Loading...
HomeMy WebLinkAboutMFP21000957.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21000957 IVR Number: 21000957 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/05/2021Application Date:0323059245Parcel Number: 4709 NE 24TH ST Permit Type:04/05/2021Issue Date:Franchise Permit Work Class:04/05/2022Expiration Date:Minor Utility Job Number: 105095771Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REMOVE EXISITNG POLE AT P01 AND REPLACE WITH A NEW POLE AT P02. TRANSFER WIRES FROM OLD POLE TO NEW POLE. REMOVING OH TPX TO P03. AT EXISTING J01 INSTALL UG CABLE TO P02. INSTALL NEW SERVICE AT P02. APPROVED WITH COMMENTS OR REDLINES POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact TUSCANY CONSTRUCTION LLC PO BOX 6127 BELLEVUE , WA 98008 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 105095771 4709 NE 24TH ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 JENNY CHAU JENNY.CHAU@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21000957 Scott Warlick CED 4/5/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 4709 NE 24th St Renton WA 98059 USA P01 P02 P03 J01 1111ONLYONLY101010NE 24TH ST NE 24TH ST NE 23RD PL NE 23RD ST NE 23RD ST NE 21ST STDUVALL AVE NE1111111111J02 111111 1111 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE ARRW-BRD 1010ROAD WORKAHEAD W20-1350'350'350'W4-2LRIGHT LANE CLOSEDAHEAD W20-5RX'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROADWORK AHEAD W20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1 W20-1ROADWORKAHEADROADWORKAHEADW20-1 ONLYONLY101010W20-1ROADWORKAHEADW20-1ROADWORKAHEAD350'N TEMPORARY TRAFFIC CONTROL PLAN PSE PUGETSOUNDENERGY JOB January 7, 2021 105095771 4709 NE 24th St Renton, WA Yuriy.Bashtovoy@pse.com (425)424-6603 SHEET 1 of 3 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 L=W S 60 2 Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687 Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 WORK VEHICLE/ FLASHING LIGHTS 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION STOP FLAGGER LEGEND POLE CHEVRON ARROW BOARD RIGHT OF WAY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. PRINT ON 11 X 17 SHEETS ONLY 0'80'40' MFP21000957 4709 NE 24th St Renton WA 98059 USAP01P02P03J011111ONLYONLY101010NE 24TH STNE 24TH STNE 23RD PLNE 23RD STNE 23RD STDUVALL AVE NE1111111111STOPFLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4350'350'350'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4X'X'X'W20-7AROAD WORKAHEAD W20-1BEPREPAREDTO STOP W3-4X'X'X'ROADWORKAHEADW20-1W20-7AROADWORKAHEAD W20-1BEPREPARED TO STOP W3-4X'X'X'FIELD AVE NE NE 25TH ST X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'NTEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840L=W S602PSEPUGETSOUNDENERGYJOBJanuary 7, 20211050957714709 NE 24th St Renton, WAYuriy.Bashtovoy@pse.com(425)424-6603SHEET 2 of 3WORK VEHICLE/FLASHING LIGHTS28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONSTOPFLAGGERLEGENDPOLECHEVRONARROW BOARDRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be comp lete ly c lear unless otherw ise ind ica ted.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.PRINT ON 11 X 17SHEETS ONLY0'80'40'MFP21000957 J02 4709 NE 24th St Renton WA 98059 USA P01 P02 P03 1111ONLYONLY101010NE 24TH ST NE 24TH ST NE 23RD PL NE 23RD ST NE 23RD STDUVALL AVE NE11111111111111111111 ARRW-BRD FIELD AVE NE NE 25TH STROAD WORKAHEAD W20-1350'350'350'W4-2LRIGHT LANECLOSED AHEAD W20-5RROADWORKAHEADW20-1 W20-1ROADWORKAHEADW20-1ROADWORKAHEADROADWORKAHEADW2 0 - 1 3 5 0 ' N TEMPORARY TRAFFIC CONTROL PLAN PSE PUGETSOUNDENERGY JOB January 7, 2021 105095771 4709 NE 24th St Renton, WA Yuriy.Bashtovoy@pse.com (425)424-6603 SHEET 3 of 3 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 L=W S 60 2 Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687 Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 WORK VEHICLE/ FLASHING LIGHTS 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION STOP FLAGGER LEGEND POLE CHEVRON ARROW BOARD RIGHT OF WAY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. PRINT ON 11 X 17 SHEETS ONLY 0'80'40' MFP21000957 4901 2402 4909 4903 4700 47124706 4724 4730 4718 2401 4901 2350 4626 4627 140TH AVE SENE 25TH ST NE 24TH ST 138TH AVE SE4709 319023-167369 50 kVA 120/240V (C) 319022-167384 15 kVA 120/240V (C) CK00405 C#2AC S R C#4ACSR PRE 14 PRE 14 318986-167352 LOT 1 319019-167357 319003-131370 37.5 kVA 120/240V (A)CDWY DWY AEC124AEC122AEC121AE074 318995-167409 75 kVA 