DEMOLITION PERMIT APPLICATION
INSTRUCTIONS:
Application must be filled out completely and signed in order to be submitted for review and acceptance. This application is good for one (1) year
from the application acceptance date. A one –time extension of one (1) year can be requested at a cost of half the plan review fee. Once issued,
the permit is good for eighteen (18)months from the issue date. A one –time extension of eighteen (18) months can be requested at a cost of
half the permit fee. Follow our Electronic File Standards when plan review is required. This application must be a .pdf and included in your
submittal.
LOCATION AND VALUATION INFORMATION
JOB ADDRESS:
PARCEL NUMBER: LOT NUMBER:
VALUE OF WORK (Fair market value
for time + materials): BOEING JOB NUMBER
(If applicable):
DESCRIPTION OF WORK TO BE
PERFORMED:
FOR OFFICE USE ONLY PERMIT #________________ PROJECT #___________________ LUA #_________________
DEMOLITION TYPE (CHOOSE FROM BELOW)
FEES (Public Works disconnection/capping fees are separate): Fees are based on the current construction valuation of the building
to be removed, refer to the current City of Renton Fee Schedule.
+ Add an Additional 5% Technology Surcharge to Calculated Fee.
SQUARE FOOTAGE OF STRUCTURE BEING DEMOLISHED? Each structure needs its own application.
WILL THE DEMOLITION INVOLVE A BUILDING GREATER THAN 4,000 SQ FT?
BUILDING INFORMATION CONTACT NUMBERS
WATER METER REMOVED OR REMAIN IN PLACE? DEVELOPMENT ENGINEERING
425-430-7240 SEWER TO BE CAPPED OR REMAIN IN PLACE?
SEPTIC SYSTEM? KING COUNTY PUBLIC HEALTH
206-477-8050 SEPTIC SYSTEM TO BE FILLED?
ELECTRICITY TO BE SHUT OFF AND METER REMOVED? PUGET SOUND ENERGY
888-225-5773
GAS TO BE SHUT OFF AND METER REMOVED? PUGET SOUND ENERGY
888-225-5773
REMOVE FUEL OR OIL TANKS? (Complete a RFA Tank
Removal Permit Application) RENTON FIRE AUTHORITY
425-430-7000
FOUNDATION DESTROYED AND REMOVED? All debris to be removed and site to be
restored to original condition.
rentonwa.gov/permitservices | permittech@rentonwa.gov | 425-430-7215 2/12/2024 | Page 2 of 3
DEMOLITION PERMIT APPLICATION
CONTRACTOR INFORMATION
DOING THE WORK AS THE HOMEOWNER. If yes, please fill out the Owner Affidavit form and include it with this
document.
A LICENSED CONTRACTOR WILL BE DOING THE WORK. Fill out the portion below.
NAME:
PHONE:
STATE OF WASHINGTON
CONTRACTOR’S LICENSE:
CITY OF RENTON
BUSINESS LICENSE:
SUBMITTAL REQUIREMENTS
You will need one application per structure. The items below are required at submittal and should follow our
Electronic File Standards.
1. A Site Plan showing where the structure being demolished is located on the site. Show tree protection and erosion
control measures taken to control any erosion or debris that may leave the property during demolition.
2. A copy of the Asbestos Abatement Report preformed by an approved asbestos remediation company.
This application does not give permission to remove any trees on the property. TREES ARE TO BE PROTECTED
DURING DEMOLITION.
OTHER THINGS TO CONSIDER
Check to see if Puget Sound Clean Air Agency requires notification prior to proceeding with demolition.
If structure to be demolished is over 4,000 sq. ft.—Environmental Checklist is required.
Construction debris is to be taken to an approved disposal facility. See King County Solid Waste for information. If you
have questions about disposing of asbestos, check with Puget Sound Clean Air Agency PCCCA regarding requirements.
The Lot is to be restored to original condition.
Please contact Renton Fire Authority astA@skcftc.org regarding their program that may demolish your structure for
their fire fighter training purposes.
CONTACT INFORMATION (This person will be the sole point of contact for this application)
NAME: PHONE:
EMAIL:
OWNER INFORMATION
NAME: PHONE:
ADDRESS:
rentonwa.gov/permitservices | permittech@rentonwa.gov | 425-430-7215 2/12/2024 | Page 3 of 3
DEMOLITION PERMIT APPLICATION
I certify that the information on this application furnished by me is true and correct and that the applicable require-
ments of the City of Renton will be met. I understand that this application is valid for one year from the application
date. If a permit is not issued during this time period, the application will become void. This application does not con-
stitute a permit to work. Work is not to commence until the building permit is posted on premises where work is to be
performed. Certification is hereby rendered that no work is to be done except as described, and that all work shall
conform to applicable codes. Work in public rights-of-way and/or utility easements are not authorized under this ap-
plication. Any work done without the benefit of having a building permit issued is subject double the permit fee. Fees
to be paid at permit intake.
APPLICANT SIGNATURE:___________________________________________________DATE:_____________________
PRINT NAME:______________________________________________________________________________________