Loading...
HomeMy WebLinkAbout20160674E003 Bethany Corner 2021-05-04 TESC 014.pdfCONSTRUCTION ENTRANCE: SITE RESTRICTED ACCESS: WHEEL WASH: SEDIMENT TRACK OUT: ROADWAY SURFACE: CATCH BASIN: LIMITS: BUFFER AREA STABILIZATION SILT FENCING CONCRETE WORK: (sidewalks, curbing, foundation) COVER MEASURES OVERALL: STRAW: PLASTIC SHEETING: HYDROSEED: CONVEYENCE CHANNEL: CHECK DAMS: STOCKPILE COVER: PIPE SLOPE DRAINS: LEVEL SPREADER: LANDSCAPING/MULCH: SEDIMENT POND TRAP: SEDIMENT POND INLET/OUTLET: SEDIMENT POND SIDE SLOPES: SURFACE WATER OBSERVATION: (creek, wetland, or lake) (clear, turbid, sheen) WATER QUALITY SAMPLE: TURBIDITY (NTU) CORRECTIVE ACTIONS: SAMPLE LOCATION pH: OVERALL: CONFIRMATIONS OF PAST CORRECTIONS: AREAS OF CONCERN: TEMPORARY EROSION AND SEDIMENT CONTROL MONITORING CSWGP: TESC REPORT NO: DATE: PREVIOUS VISIT DATE: TIME: WEATHER: PROJECT NAME: PROJECT LOCATION: AESI PROJECT NO: CLIENT NAME: CITY: MUNICIPALITY: AESI PROJECT MANAGER: RAINFALL (inches): 24 HOURS PAST WEEK QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS) Associated Earth Sciences, Inc. 911 5TH AVE | KIRKLAND WA 98033 www.aesgeo.com This site ☐ is in compliance ☐ is not in compliance with the terms and conditions of the SWPPP and the NPDES discharge permit. v. 1/21 INSPECTOR: Josh Greer DATE: AESI PM: DATE: I certify that this report is true, accurate and complete, to the best of my knowledge. This form to be filed in a weekly site logbook and copies sent to the contractor and client manager. ADDITIONAL COMMENTS: SAMPLE LOCATION APPROXIMATE FLOW TURBIDITY NTU/ TRANSPARENCY PH COMPLIANCE DATE: CSWGP: AESI PROJECT NO: TESC REPORT NO: TEMPORARY EROSION AND SEDIMENT CONTROL MONITORING Associated Earth Sciences, Inc. 911 5TH AVE | KIRKLAND WA 98033 www.aesgeo.com Page 2 v. 1/21