120/240V (C) 319024-167352 319045-167347 319029-167362 75 kVA (C) AOAEC120BOAEC121COAEC122 COAFP508 NE 24TH ST ROW 30' ROW 100' POTELCO TO REROUTE PRIMARY FROM P01 TO P02 CONDUIT INTERCEPT POINT INSTALL 40T FUSE SW#T84848 J J SITE PLAN N Vicinity Map 47.489, -122.17 SCALE: 1" = 50' SITE SPECIFIC NOTES AT J01: 318986-167352 -EXISTING JBOX TO REMAIN AT IP1: NEW -CONDUIT INTERCEPT POINT AT P01: 319019-167357 -REMOVE EXISTING 40' CL 3 DISTRIBUTION POLE -REMOVE EXISTING AMR, RETURN TO PSE YARD -TRANSFER EXISTING 1Ø PRIMARY AND NEUTRAL OH WIRES TO P02 -TRANSFER EXISTING "4700" OH SVC TO P02 AT P02: (NEW) 319003-131370 -INSTALL 45', CL 3 DISTRIBUTION POLE PER DEVELOPER STAKED LOCATION (PD453) 6010.1000 -INSTALL SINGLE PHASE PRIMARY AND NEUTRAL DEADEND (DE0115) 6031.1040 -INSTALL (1) 2" SINGLE PHASE PRIMARY RISER WITH NEW S/O BRACKET (RIS2CSS) 6042.1000 -INSTALL (1) 1Ø UG TO OH TERM ON PRIMARY ARM (UTSU1C1) 6043.1001 -INSTALL (1) HOT CLAMP, TAP C PHASE -INSTALL (1) 37.5kVA OH XFMR 120/240V W/LB C/O (FUSE @ 40T) PER STD 6025.1000 (TRFPXF) -INSTALL (1) 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100 -INSTALL (1) 10" SINGLE HELIX ANCHOR ROD 7' S (ANDH1) 6012.1000 -TRANSFER "4700" SVC FROM P01 TO P02 -INSTALL SWITCH # T84848 -INSTALL GRID # "319003-131370" AT P03: 319023-167369 -EXISTING 40', 1959 CL 3' DISTRIBUTION POLE TO REMAIN AT M01 (NEW METER BASE): -INSTALL 200A METER AT M02 (4700): -EXISTING METER TO REMAIN CIRCUIT FEET ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3200 SQ.ft 200AMPS GAS 9.8KW 115A .6% 2.4%00 1"2" 00 50'100' Owner / Developer Contact Info officeATTN: TUSCANY CONSTRUCTION LLC PO BOX 6127 BELLEVUE, WA 98008 BOB WENZL 206-714-6707 105095771HP Svc/MSA Distribution Superior ORDER#NOTIF#PROJECT PHASE CABLE TV PHONE GAS E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM Service Stubs UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 5/05/2020 ANN BETTENCOURT 206-584-4182 5/05/2020 --- ANN BETTENCOURT 206-584-4182 5/05/2020 RW-118360 RENTON 4709 NE 24TH ST POLE RMVL/NEW POLE/1O XFMR INSTALL//NEW OH SVC 4709 NE 24TH ST, RENTON, WA 98059 N/A N/A N/A 105095771 AS SHOWN 1/2 KING N/A N/A CSPSKEPM NE-9-A2N-305 N/A N/A 2305E033 2305E040 2305E033 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 509255363 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X XX JOB SITE SPAN SPECIFIC NOTES J01 TO IP1: -EXISTING PRIMARY CABLE TO REMAIN IP1 TO P01: -REROUTE EXISTING 1/O PRIMARY CABLE FROM P01 TO P02 P02 TO P03: -INSTALL NEW #2ACSR PRIMARY, ±120'____ACTUAL P02 TO M01: - INSTALL 4/O TRIPLEX, ±65'____ACTUAL P02 TO M02: -EXTEND EXISTING SERVICE WIRE, ±30'_____ ACTUAL PROJECT SCOPE -REMOVE POLE -PLACE NEW POLE -PLACE XFMR -XFR SVC TO NEW POLE 105095771 Pole Rplcmnt 101132744 Pole & Wire Rmvl 108123794 Misc 593225156 POWER GENERAL NOTES - RESIDENTIAL PROJECT 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 06/2020 391 443 417 --1.43 391 443 418.43 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P02 319003-131370 37.5 6211300 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P02 319003-131370 45 3 PSE Equip # POLE TABLE (REMOVAL) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 319019-167357 40 3 2008 PSE Equip # THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) service needs to be underground. underground. MFP21000957 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 319003-131370 37.5 kVA 120/240V (C) POTELCO WILL EXPOSE THE PRIMARY CUSTOMER PROVIDED 4'x4' WORK PIT ±20' 318986-167352J INSTALL 40T FUSE SW#T84848 CONDUIT INTERCEPT POINT PRIMARY IS GOING TO BE RE-ROUTED, WE ARE NOT INSTALLING NEW. OVERHEAD CIRCUIT MAP 105095771UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 5/05/2020 ANN BETTENCOURT 206-584-4182 5/05/2020 --- ANN BETTENCOURT 206-584-4182 5/05/2020 RW-118360 RENTON 4709 NE 24TH ST POLE RMVL/NEW POLE/1O XFMR INSTALL//NEW OH SVC 4709 NE 24TH ST, RENTON, WA 98059 N/A N/A N/A 105095771 AS SHOWN 2/2 KING N/A N/A CSPSKEPM NE-9-A2N-305 N/A N/A 2305E033 2305E040 2305E033 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A JOB SITE CABLE & CONDUIT DIAGRAM NOT TO SCALE UNDERGROUND CIRCUIT MAP JOB SITE SERVICE LINE (UTILITY OWNED) 11' MIN 3-1/2' MIN 11' MIN 3'MIN DECK ROOFS WITHPERMANENT ACCESS ROOFS WITHOUTPERMANENT ACCESS ELECTRICMETER GASMETER OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL SCALE: NONE UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale NOT TO SCALE SCALE: 6" = 1 MILE MFP21000957