CITY OF RENTON Ι PERMIT SERVICES
SIDE SEWER INSTALLATION
INFORMATION HANDOUT
It is the intent of the following policies, procedures and specifications to obtain satisfactory work with a minimum of
delay to all parties concerned when constructing side sewer.
DEFINITIONS
Building Side Sewer or Side Sewer means that portion of the side sewer pipe extending from the building drain to the
public sanitary sewer main.
Sewer Stub means that portion of the building side sewer between the City’s sewer main and individual property lines.
POLICIES AND PROCEDURES
1.Any work within the street right-of-way requires an additional, separate permit and bond, and work must be
performed by a licensed, bonded contractor. A traffic control plan, approved by the Transportation Division, will
be required.
2.Washington law requires anyone planning to excavate to know what is below before they dig. Besides being illegal,
digging in the blind is unsafe and could disrupt vital utilities that we ALL rely on each day. CALL 811 or complete
the process online at www.washington811.com.
3.Acceptable procedures for Side Sewer Connections to main lines:
a.Vitrified clay – Install new PVC “tee” using “strong-back” flexible Fernco couplings, or approved equal.
b.Concrete - Install new PVC “tee” using “strong-back” flexible Fernco couplings, or approved equal.
c.PVC & C900 PVC - Install new PVC “tee” using rigid couplings or a Romac saddle on an appropriately cut hole.
d.Ductile Iron – Core-drilled with a Romac saddle.
e.HDPE – Core-drilled with a Romac Saddle. “Inserta-Tee” allowed on sewer mains 12” diameter and larger.
That portion of side sewer stubs that are within the right-of-way and have less than 4 feet of cover or greater
than 15 feet of cover shall use either C900 PVC or Ductil Iron pipe. All connections to new or existing concrete
structures will be at manufactured knock-outs or the structure is to be core-drilled. Connection will be made
with a “Kor-n-Seal” boot or approved equal and be water-tight.
4.Requirements for using Existing Side Sewer Stubs:
a.Any existing side sewer stub that is less than 6” diameter shall be replaced with new 6” diameter pipe of a
type listed in the “Specifications for Building Side Sewer” section of this handout.
b.Existing Concrete and Clay side sewer stubs shall be replaced with new pipe of a type listed in the
“Specifications for Building Side Sewer” section of this handout OR may be rehabilitated (lined) with the
approval of the Wastewater Utility. Prior to approving rehabilitation (lining), the contractor shall CCTV
inspect the existing side sewer stub and submit a copy of the inspection to the Wastewater Utility which will
determine the suitability for rehabilitation (lining). If given approval to rehabilitate (line) the existing side
sewer, the contractor shall furnish a CCTV inspection of the completed rehabilitation (lining) prior to
receiving final approval of the rehabilitation. See CCTV Inspection Specifications.
5.For inspection call, 24 hours in advance, 425-430-7203. Be prepared to give Permit Number, location of
inspection, type of inspection, contact person (with phone number), and AM or PM inspection request. General
information may be obtained by calling Customer Service at 425-430-7200.
6.There will be no guarantee of re-inspection on the same day for any work which is not ready at the time of the
scheduled inspection.
rentonwa.gov/permitservices | developmentengineering@rentonwa.gov | 425-430-7240 3/2/2023 | Page 2 of 3
SIDE SEWER INSTALLATION INFORMATION HANDOUT
7.Building side sewer and sewer stubs shall be bedded in accordance with City of Renton Standard Plan 405.
8.Building side sewer and sewer stubs will be tested from the point of origin to and through the house connection by
one of the following methods:
a.Water - fill test.
b.Low Pressure Air - WSDOT Specification current edition, as adopted and amended by the City of Renton
Supplement to the Specifications.
