HomeMy WebLinkAboutCO 2CAG-20-101 Amendment 1 DES Energy Program COP -FA Coversheet Change Order 2 Client Name Project Number COP/FA Number Project Title Date City of Renton Renton City Hall Phase 2 4/1 /2021 Construction Boiler Room Drain - Waste Line $ 9,469.00 Subtotal $ 9,46900 Bond 1.10% $ 104.16 Subtotal $ 9,573.16 Sales Tax 10.10% $ 966.89 Construction Subtotal $ 10,540.05 Professional Services Percent M&V $ _ Design 8.0% $ 757.52 CM 6.0% $ 568.14 OH&P 18.0% $ 1,704.42 Subtotal $ 3,030.08 Sales Tax 10.10% $ 306.04 PS Subtotal $ 3,336.12 Total Cost of Change Use contingency funds 711 $ 13,876.17 Use additional owner funds Acknowledgement of Total Cost of Chanae Client ESCO Energy Project Manager Dave RobinaughsV m Dal 4/6/21 04/08/2021 t— tn W 7 O W 0_ J Q N O a O tY a Washington State Department & Enterprise Services FACILITIES DIVISION City of Renton CONTRACT 2018-027 H ENGINEERING & ARCHITECTURAL SERVICES (E&AS) CLIENT NO. 2-1 ENERGY CONTRACT CHANGE ORDER PROPOSAL (COP) Renton Ci Hall Phase 2 _ COP NO. 2 PROJECT TITLE TO: McKinstry Essention, LLC (ESCO) PROPOSAL REQUEST DATE: 4/1/2021 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to: It was discovered during the design phase that the boiler room does not have an existing waste line and is required for construction. A new waste line was not included in the ESP GMAX scope but is required to provide a code -compliant boiler room. REASON FOR CHANGED) DESIGN ERRORS O DESIGN OMMISSIONS O AGENCY O LATENT CONDITIONS (9) CODE REQUIREMENTS Q VALUE ENGINEERING EXPLANATION: Existing code issue DATE PROPOSAL REQUIRED: 3/28/2021 (14 days from Request Date, unless other date agreed to) CHANGE ORIGINATED BY: McKinstry PROPOSAL REQUESTED BY: TO: McKinstry Essention, LLC (ESCO) TO: Doug Kilpatrick PM (E&AS) WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE -JEl INCREASE N C # ❑ DECREASE O tr a CONTRACT TIME: Nine thousand, Five Hundred, Seventy Three OF Dollars and 16/100 (WASHINGTON STATE SALES TAX NOT INCLUDED) $ 9,573.16 NO CHANGE ❑ INCREASE OF 0 CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the Department of Enterprise Services. McKinst Essention LLC_ DaveRobinauph:V= p„M 4/6/21 ESCO SIGNATURE DATE TO: The Department of Enterprise Services' Authorizing Signator We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. Dave Robinaugh 4/6/21 ESCO DATE E&AS COST VERIFICATION DATE j4Z kv 2-1 04i08i2021 _ CLIEN DATE &A WO MANAGER DATE FORM DES-EA-099 (Revised 1/25/2013) Subcontractor Cost Breakdown Client Name Project Number COP/FA Number Project Title Name of Subcontractor City of Renton - 2 2- 20 enton Ity a DATE 4/1/2021 Short Description Material Cost Labor Cost Cost Trade PM Plumbing/Pipefitter Material (2" drain pipe for riser and run; 4" drain Subtotal Quantity Cost er unit $ $ 1 $ 2,133.00 $ - is Subtotal $ $ $ 2,133.00 $ _ 2,133.00 Labor Hours 2.0 $ 43.0 $ $ $ Hour Rate 136.00 164.00 $ $ $ $ $ Subtotal 272.00 7,052.00 - _ 7,32400 $ $ $ $ 272.00 7,052.00 2,133 00 $ 9,457.00 Total Cost $ $ 9,457 00 Renton City Hall — Boiler room, Computer Room & Generator Exhaust Projects R1 We have a full-time safety team dedicated to preventing loss and maintaining a safe and healthy work environment. Our project team will fully implement our safety program on this project. PRICING Alternate # 1- Installation of below floor waste line add $9,457 Payment is due in full upon substantial completion. This proposal is valid for 45 days from the date proposed. Upon your favorable review, please sign and return this proposal for scheduling and implementation. Should you have any questions or require additional information, please feel free to call me at 206-258-1411. Sincerely, McKinstry Co., I.I.C. Christian Castillo NN Sales Engineer ChristianC@mckinstry.com P:206-832-8517 c:206-258-1411 ACCEPTED BY McKinstry Essention Dave Robinaugh & I I . &A� CONFIDENTIAL & PROPRIETARY 071 tinsRENTON CITY HALL— BOILER ROOM, COMPUTER ROOM & GENERATOR EXHAUST PROJECTS RI Ifs of lbur it /d/ag Is