Minor Franchise Permit: MFP21000957
IVR Number: 21000957
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:03/05/2021Application Date:0323059245Parcel Number: 4709 NE 24TH ST
Permit Type:04/05/2021Issue Date:Franchise
Permit Work Class:04/05/2022Expiration Date:Minor Utility
Job Number: 105095771Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REMOVE EXISITNG POLE AT P01 AND REPLACE WITH A NEW POLE AT
P02. TRANSFER WIRES FROM OLD POLE TO NEW POLE. REMOVING OH TPX TO P03. AT EXISTING J01 INSTALL
UG CABLE TO P02. INSTALL NEW SERVICE AT P02.
APPROVED WITH COMMENTS OR REDLINES
POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
TUSCANY CONSTRUCTION LLC PO BOX 6127
BELLEVUE , WA 98008
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105095771
4709 NE 24TH ST
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
JENNY CHAU JENNY.CHAU@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21000957
Scott Warlick CED 4/5/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
4709 NE 24th St
Renton
WA 98059
USA
P01
P02
P03
J01 1111ONLYONLY101010NE 24TH ST
NE 24TH ST
NE 23RD PL
NE 23RD ST
NE 23RD ST
NE 21ST STDUVALL AVE NE1111111111J02
111111
1111
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
ARRW-BRD 1010ROAD
WORKAHEAD W20-1350'350'350'W4-2LRIGHT LANE
CLOSEDAHEAD W20-5RX'X'PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROADWORK
AHEAD W20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1 W20-1ROADWORKAHEADROADWORKAHEADW20-1 ONLYONLY101010W20-1ROADWORKAHEADW20-1ROADWORKAHEAD350'N
TEMPORARY TRAFFIC CONTROL PLAN
PSE PUGETSOUNDENERGY
JOB
January 7, 2021
105095771
4709 NE 24th St Renton, WA
Yuriy.Bashtovoy@pse.com
(425)424-6603
SHEET 1 of 3
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
L=W S
60
2
Puget Sound Energy
Traffic Control Supervisor:
Yuriy S. Bashtovoy
Card No. 011687
Card Exp. 06/30/2022
Yuriy.Bashtovoy@pse.com
(425)424-6603
WORK VEHICLE/
FLASHING LIGHTS
28" TRAFFIC CONE
TRAFFIC FLOW
SIGN LOCATION
STOP
FLAGGER
LEGEND
POLE
CHEVRON
ARROW BOARD
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
PRINT ON 11 X 17
SHEETS ONLY
0'80'40'
MFP21000957
4709 NE 24th St Renton WA 98059 USAP01P02P03J011111ONLYONLY101010NE 24TH STNE 24TH STNE 23RD PLNE 23RD STNE 23RD STDUVALL AVE NE1111111111STOPFLAGGER
STOP
FLAGGER
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4350'350'350'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4X'X'X'W20-7AROAD
WORKAHEAD W20-1BEPREPAREDTO
STOP W3-4X'X'X'ROADWORKAHEADW20-1W20-7AROADWORKAHEAD W20-1BEPREPARED
TO
STOP W3-4X'X'X'FIELD AVE NE NE 25TH ST
X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'NTEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840L=W S602PSEPUGETSOUNDENERGYJOBJanuary 7, 20211050957714709 NE 24th St Renton, WAYuriy.Bashtovoy@pse.com(425)424-6603SHEET 2 of 3WORK VEHICLE/FLASHING LIGHTS28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONSTOPFLAGGERLEGENDPOLECHEVRONARROW BOARDRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be
comp
lete
ly c
lear
unless otherw
ise
ind
ica