9.In all cases where men, equipment, or material will in any way obstruct vision or inhibit normal traffic flow, an
approved Traffic Control Plan providing adequate signs and flagmen will be required to protect motorists and
pedestrians. In addition, 24 hours prior to any work being performed within the street right-of-way, Valley
Communications Center (911) shall be contacted through one of the following numbers:
Valley Communications Center (via land line telephone) 911
Valley Communications Center (via cell phone) (253) 852-2121
10.In the event street crossings must be constructed in more than one continuous operation, the Construction
Services Section will endeavor to provide an inspector during each phase of construction, so long as the
Construction Services Section is contacted 24 hours in advance via the Inspection Request Line at 425-430-7203.
11.Trenches within the right-of-way or City owned easements shall be backfilled with “Crushed Surfacing Top Course”
material (WSDOT specification 9-03.9(3)). Trenches on private property may be backfilled with native materials if
approved as suitable. If not suitable, then approved import material shall be used.
12.Restoration of street trenches shall be accomplished per the City of Renton’s adopted Trench Restoration and
Street Overlay Requirements (City of Renton Standard Plans 110, 110.1, 110.2, 111). The Utility may require that
controlled density backfill be used when crossing an arterial, newly constructed or newly reconstructed roadways.
13.For properties that were utilizing septic systems, upon completion of connection to the public sewer main, the
owner shall clean (pump-out) the septic tank and then either abandon and fill said septic tank with a suitable
material or clean said septic tank to use in connection with adjoining drain field systems for the disposal of storm
water.
SPECIFICATIONS FOR BUILDING SIDE SEWERS
The building side sewer shall be PVC plastic pipe ASTM D3034, AWWA PVC C900 pipe, ductile iron pipe class 50, or
equal, or other suitable material approved by the Utilities Engineer. If installed in filled or unstable ground, the
building side sewer shall be of ductile iron pipe with push-on rubber gasketed joints.
All joints and connections shall be installed in accordance with APWA spec. 62-3.98A. Ductile iron pipe push-on joints
shall conform to ANSI A-21.11. PVC pipe joints shall be rubber-gasketed push-on joints conforming to ASTM D 2680.
Other jointing materials and methods may be used only by written approval of the Wastewater Utility.
The size and slope of the building side sewer shall be subject to the approval of the Wastewater Utility. The standard
minimum pipe diameters and slopes are:
1.Four inches (4”) at a two percent (2%) slope (1/4” per foot) for single-family or duplex residential, or
2.Six inches (6”) at a two percent (2%) slope (1/4” per foot) for multi-family, commercial or industrial.
In no event shall the diameter of the sewer stub (that portion of the side sewer that is in the Right-of-Way of an
easement) be less than six inches (6”).
Under certain circumstances, the Wastewater Utility may allow a six inch (6”) side sewer to be laid at no less than one
percent (1%) (1/8” per foot). A grade release holding the City harmless for the flatter slope will be required.
Whenever possible, the building side sewer shall be brought to the building at an elevation below the basement floor.
rentonwa.gov/permitservices | developmentengineering@rentonwa.gov | 425-430-7240 3/2/2023 | Page 3 of 3
SIDE SEWER INSTALLATION INFORMATION HANDOUT
No building side sewer shall be laid parallel to or within three feet (3’) of any bearing wall. The depth shall be sufficient
to afford protection from frost. The building side sewer shall be laid at uniform grade and in straight alignment insofar
as possible. Changes in direction shall be made with proper fittings per City standards.
In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried
by such drain shall be lifted by an approved private lift station and discharged to the sewer stub.
All excavations required for the installation of a building side sewer shall be open trench work unless otherwise
approved by the Wastewater Utility. Pipe laying and backfill shall be performed in accordance with the City of Renton’s
Standard Specifications.
INSPECTION NOTICE
Prior to the start of construction activities, telephone:
425-430-7203
Call a minimum of 24 hours in advance of required inspections.
Inspection requests for the following workday must be received no later than midnight.
