Loading...
HomeMy WebLinkAbout0895.06 DFR 230&231.pdf Earth Solutions NW, LLC LETTER OF TRANSMITTAL 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 To: RJ Development Date: April 6, 2021 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Jeff Bennett Email: jeffb@accrete.build No. of Copies Date Description 1 3/31-4/2/21 Daily Field Report(s) # 230 & 231 Comments: CC: 1: Mark Richardson ATTN: mark@accrete.build 2: Jennifer Vogele ATTN: jennifer@accrete.build 3: Jonathan Chavez ATTN: jchavez@rentonwa.gov 4: Joe W ATTN: joew@accrete.build 5: ATTN: 6: ATTN: 7: ATTN: 8: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 300 Time On Site Time Off Site Date Day of Week 2:15 PM 2:45 PM 3/31/21 Wednesday Travel Time Weather 1.00Hr. RT 50s, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test stormwater trench backfill at the Weatherly Inn development. Stormwater Trench Backfill: EDSNW rep arrived onsite and observed contractor backfilling a 3.5’ deep stormwater trench. Stormwater line consisted of 12’’ corrugated ABS stormwater line bedded in 5/8’’ minus crushed rock East of main building. Line run was between CB#4 and CB#24, and backfilled with 1 1/4’’ minus recycled crushed concrete compacted in 12’’ lifts to grade with a hoe pack. ESNW rep used a ½’’ steel T-probe and found the subgrade to be suitably dense, firm, and unyielding. ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or greater in tested locations. ESNW rep will return as requested to continue observation and testing of further earthwork activities. Fig. 1: Crushed recycled concrete stormwater trench backfill between CB#4 and CB#24. Jackson Lundgren, G.I.T. Senior Field Technician 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06  Time On Site Time Off Site Date Day of Week 2:15 PM 2:45 PM 3/31/21 Wednesday Travel Time Weather 1.00Hr. RT 50s, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Test Number Test Location (stormwater trench backfill) Elevation Reference Compaction Curve Maximum Dry Density (pcf) Fill Moisture (%) Test Dry Density (pcf) % of Maximum Dry Density 290 See map -1’ SG 9 127.7 7.6 122.9 96 291 See map -1’ SG 9 127.7 6.5 123.1 96 Fig. 2 Approximate location of compaction tests 290-291 on stormwater trench backfill East of main building. 2/2 290 291 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 301 Time On Site Time Off Site Date Day of Week 12:45 PM 1:15 PM 4/2/21 Friday Travel Time Weather 1.00Hr. RT 50s, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test stormwater trench backfill at the Weatherly Inn development. Stormwater Trench Backfill: EDSNW rep arrived onsite and observed contractor backfilling a 4’ deep stormwater trench. Stormwater line consisted of 12’’ corrugated ABS stormwater line bedded in 5/8’’ minus crushed rock East of main building. Line run was between CB#24, CB#5 and CB#6, and backfilled with 1 1/4’’ minus recycled crushed concrete compacted in 12’’ lifts to grade with a hoe pack. ESNW rep used a ½’’ steel T-probe and found the subgrade to be suitably dense, firm, and unyielding. ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or greater in tested locations. ESNW rep will return as requested to continue observation and testing of further earthwork activities. Fig. 1: Crushed recycled concrete stormwater trench backfill between CB#4 and CB#24. Jackson Lundgren, G.I.T. Senior Field Technician 206-468-0991 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 301 Time On Site Time Off Site Date Day of Week 12:45 PM 1:15 PM 4/2/21 Friday Travel Time Weather 1.00Hr. RT 50s, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Test Number Test Location (Stormwater trench backfill) Elevation Reference Compaction Curve Maximum Dry Density (pcf) Fill Moisture (%) Test Dry Density (pcf) % of Maximum Dry Density 292 See map SG 9 127.7 8.2 123.1 96 293 See map -1’ SG 9 127.7 7.3 121.9 95 294 See map -2’ SG 9 127.7 6.9 122.8 96 Fig. 2: Approximate location of compaction tests 292-294 on stormwater trench backfill East of main building. 2/2 294 293 292