ted.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.PRINT ON 11 X 17SHEETS ONLY0'80'40'MFP21000957
J02
4709 NE 24th St
Renton
WA 98059
USA
P01
P02
P03
1111ONLYONLY101010NE 24TH ST
NE 24TH ST
NE 23RD PL
NE 23RD ST
NE 23RD STDUVALL AVE NE11111111111111111111
ARRW-BRD
FIELD AVE NE NE 25TH STROAD
WORKAHEAD W20-1350'350'350'W4-2LRIGHT LANECLOSED
AHEAD W20-5RROADWORKAHEADW20-1
W20-1ROADWORKAHEADW20-1ROADWORKAHEADROADWORKAHEADW2
0
-
1
3
5
0
'
N
TEMPORARY TRAFFIC CONTROL PLAN
PSE PUGETSOUNDENERGY
JOB
January 7, 2021
105095771
4709 NE 24th St Renton, WA
Yuriy.Bashtovoy@pse.com
(425)424-6603
SHEET 3 of 3
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
L=W S
60
2
Puget Sound Energy
Traffic Control Supervisor:
Yuriy S. Bashtovoy
Card No. 011687
Card Exp. 06/30/2022
Yuriy.Bashtovoy@pse.com
(425)424-6603
WORK VEHICLE/
FLASHING LIGHTS
28" TRAFFIC CONE
TRAFFIC FLOW
SIGN LOCATION
STOP
FLAGGER
LEGEND
POLE
CHEVRON
ARROW BOARD
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
PRINT ON 11 X 17
SHEETS ONLY
0'80'40'
MFP21000957
4901
2402
4909
4903
4700
47124706
4724
4730
4718
2401
4901
2350
4626
4627 140TH AVE SENE 25TH ST
NE 24TH ST
138TH AVE SE4709
319023-167369
50 kVA 120/240V (C)
319022-167384
15 kVA 120/240V (C)
CK00405
C#2AC
S
R C#4ACSR
PRE
14
PRE
14
318986-167352
LOT 1
319019-167357
319003-131370
37.5 kVA 120/240V (A)CDWY DWY
AEC124AEC122AEC121AE074
318995-167409
75 kVA 120/240V (C)
319024-167352
319045-167347
319029-167362
75 kVA (C)
AOAEC120BOAEC121COAEC122
COAFP508
NE 24TH ST
ROW
30'
ROW
100'
POTELCO TO
REROUTE
PRIMARY FROM
P01 TO P02
CONDUIT INTERCEPT
POINT
INSTALL 40T FUSE
SW#T84848
J
J
SITE PLAN
N
Vicinity Map
47.489, -122.17
SCALE: 1" = 50'
SITE SPECIFIC NOTES
AT J01: 318986-167352
-EXISTING JBOX TO REMAIN
AT IP1: NEW
-CONDUIT INTERCEPT POINT
AT P01: 319019-167357
-REMOVE EXISTING 40' CL 3 DISTRIBUTION POLE
-REMOVE EXISTING AMR, RETURN TO PSE YARD
-TRANSFER EXISTING 1Ø PRIMARY AND NEUTRAL OH WIRES TO P02
-TRANSFER EXISTING "4700" OH SVC TO P02
AT P02: (NEW) 319003-131370
-INSTALL 45', CL 3 DISTRIBUTION POLE PER DEVELOPER STAKED LOCATION
(PD453) 6010.1000
-INSTALL SINGLE PHASE PRIMARY AND NEUTRAL DEADEND (DE0115) 6031.1040
-INSTALL (1) 2" SINGLE PHASE PRIMARY RISER WITH NEW S/O BRACKET (RIS2CSS) 6042.1000
-INSTALL (1) 1Ø UG TO OH TERM ON PRIMARY ARM (UTSU1C1) 6043.1001
-INSTALL (1) HOT CLAMP, TAP C PHASE
-INSTALL (1) 37.5kVA OH XFMR 120/240V W/LB C/O (FUSE @ 40T) PER STD 6025.1000 (TRFPXF)
-INSTALL (1) 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100
-INSTALL (1) 10" SINGLE HELIX ANCHOR ROD 7' S (ANDH1) 6012.1000
-TRANSFER "4700" SVC FROM P01 TO P02
-INSTALL SWITCH # T84848
-INSTALL GRID # "319003-131370"
AT P03: 319023-167369
-EXISTING 40', 1959 CL 3' DISTRIBUTION POLE TO REMAIN
AT M01 (NEW METER BASE):
-INSTALL 200A METER
AT M02 (4700):
-EXISTING METER TO REMAIN
CIRCUIT FEET ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3200 SQ.ft
200AMPS
GAS
9.8KW
115A
.6%
2.4%00 1"2"
00 50'100'
Owner / Developer Contact Info
officeATTN:
TUSCANY CONSTRUCTION LLC
PO BOX 6127
BELLEVUE, WA 98008
BOB WENZL 206-714-6707 105095771HP Svc/MSA