Upon dialing, you will receive a recorded message asking for your inspection request. At the tone, relay your request
including the following information:
1.Your PERMIT Number (ie SS18000000) or, in cases of City project, the Project Identification.
(Inspections will not be scheduled without proper identification).
2.Location of requested inspection. (Street Address, Street Intersection, etc.)
3.Type of inspection requested. (Concrete, earthwork, drainage, sewer, field meeting, etc.)
4.Name of person to contact and day-time phone number.
5.Approximate time of requested inspection - AM or PM. (Due to a variable workload, inspections cannot be
scheduled for specific hours. The only exception is inspections that require the scheduling of special testing
personnel, observing consultants, or other time-restraining factors approved by the Inspector in advance.
Inspections will be scheduled in the order received to the limit of available man hours.
NOTE: The ONLY exception to the 24 Hour Minimum scheduling requirement is in cases of bonafide Emergencies. In
cases of true Emergencies (broken utilities, urgent traffic control problems, etc.), telephone:
425-430-7200
and ask to speak to the assigned Inspector (by name if possible). An attempt will be made to contact the Inspector or,
if that Inspector is unavailable, to assign an Emergency Inspector to handle the problem. Note: this procedure is to be
used for real Emergencies ONLY. Your failure to adequately schedule your operations to allow for advance requests
does not constitute an Emergency!!
YOU WILL BE CHARGED FOR THE INSPECTOR’S TIME IF THE PROBLEM IS NOT AN EMERGENCY!
DocuSign Envelope ID:345B681 D-914F-4F2D-AB59-7C192D3B78A3
r<) r-1 r 7 I
EX. SEWER MAIN
I PROPERTY LINE
I r SPOOL Z
LENGTH AS NEEDED) 3' 0" MIN.
o
6" SEWER STUB n MitFUTURE 4" SIDE SEWEREiIIMI[i[oi;llic IDE 3
1 II t f \- 2'•x 4" STUD MARKING POST PAINTEDt6" CAP WHITE WITH THE WORD "SEWER" STENCILEDIlSEWERMAINTEEX6" TEE I IN 3" HIGH BLACK LETTERS AND #6 WIRE
SIDEWALK z WRAPPED AROUND THE STUD ANDii
w\ I al EXTENDED TO THE TOP OF THE STUD.
I i ` COUPLING (TYP.) L_J L J : Qt.J
13 6"X6" X6" SURFACE CLEANOUT WITH CAST IRON RING AND COVER
EAST JORDAN IRON WORKS PRODUCT NO. 00367502 ORIrAPPROVEDEQUAL, SPECIFY "SEWER" ON LID),
o CLEANOUT TO BE CENTERED IN A 2'x2' CONCRETE PAO.
III CONCRETE PAD TO BE 8" IN DEPTH.
1rT
T-J r T
BEND AS 8'
REQUIRED
EXISTING SANITARY
SEWER MAIN 2 0% MIN. SLOPE
FUTURE 4" SIDE SEWER
6" SEWER STUB 6"X6"X6" WYE FUTURE 6"x 4" REDUCER
SEWER MAIN SIZE X 6" TEE
ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO EXISTING SEWER MAIN
A. VITRIFIED CLAY MAIN - CUT IN A NEW PVC "TEE" USING "STRONG-BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL).
B. CONCRETE MAIN - CUT IN A NEW PVC "TEE" USING "STRONG-BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL).
C. PVC & C900 PVC MAIN - CUT IN NEW TEE USING RIGID COUPLINGS OR CORE-DRILLED WITH A ROMAC SADDLE
OR APPROVED EQUAL).
D. DUCTILE IRON MAIN - CORE-DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL)
E. LINED MAIN - CONNECTION TO SEWER MAINS THAT HAVE BEEN LINED (CIPP, ETC.); CUT IN A NEW PVC "TEE" USING
STRONG-BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL).
