HomeMy WebLinkAbout0895.06 SWFR 296A.pdfEarth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. AES
Project No. 0895.06 Page 1 of 3
Report No. 296A
Time On Site
3:40
Time Off Site
4:10
Date
3/25/21
Day of Week
Thursday
NPDES Permit No. WAR-307963 Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name Weatherly Inn Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
•Buffer Zones around Sensitive Areas
•Silt Fence
G N -Chain link and silt fences installed at perimeter
2. Establish Construction Access
•Fabric; Quarry Spalls
•Wheel Wash
•Sweeper Truck
F N
-Continue to street sweep during trucking ops and
whenever trackout is observed
-Continue to clean sidewalk near construction entrance
as needed
-Wheel wash onsite
3. Control Flow Rates
•Stormwater Vault or Facility
•Straw Wattles
•Check Dams
G N -Onsite stormwater vault plugged
4. Install Sediment Controls
•Silt Fence
•Straw Bale Barriers
•Vegetation
•Straw
•Sediment Ponds, Traps & Filters
•Treatment
•Sediment Pond (Temp. or Perm.)
•Water Truck
F N -Silt fence installed around majority of perimeter
5. Stabilize Soils
•Nets & Blankets
•Mulch, Bark & Rock
•Hydroseeding; Grass
•Plastic Sheeting
•Straw Stockpiles
•Stockpiles
•PAM
G N -Cover stockpiles unworked for 2 days and before
weekends
6. Protect Slopes
•Benching; Track-Walking
•Pipe Slope Drains
•Plastic Sheeting; Anchors
G N -Straw wattles in place to divert water away from
western slopes and construction entrance
7. Protect Drain Inlets
•Catch Basin Inserts
•Gutter; Road G N -CB inserts installed in catch basins on offsite roads
8. Stabilize Channels and Outlets
•Channel Lining
•Check Dam
•Outlet Protection
•Nets and Blankets
- - N/A
9. Control Pollutants
•Chemical Storage Area Covered
•Concrete Handling
F Y -Continue to treat stormwater with dry ice to lower
the pH
10. Control Dewatering G N -Via KC Sewer Discharge permit as needed
11. Maintain BMPs F Y -See action items below
12.Maintain SWPPP & Site Logbook G N Available upon request
13. Protect Low-Impact Development (LID BMPs)
•Bioretention Rain Garden Facilities
•Permeable Pavement
- - N/A
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. AES
Project No. 0895.06 Page 2 of 3
Report No. 296A
Time On Site
3:40
Time Off Site
4:10
Date
3/25/21
Day of Week
Thursday
NPDES Permit No. WAR-307963 Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name Weatherly Inn Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the completed, not-yet-completed, or ongoing action items in the table below:
Actions Items Completed?
(Yes; No; Ongoing)
Date
(If Completed)
Sweep site entrance when soil is seen on roadway O 3/25/21
Clean sidewalk near construction entrance O 3/25/21
Repair silt fence in northwestern corner of site Y 3/25/21
Current Weather: 52°F, Partly Cloudy
Precipitation since last inspection (approximate): 1.10 inches
Precipitation in the last 24 hours (approximate): 0.37 inches
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if
present:
•Hanna Turbidity Meter #: ESNW #10
Monitoring Location Turbidity
(NTU) pH Notes
Is the site in compliance with the SWPPP and the permit requirements? Yes No
If “No”:
•Indicate the tasks necessary to bring the site into compliance in the table above.
•Has the non-compliance been reported to the Department of Ecology?Yes No
•Should the SWPPP be modified?Yes No
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: March 25th, 2021
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. AES
Project No. 0895.06 Page 3 of 3
Report No. 296A
Time On Site
3:40
Time Off Site
4:10
Date
3/25/21
Day of Week
Thursday
NPDES Permit No. WAR-307963 Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name Weatherly Inn Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
w
BMP LEGEND
SILT FENCE
STOCKPILES
QUARRY SPALL ENTRANCE
BAKER TANK
WHEEL WASH
SWALE
SEDIMENT TRAP
WATTLE
MONITORING POINT