Distribution
Superior
ORDER#NOTIF#PROJECT PHASE
CABLE TV
PHONE
GAS
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JENNY CHAU
253-208-9480
JENNY.CHAU@PSE.COM
Service Stubs
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
JENNY CHAU 253-208-9480 5/05/2020
ANN BETTENCOURT 206-584-4182 5/05/2020
---
ANN BETTENCOURT 206-584-4182 5/05/2020
RW-118360 RENTON
4709 NE 24TH ST
POLE RMVL/NEW POLE/1O XFMR INSTALL//NEW OH SVC
4709 NE 24TH ST, RENTON, WA 98059
N/A N/A
N/A 105095771
AS SHOWN 1/2
KING N/A N/A CSPSKEPM
NE-9-A2N-305 N/A N/A
2305E033 2305E040 2305E033 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
509255363
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
XX
JOB
SITE
SPAN SPECIFIC NOTES
J01 TO IP1:
-EXISTING PRIMARY CABLE TO REMAIN
IP1 TO P01:
-REROUTE EXISTING 1/O PRIMARY CABLE FROM P01 TO P02
P02 TO P03:
-INSTALL NEW #2ACSR PRIMARY, ±120'____ACTUAL
P02 TO M01:
- INSTALL 4/O TRIPLEX, ±65'____ACTUAL
P02 TO M02:
-EXTEND EXISTING SERVICE WIRE, ±30'_____ ACTUAL
PROJECT SCOPE
-REMOVE POLE
-PLACE NEW POLE
-PLACE XFMR
-XFR SVC TO NEW POLE
105095771
Pole Rplcmnt 101132744
Pole & Wire Rmvl 108123794
Misc 593225156
POWER GENERAL NOTES - RESIDENTIAL PROJECT
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING
ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION
PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION
DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS
& TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
06/2020
391 443 417
--1.43
391 443 418.43
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P02
319003-131370
37.5
6211300
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 319003-131370 45 3 PSE Equip #
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 319019-167357 40 3 2008 PSE Equip #
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
service needs to be
underground.
underground.
MFP21000957
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
319003-131370
37.5 kVA 120/240V (C)
POTELCO WILL EXPOSE
THE PRIMARY
CUSTOMER PROVIDED
4'x4' WORK PIT
±20'
318986-167352J
INSTALL 40T FUSE
SW#T84848
CONDUIT INTERCEPT
POINT
PRIMARY IS GOING TO BE RE-ROUTED,
WE ARE NOT INSTALLING NEW.
OVERHEAD CIRCUIT MAP 105095771UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
JENNY CHAU 253-208-9480 5/05/2020
ANN BETTENCOURT 206-584-4182 5/05/2020
---
ANN BETTENCOURT 206-584-4182 5/05/2020
RW-118360 RENTON
4709 NE 24TH ST
POLE RMVL/NEW POLE/1O XFMR INSTALL//NEW OH SVC
4709 NE 24TH ST, RENTON, WA 98059
N/A N/A
N/A 105095771
AS SHOWN 2/2
KING N/A N/A CSPSKEPM
NE-9-A2N-305 N/A N/A
2305E033 2305E040 2305E033 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
JOB
SITE
CABLE & CONDUIT DIAGRAM
NOT TO SCALE
UNDERGROUND CIRCUIT MAP
JOB
SITE
SERVICE LINE
(UTILITY OWNED)
11' MIN
3-1/2' MIN
11' MIN
3'MIN
DECK
ROOFS WITHPERMANENT ACCESS ROOFS WITHOUTPERMANENT ACCESS
ELECTRICMETER
GASMETER
OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL
SCALE: NONE
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
NOT TO SCALE
SCALE: 6" = 1 MILE
MFP21000957