F. HDPE - CORE-DRILLED WITH A ROMAC SADDLE. "INSERTA-TEE" MAY BE USED ON SEWER MAINS 12" DIAMETER OR LARGER.
G. MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK-OUTS OR THE STRUCTURE
SHALL BE CORE-DRILLED AND USE KOR-N-SEAL BOOTS OR APPROVED EQUAL.
NOTES:
1. PRIOR TO INSTALLATION OF A SANITARY SEWER STUB, A SIDE SEWER STUB PERMIT MUST BE PURCHASED FROM THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT.
2. UNLESS OTHERWISE SHOWN ON PLAN. SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY LINE OR 3-5' LOWER
THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
3. SIDE SEWERS SHALL HAVE A MINIMUM 2 % SLOPE UNLESS APPROVED BY THE PUBLIC WORKS INSPECTOR.
4. FOR INSPECTION OF THE SIDE SEWER STUB, CALL 24 HOURS IN ADVANCE. THE INSPECTION PHONE NUMBER IS ON THE SIDE
SEWER STUB PERMIT. SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE ON SITE WHEN INSPECTOR ARRIVES AT
THE APPOINTED TIME. DO NOT BACKFILL THE TRENCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR.
5. ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110.2.
6. THE SIDE SEWER STUB SHALL HAVE PIPE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405.
7. ALL SIDE SEWER STUBS SHALL BE INSTALLED BY A CONTRACTOR LICENSED AND BONDED IN THE STATE OF WASHINGTON.
V °<SIDE SEWER STUB STD.PLAN-4016.1
PUBLIC WORKS j INSTALLATION
AP t$g°'
DEPARTMENT Martin Pastuch '26/202c 1 12:
SEWER MAIN TO PROPERTY LINE) nw.8BAS$3F098B4490_
Pubic WorY.AAmini,tr.br DATE
DocuSign Envelope ID:345B681 D-914F-4F2D-AB59-7C192D3B78A3
ALL 90' TURNS SHALL BE ACCOMPLISHED—
BY MEANS OF A WYE WITH CLEANOUT AND
4" BEND AS REQUIRED (NO GREATER 45' BEND. TWO 45'BENDS SHALL NOT BE
THAN 45'BEND). EVERY 2ND CHANGE 4" CLEANOUT WYE WITH ACCEPTABLE. (SEE NOTE 11)
IN DIRECTION OR GRADE WILL REQUIRE 45' BEND AND PLUG.
1 A CLEANOUT WYE. (SEE NOTE 11) I (SEE NOTE 11) I I Q
W La W 3
z. z• z'
H N
HOUSE I HOUSE al0
HOUSE
ce0l HOUSE
z z rig' za. a. a.
i --3-0" MIN.
IIII4" SEWER PIPE
SURFACE CLEANOUT 4" SURFACE v (TYPICAL)
6"x 6"x6" WYE a
CLEANOUT 4" SEWER PIPE, SEE NOTES 2
SEE STD PLAN - 407) WYE 4" TEST TEE WITH AND 3. MINIMUM UNE SIZE FOR
4" WYE WITH II PLUG FACE UP II OTHER THAN SINGLE FAMILY IS 6"
II R.O.W. LINE CLEANOUT _La I ; R.O.W. UNE
3' MIN. to lO ioTYPICAL)
o 06"x 4" REDUCER 0
F1 fFrl H TYPICAL) F
WR
cn
MAIN SEWER LINE w 0 w w
NOTES:
z IF THE BUILDING SEWER SERVES ANY FIXTURE HAVING
a FLOOD LEVEL RIMS LOCATED BELOW THE ELEVATION 1. PRIOR TO INSTALLATION OF A SANITARY SEWER CONNECTION, A
OF THE NEXT UPSTREAM MANHOLE COVER OF THE SIDE-SEWER PERMIT MUST BE PURCHASED FROM THE CITY OF
o PUBLIC SEWER SYSTEM, A BACKFLOW PREVENTION RENTON PUBLIC WORKS DEPARTMENT,
b z DEVICE SUCH AS CLEAN CHECK EXTENDABLE
I a BACKWATER VALVE OR APPROVED EQUAL SHALL BE111INSTALLED. 2. FOR INSPECTION OF SIDE SEWER, CALL 24 HOURS IN ADVANCE.
m THE INSPECTION PHONE NUMBER IS ON THE SIDE SEWER PERMIT.
