Loading...
HomeMy WebLinkAboutMFP21001448.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21001448 IVR Number: 21001448 Permit Information Permit Name: Century Link Permits Address/Location:03/26/2021Application Date:7227801315Parcel Number: 2650 NE 10TH ST Permit Type:04/19/2021Issue Date:Franchise Permit Work Class:04/19/2022Expiration Date:Minor Utility Job Number: N.814428Franchise Type:Telephone Description: Century Link/Lumen to transfer facilities to new PSE pole, remove old Lumen pole, place new HH, and trench 45' across Glenwood Ave NE. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 N.814428 1075 Harrington Ave NE CenturyLink/Lumen to transfer facilities to new PSE pole, remove old Lumen pole, place new HH, and trench approx. 45' across Glenwood Ave NE. X XX X X 45 3/26/2021Austin Sweeney X 8 AM 3:30 PM CHANGES TO 8AM-3:30PM WORK HOURS SHALL BE APPROVED BY THE INSPECTOR Blake Costa 1/14/21approved as noted CHANGES TO 7AM-3:30PM WORK TIME SHALL BE APPROVED BY THE INSPECTOR 7AM Page 1 of 1 DETOURM4-8 M6-3 M4-8 M6-3 DETOURM4-8 M6-3 M4-8 M6-3 DETOUR SIGN SPACING = XRURAL ROADS 45/55 MPH 500' RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200' RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT-GRADE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FITROADWAY CONDITIONS. TYPE OF TCP: WORK HOURSPHASE OF WORK: ROAD CLOSURE TRAFFIC CONTROL PLAN NOTES: 1. ALL SIGNS ARE 36" - 48" ACROSS 2. ASTERIX DENOTATES X, L, OR B DISTANCES ARE NOT TO SCALE 3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS 4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN 5. FLAGGERS SHALL BE USED IN ACCORDNACE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED 6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10' 7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB NHOURS OF TCP: 8AM-5PM24 HR CONTACT:WILL HENNESSEYWILL@WAECOCONSTRUCTION.COM425-200-7352JOB NUMBER: 21095-1JOB ADDRESS: 1058 GLENWOOD AVE NEDESCRIPTION: ROAD CLOSURE DUE TOCONSTRUCTION IN ROADWAY. CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50 40 80 35/45 30 60 25/30 20 40 LANE MINIMUM TAPER LENGTH = L (FEET) WIDTH POSTED SPEED (MPH) (FEET) 25 30 35 40 45 50 10 105 150 205 270 450 500 11 115 165 225 295 495 550 12 125 180 245 320 540 600 BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (FEET) 155 200 250 305 360 425 495 570 645 730 LEGEND TRAFFIC CONES TEMP SIGN LOCATION WORK VEHICLE WORK AREA+ ROAD CLOSED TO THRU TRAFFIC R11-4 B/W SUNSET LN NEGLENWOOD AVE NE HARRINGTON AVE NE NE 10TH STDETOURM4-8 M6-3 ROAD CLOSED R11-2 B/W R11-2 B/W ROAD CLOSED 1174 1170 1162117711671161 1159 1157 11311155 1133 1125 1123 1065 CONTRACTOR TO NOTIFYPROPERTY OWNER OFTEMPORARY DRIVEWAYCLOSURE PRIOR TOCONSTRUCTION 113011321140114611481154 1157 1145 1143 1137 1135 1129 1127 1081 1100 11001124 ROAD CLOSURE SHALL NOT EXCEED 24 HOURS OR ELSE CITY COUNCIL APPROVAL SHALL BE REQUIRED. STEEL PLATES AND APPROPRIATE WARNING SIGNS SHALL BE USED OUTSIDE OF WORK HOURS. SIDEWALK ACCESS SHALL BE MAINTAINED OR PEDESTRIANS SHALL BE ASSISTED AROUND WORK ZONE OR THROUGH WORK ZONE DURING WORK HOURS. IF PEDESTRIAN IS ASSISTED THROUGH WORK ZONE, WORK SHALL PAUSE WHILE PEDESTRIAN IS ASSISTED THROUGH WORK ZONE. USE TYPE 3 BARRICADES AND PLACE ROAD CLOSED SIGN ON A BARRICADE USE TYPE 3 BARRICADES AND PLACE ROAD CLOSED SIGN ON A BARRICADE USE TYPE 3 BARRICADES AND PLACE SIGN ON A BARRICADE Page 1 of 1 DETOURM4-8 M6-3 M4-8 M6-3 DETOURM4-8 M6-3 M4-8 M6-3 DETOUR SIGN SPACING = XRURAL ROADS 45/55 MPH 500' RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200' RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT-GRADE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FITROADWAY CONDITIONS. TYPE OF TCP: WORK HOURSPHASE OF WORK: ROAD CLOSURE TRAFFIC CONTROL PLAN NOTES: 1. ALL SIGNS ARE 36" - 48" ACROSS 2. ASTERIX DENOTATES X, L, OR B DISTANCES ARE NOT TO SCALE 3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS 4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN 5. FLAGGERS SHALL BE USED IN ACCORDNACE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED 6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10' 7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB NHOURS OF TCP: 8AM-5PM24 HR CONTACT:WILL HENNESSEYWILL@WAECOCONSTRUCTION.COM425-200-7352JOB NUMBER: 21095-1JOB ADDRESS: 1058 GLENWOOD AVE NEDESCRIPTION: ROAD CLOSURE DUE TOCONSTRUCTION IN ROADWAY. CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50 40 80 35/45 30 60 25/30 20 40 LANE MINIMUM TAPER LENGTH = L (FEET) WIDTH POSTED SPEED (MPH) (FEET) 25 30 35 40 45 50 10 105 150 205 270 450 500 11 115 165 225 295 495 550 12 125 180 245 320 540 600 BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (FEET) 155 200 250 305 360 425 495 570 645 730 LEGEND TRAFFIC CONES TEMP SIGN LOCATION WORK VEHICLE WORK AREA+ ROAD CLOSED TO THRU TRAFFIC R11-4 B/W SUNSET LN NEGLENWOOD AVE NE HARRINGTON AVE NE NE 10TH STDETOURM4-8 M6-3 ROAD CLOSED R11-2 B/W R11-2 B/W ROAD CLOSED 1174 1170 11621177116711611159 1157 11311155 1133 1125 1123 1065 CONTRACTOR TO NOTIFYPROPERTY OWNER OFTEMPORARY DRIVEWAYCLOSURE PRIOR TOCONSTRUCTION 113011321140114611481154 1157 1145 1143 1137 1135 1129 1127 1081 1100 11001124 GLENNWOOD AVE NESUNSET LN NE PUBLIC ALLEY FEED PRI11#2ACSR#2ACSRABCN 1130 TO BE RELOCATED SW#:T83987 FUSE @ 100T NEW 1123 1131 FUT: 1-4" "A" "B" 16' NEW 45' 1" = 20' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 253.395.6850 07.22.20 A.M. PAULSEN 206.437.9150 07.22.20 ... A.M. PAULSEN 206.437.9150 07.22.20 REDT # ( RW-118748 )CITY OF RENTON SUNSET OAKS SCHEDULE 73 OH-UG CONVERSION 1073 HARRINGTON AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A N/A N/A 101128849 NOTED 3 OF 4 KING N/A N/A QCSOKE 09NW-T23N-R05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 COMCAST BILL WALKER 253.288.7538 CENTURYLINK KENNETH LUU 206 346.0144 RIGHT OF WAY VALERIE CONNELL 425.462.3518 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-11 5.23.19 188 197 230 0 0 0 188 197 230 ... ... ... CIRCUIT FEET REMOVED: 230' CIRCUIT FEET ADDED: 445' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DEVELOPER TO COORDINATE WITH PSEPROJECT MANGER & SERVICE PROVIDERPRIOR TO EXCAVATING WITHIN 3' OFLOCATE MARKS OF PSE ENERGIZED FACILITIES 101128849SITE NOTES AT P01 (318579-166656) 1959 45'- CL 3 TRANSFER EX. 25kVA OH TRANSFORMER TO P1A TRANSFER "1123" EX. OH SVC TPX TO P1A TRANSFER "1130" EX. OH SVC TPX TO P1A TRANSFER "1131" EX. OH SVC TPX TO P1A REMOVE EX. POLE AND ALL PSE FACILITIES COORDINATE EX. ST.LIGHT SLAT 3153 REMOVAL/TRANSFER WITH POLE SVC. INSTALL E-MARKER E01 IN SPARE 2" CONDUIT END AT BASE AT P1A (NEW) INSTALL 45' CL3 POLE (DEVELOPER TO STAKE) (PD453) 6010.1000 INSTALL 3Ø PRIMARY NEUTRAL DEADEND (DEP312) 6033.3040 INSTALL 3Ø TERM (TSU3L1F) 6043.1001 INSTALL STIRRUP (MID: 2254100) 6099.9999 INSTALL "H" CONNECTOR (MID: 2167000) INSTALL (3) 100T FUSES (MID: 3412700) INSTALL SWITCH NUMBER T83987 INSTALL 4” PRIMARY RISER ON NEW STAND OFF BRACKET (RIS4CSS) 6042.1000 INSTALL 7/16" PRIMARY NEUTRAL DOWN GUY (GYD7SAN) 6013.0100 (S) INSTALL 