Loading...
HomeMy WebLinkAboutCO 3CAG-20-101 Amendment 1 DES Energy Program COP -FA Coversheet Change Order 3 Client Name Project Number COP/FA Number Project Title Date City of Renton Renton City Hall Phase 2 4/1 /2021 Construction Cost Delta for Fuel Storage Tank Size Increase $ 5,475.00 Subtotal $ 5,475.00 Bond 1.10% $ 60.23 Subtotal $ 5,535.23 Sales Tax 10.10% $ 559.06 Construction Subtotal $ 6,094.28 Professional Services Percent M&V $ Design 8 0% CM 6.0% $ 328.50 OH&P 18.0% $ 985.50 Subtotal $ 1,314.00 Sales Tax 10.10% $ 132.71 PS Subtotal $ 1,446.71 Total Cost of Change Use contingency funds 0 $ 7,541.00 Use additional owner funds Acknowledgement of Total Cost of Cha Client ESCO Energy Project Manager Dave Robina+ u9ha.�. ,ae: pui a m �e u wmm �G a Date V12 4/6/21 04/08/2021 U) w a w J Q N O a O o: a Aft Washington State Department of Enterprise Services FACILITIES DIVISION City of Renton CONTRACT 2018-027 H ENGINEERING & ARCHITECTURAL SERVICES (EBAS) CLIENT NO. (2-1) ENERGY CONTRACT CHANGE ORDER PROPOSAL (COP) Renton City Hall Phase 2 COP No. 3 R PROJECT TITLE TO: McKinstry Essention, LLC (ESCO) PROPOSAL REQUEST DATE: 4/1/2021 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to: Pricing during GMAX for the Generator Fuel Storage Tank was based on 1000 gallon spec and was increased to 1500 Gallon during Design. Cost is the delta for the increase in material cost REASON FOR CHANGEC) DESIGN ERRORS Q DESIGN OMMISSIONS Q AGENCY Q LATENT CONDITIONS Q CODE REQUIREMENTS Q VALUE ENGINEERING EXPLANATION: Fuel storage tank size increase DATE PROPOSAL REQUIRED: 3/28/2021 (14 days from Request Date, unless other date agreed to) CHANGE ORIGINATED BY: _ McKinstry PROPOSAL REQUESTED BY: TO: McKinstry Essention, LLC (ESCO) TO: Doug Kilpatrick _ PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE Q Q INCREASE to a # ❑ DECREASE O it a W 21 CONTRACT TIME: OF Five thousand, Five Hundred Thirty Five Dollars and 23110$ 5,535.23 (WASHINGTON STATE SALES TAX NOT INCLUDED) El NO CHANGE ❑ INCREASE OF 0 CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the Department of Enterprise Services. ncrn .qn.a ay a.. nee:..u,n Dave Robinaugh a���'C„.� „;� , McKinstry Essention, LLC BY �x+.aoeieumearar 4/6/2021 ESCO SIGNATURE nATF TO: The Department of Enterprise Services' Authorizing Signator We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. t4,le, qNh6n A.CII..,. Dave Robinaugh�,°w„ 4/6/2021 -61-IENTgr�474p�6 -Yl2eAl DATE E&AS COST VERIFICATION DATE 04/08/2021 E SJ '�T MANAGER DATE FORM DES-EA-099 (Revised 1/25/2013) Subcontractor Cost Breakdown Client Name Project Number COP/FA Number Project Title Name of Subcontractor Ci of Renton 20 asement Improvements DATE 4/1/2021 Ace Tank & Fueling Equipment 19111 Des Moines Memorial DriveWA-46-2ank Suite H z Phoe Seatac, 00 98148 WanIELItGEatnautBJr Fax: 8 84752141880 kmvahvesoluhms . Ex6aordiwyResulls Fax: 888--8 OLD TO SHIP TO McKinstry Company 5005 3rd Avenue South Seattle, WA 98134 SALES QUOTATION ORDER: 7811711 DATE: 02/16/2021 EXPIRES: ACCOUNT. 407498 CONTACT: Scott Woodfield PHONE: 206-832-8293 PAGE: 1 of 2 City of Renton, City Hall 1055 South Grady Way Renton, WA 98057 CUSTOMER PO TERMS ENTERED BY 2008-03-02 City of Renton -City Hall Diesel Fuel Sy Net 55 Days Jay Peterson L ITEMS DESCRIPTION QTY NET PRICE EXT PRICE ABOVEGROUND STORAGE TANKS 2 0150002GX 1,500 Gallon Double Wall Tank, U12085 Fireguard 1 EA $17,275.00 $17.275 00 COMMENT Return Policy: These items are non-retumable and non-refundable. 1500 Gallon Rectangular Fireguard Tank on Channel Supports, UL2085 Primary Dims: 122" Long x 60" Wide x 48" Tall Secondary O/S Dims: 128.27" Long x 72.5" Wide x 58.25" Tall COMMENT Overall Width and Height Includes the Channel Support Base Primary Fittings: 1 ea-6" FPT for E-Vent, 6ea - 4" FPT & 6ea 2" FPT Secondary Fittings: lea-6" FPT for E-Vent, 1ea - 2" FPT for Monitor Cxienor t�oaang: %ivb tsiast, 1 ct Shop Primer, 1 ct White Polyurethane 3 STEEL12 Price Of Steel Remains In Flux. 1 EA $5,475.00 $5,475.00 —PRICE INCREASE ON TANK SINCE AUGUST OF LAST YEAR"" — DAYY TANK, PUMP AND CONTROLS_ 42 FSDT00120U2Q2- 120 Gallon UL-142 Double Wall Day Tank Package (See Specifications 1 EA $25,000.00 $25.000.00 CUSTOM Below) PLC Based Controls (pre -wired to return pump w/ 7" Touch Screen and Modbus RTU interface COMMENT. Remote control of Duplex Supply Pumps by main tank, wired for 208 VAC single phase Return Pump w/ siphon break, 20 gpm w/ 1-1/2 HP TEFC motor wired for 208 VAC single phase operation Control of suction line solenoid valve. 44 FSPSC-DP8-208-1 8 GPM Duplex Pump Set Inch Cabinet With Flow Switches Valves And 1 EA $15,500.00 $15,500.00 Pressure Switches COMMENT: Return Policy: These items are non -returnable and non-refundable. ' STARTUP 52 ACE FIELD Ace Tank Service Labor Field 1 EA $1,850.00 $1,850.00 SERVICE LABOR FUEL POLISHER 62 FTI-10A Automated Stored Diesel Fuel Maintenance System 1 EA $22,295.00 $22,295.00 1/2