HomeMy WebLinkAbout0895.06 DFR 288&289.pdf Earth Solutions NW, LLC LETTER OF TRANSMITTAL 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 To: RJ Development Date: March 19, 2021 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Jeff Bennett Email: jeffb@accrete.build No. of Copies Date Description 1 3/15 – 3/16/21 Daily Field Report(s) # 288 & 289 Comments: CC: 1: Mark Richardson ATTN: mark@accrete.build 2: Jennifer Vogele ATTN: jennifer@accrete.build 3: Jonathan Chavez ATTN: jchavez@rentonwa.gov 4: Joe W ATTN: joew@accrete.build 5: ATTN: 6: ATTN: 7: ATTN: 8: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 288 Time On Site Time Off Site Date Day of Week 1: 5 PM 1:45 PM 3/15/21 Monday Travel Time Weather 1.00Hr. RT 50s, Sun Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test HMA paving in Talbot Road South at the Weatherly Inn development. Asphalt Testing ESNW rep. observed the contractor placing to final lift 6” HMA asphalt. The asphalt was compacted with a drum roller and vibratory sled compactor. Compaction tests indicated an adequate compaction of at least 92% of the RICE number in tested locations. ESNW rep will return to observe earthwork activities when requested by client Fig. 1: Power crossing trench paved with 6’’ HMA in Talbot Road South Jackson Lundgren, G.I.T. Senior Field Technician 206-468-0991 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 288 Time On Site Time Off Site Date Day of Week 1: 5 PM 1:45 PM 3/15/21 Monday Travel Time Weather 1.00Hr. RT 50s, Sun Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Test Number Test Location (Talbot Road South) Elevation Rice Value (pcf) Fill Moisture % Test Wet Density lbs./cu.ft. % of Rice Value 274 See map for approximate location -2’’ FG 154.0 N/A 147.1 96 275 See map for approximate location -2’’ FG 154.0 N/A 142.1 92 276 See map for approximate location FG 154.0 N/A 143.8 93 277 See map for approximate location FG 154.0 N/A 144.0 94 Fig. 2 Approximate location of compaction tests 274-277 on HMA paving in Talbot Road South. 2/2 274-277 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 289 Time On Site Time Off Site Date Day of Week 12:45 PM 1:45 PM 3/16/21 Tuesday Travel Time Weather 1.00Hr. RT 50s, Sun Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test HMA paving in Talbot Road South at the Weatherly Inn development. Asphalt Testing ESNW rep. observed the contractor placing to final lift 6” HMA asphalt. The asphalt was compacted with a drum roller and vibratory sled compactor. Compaction tests indicated an adequate compaction of at least 92% of the RICE number in tested locations. ESNW rep will return to observe earthwork activities when requested by client Fig. 1: Power crossing trench and water main connection paved with 6’’ HMA in Talbot Road South Jackson Lundgren, G.I.T. Senior Field Technician 206-468-0991 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 289 Time On Site Time Off Site Date Day of Week 12:45 PM 1:45 PM 3/16/21 Tuesday Travel Time Weather 1.00Hr. RT 50s, Sun Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Test Number Test Location (Talbot Road South) Elevation Rice Value (pcf) Fill Moisture % Test Wet Density lbs./cu.ft. % of Rice Value 278 See map for approximate location -2’’ FG 154.0 N/A 147.1 96 279 See map for approximate location FG 154.0 N/A 142.1 92 280 See map for approximate location FG 154.0 N/A 143.8 93 281 See map for approximate location FG 154.0 N/A 144.0 94 Fig. 2 Approximate location of compaction tests 274-277 on HMA paving in Talbot Road South. 2/2 278-280 281