10" SINGLE HELIX ANCHOR (ANDH1) 6012.1000 ± 17 FT LEAD (S) INSTALL NEW GRID (318583-166654) AT P02 (318560-166652) 2017 45'- CL3 REMOVE EX. DOWN GUY AND ANCHOR AT J01 (NEW) (318579-166654) INSTALL JBOX15L ALL OTHER ITEMS RELATIVE TO JB0X15L TO BE INSTALLED WITH PLAT AT J02 (EXISTING) (318557-166662) INSTALL 3Ø 1/0 AL JKT USING ELB10J SPAN NOTES P1A TO P01 REMOVE ± 435' #2 ACSR OH PRIMARY WIRE; REMOVED ( ') #2 ACSR P01 TO P02 REMOVE ± 840' #2 ACSR OH PRIMARY WIRE; REMOVED ( ') #2 ACSR POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS REMARKS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER (ADDITIONAL INFORMATION)GRID # HEIGHT CLASS YEAR TOPPED RMVD P01 318579-166656 45 CL3 1959 SLAT3153 CENTURYLINK, COMCAST POLE TABLE (NEW) Site# Pole Data Grid #Height Class Year Remarks / Location Ref. P1A 318583-166654 45 3 2020 PSE Equip # CROSSING CONDUIT TABLE X-ING# LOCATION POWER XINGLENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 "A" "B" 4 SCH 80 2 25 PRIMARY 4" SCH 80 PVC = 50 FT 4" PVC PLUG /CAPS = 4 NOT TO SCALE ANCHOR DETAIL - SINGLE HELIX 6" to 12"Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix TYPICAL AUGERED WORK SITE - 0150.3200 TECHNIQUES FOR EROSION AND SEDIMENT CONTROL NOT TO SCALE TYPICAL POLE WITH RISER DETAIL Schedule 80 Bend Ground Line 10' (Overall)Schedule 80Conduit8'Min. 20'DB 120Conduit 36" Primary24" Secondary Note: Schedule 80 conduit shallextend a minimum of 8' aboveand 12" below ground line. Ground Line Common Neutral 6" Minimum above common neutral.even with the common neutral for secondary. 12 13 10 11 3 5"Min. 5 6 7 1 4 2 CL ClimbingSpace ClimbingSpace Direction of Vehicular Traffic 5" Min. Conduit Conduit Clamp Standoff Bracket15" Min Length Field FaceQuadrantRoad FaceQuadrant PLACE PEA GRAVEL BAGS (MID 9995892) FOR SEDIMENT TRAP PLACE STRAW MULCH ON DISTURBED AREA AUGERED HOLE POLE DITCH OR SENSITIVE AREA Cables should enter the vault so that all ofthe cables will lay in the same direction. Top View, 12 kV Cable Routing 24" MinSeparation Telephone 2-4"Cable TV 2-4"Primary Power 4"Gas 12" MinSeparation NOTE: Install 12" shading if the backfill contains rocksgreater than 10" dia. 48" Max 36" Min Cover 24" MinFinal Grade ROADSIDE Excavated Dirt Pile NOT TO SCALE TRENCH EXCAVATION DETAIL 12" 48" Typical (Power, Gas, andCommunications) Over Power Conduits6" Min Sand Cover 4" (When Present) (When Present) J- BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN 4'-0" 1'-0" 5'-8" 8" 7'-0" Tubes for 1"adjustable bolts ( 4) Cover2,490 lbs Top Section1,835 lbs Base4,760 lbs 4'-8" (2) 3' SquareAnti-Skid Doors SIDE VIEW TOP VIEW 9'-0" 11'-0" 2" 6'-0"6"CrushedRock VAULT & EXCAVATION DETAIL - J01 Excavation - 24 cubic yards NOT TO SCALE 4" New pole at site: Grid Number:kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P1A318583-16665425kVA Removed at site:Grid Number:kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01318579-16665625kVA ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 253.234.6558 8/19/20 NO.DATE REMARKISSUE DATE:DRAWN BY:CHECKED BY:Sunset CrestTownhomesGlennwood Ave,Renton, WA. ... ... ... ... ... ... ..12.19.18MBPAPPUD SUBMITTALSHEET NO:SHEET TITLE:177 Western Avenue West Suite 266Seattle, WA 98119coterra321 3rd Ave South, Suite 406Seattle, Washington 98104ph 206.596.7115coterraengineering.comENGINEERING PLLCIN COMPLIANCE WITH CITY OF RENTON STANDARDScoterra321 3rd Ave South, Suite 406Seattle, Washington 98104ph 206.596.7115coterraengineering.comENGINEERING PLLC DEVELOPMENT ENGINEERINGMSippo 06/16/2020