4" FLEXIBLE COUPLING (FERNCO OR EQUAL) SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE
z z ON SITE WHEN INSPECTOR ARRIVES AT APPOINTED TIME. DO NOT
o ' BACKFILL THE DITCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR.
LLJ SURFACE CLEANOUT
m 4"x 4"x4" WYE 3. SIDE SEWER PIPE AND FITTINGS SHALL BE PVC SDR 35 WITH RUBBER
4" PIPING GASKET JOINTS UNLESS OTHERWISE APPROVED BY THE PUBLIC
WORKS DEPARTMENT.PLAN
BUILDING DRAIN FOR 4. A MINIMUM GRADE OF 2% (1/4" PER FOOT) MUST BE MAINTAINEDLOWELEVATIONHOUSE
WITH A 4" PIPE. IN THE EVENT A 2% GRADE CANNOT BE MAINTAINED.
WITH THE APPROVAL OF THE PUBLIC WORKS INSPECTOR, THE
MAIN TO 5 FEET CONTRACTOR MAY INSTALL A 6' DIAMETER SIDE SEWER AT NO LESS
R.O.W. LINE R.O.W. LINE TO CLEANOUT MAX THAN 1x
SIDE SEWER BUILDING SEWER BUILDING 5. INSTALL SIDE SEWER WIN 2' MINIMUM COVER. 18" COVER IS ALLOWEDSTUB
3 FEET MIN. --
DRAIN
AT THE HOUSE IF OUTLET IS SHALLOW.
I/-. 110_3 6. ALL BUILDING SEWER AND SIDE SEWERS SHALL HAVE BEDDING IN
ACCORDANCE WITH STANDARD PLAN 405.
VI0 co m aof ((( o) O4` A
NA A• AL-J m ' rNmi< ' c x >x • 0)x,o m 7. WHENEVER FEASIBLE, THERE SHALL BE A MINIMUM 5 FOOT
zom o v y n ? mi
At v F x> o m O HORIZONTAL SEPARATION BETWEEN SANITARY SIDE SEWERS AND ALL
MO 0 o mm o •A- c-x z o •.- pm OTHER UTILITIES.
rn2 „O_,
rn
UIn Z p m >> G) Z 0 0m 'aznmm 8. SIDE SEWER TESTING SHALL CONSIST OF PLACING A PLUG IN THEgzw8am0 > > Q el TEST TEE AND INSTALLING A 4-FOOT RISER PIPE ON THE CLEANOUT
I Io z
m- c > AT THE BUILDING. THE SIDE SEWER PIPE SHALL BE FILLED TO WITH
m
1
m - '-g y C m i ,,Z WATER TO THE TOP OF THE RISER PIPE. NO LOSS OF WATER SHALL
rnm I a, m mm 0 OCCUR FOR A PERIOD OF 10 MINUTES. THE SIDE SEWER MAY BE
x' zz c CONNECTED TO THE BUILDING FOLLOWING THE SUCCESSFULo
rn m COMPLETION OF THE LEAK TEST.
O1 o 9. THE CLEANOUT AT THE RIGHT-OF-WAY SHALL BE INSTALLED PER
mPLAN STANDARD PLAN 406.1. THE CLEANOUT AT THE BUILDING SHALL BE
BUILDING SEWER INSTALLED TO SURFACE GRADE. ALL OTHER CLEANOUTS SHALL BE
INSTALLATION INSTALLED TO WITHIN 12" OF THE SURFACE.
