION LEGEND PIPE SIZE CHART NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052IRR.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020ELIZ A B E T H GIB S O NNO. 538 EXP. 0 8 /1 6 /2022STATE O F W A SHI N GTONLAND S CA P E A R C H ITECTIRRIGATION PLAN 13 19052 CDBG #C19352 JULY 2020 2813 KPG EGS EGS EGS PLAN DOWNTOWN CORE STREETSCAPE PHASE 1 OBP SEE SHEET 14 FOR COMPLETE IRRIGATION SCHEDULE, DETAILS AND GENERAL NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052IRR-DET.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020ELIZ A B E T H GIB S O NNO. 538 EXP. 0 8 /1 6 /2022STATE O F W A SHI N GTONLAND S CA P E A R C H ITECT14 19052 CDBG #C19352 JULY 2020 2814 KPG EGS EGS EGS IRRIGATION DETAILS DOWNTOWN CORE STREETSCAPE PHASE 1 OBP IRRIGATION SCHEDULE DRIP ACCESS VALVE BOX IN PAVEMENT FOR CONNECTION TO LUMINAIRE POLE LOW FLOW CONTROL VALVE TREE BUBBLER CONTROL VALVE PIPE AND CONTROL WIRE BUNDLE INSTALLATION NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 19052IRR-DET.dwg BID DOCUMENT Public Works Department CITY OF RENTON 3131 Elliott Ave Suite 400 Seattle, WA 98121 (206) 286-1640 2502 Jefferson Ave Tacoma, WA 98402 (253) 627-0720 www.kpg.com Interdisciplinary Design 7-24-2020ELIZ A B E T H GIB S O NNO. 538 EXP. 0 8 /1 6 /2022STATE O F W A SHI N GTONLAND S CA P E A R C H ITECT15 19052 CDBG #C19352 JULY 2020 2815 KPG EGS EGS EGS IRRIGATION DETAILS DOWNTOWN CORE STREETSCAPE PHASE 1 OBP FLOOD BUBBLER ASSEMBLY MANUAL SHUT OFF BRASS VALVE TYPICAL FLEXIBLE RISER Contractor's Proposal / Cost Estimate RFP #1 Pricing Renton Streetscapes Landscaping $1,877.00 • (48 EA) 1-Gal. Autumn Moor Grass @ $37.00 EA • (1 CY) Bark Mulch @ $101 CY • Irrigation (No charge. Change from contracted items to replaced items balance in cost) Concrete Curb Height Transition $3,250.00 • Cost to transition curb height per plans in RFP001. Cost is (1 LS) Grading and Additional Coordinating $500.00 • Estimated additional work/coordinating • Pour concrete • Slope concrete at a .05% slop to drain water • Install composite drain with weep holes and tie into existing storm drainage • Remove excess soil and dispose (27) Tons estimate • Install Trench Drain and tie into existing storm drainage • Subtotal: $5,627.00 Sales Tax: (0%) $0.00 Total: $5,627.00 Time Impact Analysis CPM Time Impact Analysis Contract: City of Renton - Renton Downtown Core Streetscapes Phase 1 Contract #: CAG-20-143 Change Order:C01 Contractor: RW Scott CM Reviewer: Michael Mayfarth Date: Requestor of Change: Initiator of Change: Detailed Description of Change: Reference Drawings: Reason for Change: Attached Supporting Documentation: Impacts of this Change on Related Work: Other Information: Three (3) additional working days are added to the contract as a result of the above items of work Enter Information Here City of Renton City of Renton Due to the existing cross slope of the sidewalk near STA 89+00 RT, the planned grade break in the sidewalk would result in a cross slope from the grade break to back of curb in excess of 12%. The attached plans provide a 2” increase to the typical curb height. The cross slope and increased curb height transition would create a trip hazard at the tree grate frame. This change also includes the change to have the tree grates and frames omitted from the tree pits and the addition of plantings per the attached plans. The tree grates and frames will be delivered to the City. CO1-04 item is based on the sum of Force Account Sheets #9, #9.1 and #11. This time is for the setting of forms to create a grade break in the sidewalk on the west side of the project as per FWD #002. 02/16/21 RFP 01 Drawings, This change order is due to existing conditions that would exceed ADA standards. RFP 01, Force Account Sheets 9, 9.1 and 11, Additional Backup