10. IF SIDE SEWER STUB IS NOT AVAILABLE. THE OWNER SHALL BE
RESPONSIBLE FOR ITS INSTALLATION PER STANDARD PLAN 406.1.
ALL WORK WITHIN STREET RIGHT-OF-WAY SHALL BE DONE BY A
LICENSED AND BONDED CONTRACTOR.
CALL 811 BEFORE YOU DIG 11. ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC
or go to RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110.2.
www.callbeforeyoudig.org 12. ALL WORK SHALL BE ACCOMPUSHED IN ACCORDANCE WITH THE
WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT (WISHA).
TYPICAL BUILDING SEWER STaD:PLAN-406.2
PUBLIC WORKS
FROM PROPERTY LINE TO 26/2020 I 12:1 DEPARTMENT Martin PastucliW
F-R't U" BUILDING CONNECTION eB049 1FD98B449D...
Public Work"kdmlohtntor DATE
1 DocuSign Envelope ID:345B681D-914F-4F2D-AB59-7C192D3B78A3
RECESSED Not to Scale
LIFT POCKETrolli FRAME
3/4" LETTERING "SEWER" D DIAMETER 1 -D
o U o Ir
O 11 SEWER Q 2) BOLT SOC. (ALLEN HEAD) 1iiiiii•y5/8" - 11 X 1.5 STAINLESS V
o::o o/7 STEEL
REF. PART #00981177 IA
um 1-3/16"
ellikkriSEE
NOTE 3
10-1/2"
5/8" EXPANDABLE
SAND OR
FOAM
1/q„I ----12-1/2"
2-1/4"BOLT DETAIL
45' (1/8) BEND
14"
I" 12-3/4"I IF1-1/8"
8"P
1_1- 11" k,
12-1/4" c,
OJ
CAST IRON RING AND COVER P PIPE MATERIAL AS SPECIFIED
G,/ BY THE ENGINEER
45- (1/8) BEND
NOTES:
1. 8" AND 6" CLEAN-OUT RINGS AND COVERS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC.
No. 3698 (PRODUCT NO. 00369803) OR APPROVED EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY.
2. IN UNIMPROVED AREAS, POUR A 8" THICK, 3'-0" SQUARE
CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER.
3. INSTALL ASPHALT COLLAR PER STANDARD PLAN 106.
sv De STD. PLAN-403.1
PUBLIC WORKS 8" OR 6" CLEANOUT 7a* pnetlby -
DEPARTMENT
1 FOR SANITARY SEWER MAIN Martin Pastuci a/26/2020 112:FNtor
IR=Pg49D... DATE
DocuSign Envelope ID:345B681 D-914F-4F2D-AB59-7C192D3B78A3
rW (SEE NOTE 7) LIMITS OF PIPE ZONE
6"
BEDDING MATERIAL FORa
SANITARY SEWER PIPE O.D.
SEE NOTE 5)
of
PIPE
FOUNDATION LEVEL
6"
BEDDING FOR SANITARY SEWER PIPE
NOTES:
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY
OVER PIPE. HAND TAMP ONLY.
4. PIPE INSTALLATION SHALL BE PER SECTION 7-08 OF THE
STANDARD SPECIFICATIONS.
5. PIPE ZONE MATERIAL SHALL BE PER SECTION 9-03.12(3)
OF THE STANDARD SPECIFICATIONS.
6. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW
LINE IS MAINTAINED.
7. TRENCH WIDTH SHALL BE PER SECTION 2-09.4 OF THE
STANDARD SPECIFICATIONS.
STD. PLAN—405
PUBLIC WORKS PIPE BEDDING APP ---41'
1 DEPARTMENT FOR SANITARY SEWERS Martin Pastucfa/26/2o2o I 12:
4 ifH1° 8B®467 FD98B449D...
vueuc won nomim.v.w DATE