HomeMy WebLinkAboutMFP21001784.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21001784
IVR Number: 21001784
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/25/2021Application Date:3342103985Parcel Number: 2905 MOUNTAIN VIEW AVE N
Permit Type:05/11/2021Issue Date:Franchise
Permit Work Class:05/11/2022Expiration Date:Minor Utility
Job Number: 105097376Franchise Type:Electric
Description: Puget Sound Energy Electric ACTAUL ADDRESS IS 2909
CREW TO PARK IN ROW TO ACCESS P01 ON PRIVATE PROPERTY. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
REIMERS MILTON A JR+BEVERLY 2905 MOUNTAIN VIEW AVE N
RENTON , WA 98056
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105097376
2909 Mountainview Ave N
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
JENNY CHAU JENNY.CHAU@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21001784
Scott Warlick CED 5/11/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
P01
UTILITYWORK
AHEAD
W21-7
BE PREPARED
TO STOP
W20-7b
W20-7A
W20-7A
PLACE 72HRS IN ADVANCE
NO PARKINGFROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
100'
100'
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
PSE
Jenny Chau
425.873.4842
2909 Mountain View Ave N,
Renton WA
04.13.2021
OFFICE: 800-343-4049
CELL: 425-765-1153
WATCP@KNDSERVICES.NET WSTCS#011563
105097376
DESIGNED BY: CHRIS SCHALEGER
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Transit Authority
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Legend
Bucket Truck
Cones
Flagger
NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39
Pole
W20-7A Flagger Ahead
BE PREPAREDTO STOP W20-7b be prepared to stop
UTILITYWORKAHEAD W21-7 utility work ahead
NOT TO SCALE
NOTIFY EMS, FIRE
AND POLICE
72 HOURS IN ADVANCE
N
Adjust Controls as Needed
Manifest
12 x Cones
2 x W20-7A Flagger Ahead
1 x No Parking R7-T39
1 x W20-7b be prepared to stop
1 x W21-7 utility work ahead
Mountain View Ave NM
o
u
n
t
a
i
n
V
ie
w
A
v
e
N
www.invarion.com
MFP21001784
3005
3003
2931
2905 MOUNTAIN VIEW AVE N2909
GARAGE
&
OFFICE
HAZ
15
319230-166016
50 kVA 120/240V (A)
319206-166023
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
SLAS3191
319218-166019
SLAH5152#6 CUAJOB SITE
JOB SITE
4' X 4' WORK PITCUSTOMER SUPPLIED
4' X 4' WORK PITCUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
PSE INST. 1-RUN 4/0 UG TPX ± 130'
CUSTOMER SUPPLIED
1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 100'
100'319206-166023
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
SLAS3191
4' X 4' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
PSE INST. 1-RUN 4/0 UG TPX ± 210'
CUSTOMER SUPPLIED
1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 180'
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
180'
R=36"
60°
R=36"
90°
319206-166023
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
SLAS3191
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.51771, -122.21058
Owner / Developer Contact Info
officeATTN:
MOUNTAINVUE LLC
9837 HILLTOP ROAD
BELLEVUE, WA 98004
FRANK GUVENC 669-264-6560
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HAZ-15
06/04/2020
188.00 224.00 208.00
3.10 0.00 0.00
191.10 224.00 208.00
Garage OH-UG SVC
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104329511510084410
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JENNY CHAU
253-234-6403
JENNY.CHAU@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'105097376THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
104329510
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
JENNY CHAU 253-234-6403 09/25/20
DANIEL ONG 360-471-3445 09/25/20
N/A N/A N/A
DANIEL ONG 360-471-3445 09/25/20
RW-119444 RENTON
MOUNTAINVIEW
NEW RES. OH TO UG SVC FOR HOUSE & GARAGE
2909 MOUNTAINVIEW AVE N, RENTON, WA 98056
N/A N/A
N/A 105097376
AS NOTED 1/1
KING N/A N/A CSPSKEPM
SE 31-24N-05E N/A N/A
2405E124 2405E124 2405E124 HAZ-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
4/8/21 M. FODE TRF REPLACEMENT
N/A N/A N/A
N/A N/A N/A
509972664
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
2.5" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
METER DETAIL @ M01 & M02
SCALE: NONE
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
TV & TEL Electric Service Cable in Conduit
3" Schedule 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND
ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M02
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
TRENCHING & CONDUIT.
-INSTALL ± 100' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM P01 TO M01
-INSTALL ± 180' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM P01 TO M02
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT
ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A
MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
NEW CABLE & CONDUIT DIAGRAM @ HOUSE
NOT TO SCALE
SITE SPECIFIC NOTES
AT P01: 319206-166023
-EXISTING 40' POLE (UNKNOWN, 1981) TO REMAIN
-REMOVE (1) EX. 25KVA TRF AND RETURN TO PSE YARD
-INSTALL (1) 37.5KVA OH TRF 120/240V W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFPXF)
-INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP AØ (MID: 2254000 & 2153100)
-INSTALL (2) 3" SECONDARY RISER ON EXISTING STANDOFF BRACKETS PER STD 6042.1000
(RIS3CSS) ± 30' ___' ACTUAL
-CREW TO PARK ON PRIVATE PROPERTY TO DO THE WORK
M01 AT HOUSE: NEW PERM METER BASE
-POTELCO TO INSTALL 320A METER
M02 AT GARAGE: NEW PERM METER BASE
-POTELCO TO INSTALL 200A METER
-CUSTOMER IS REQUIRED TO SUPPLY & INSTALL PHENOLIC LABEL ON METER BASE PRIOR TO
SERVICE CONNECTION "2909 MOUNTAINVIEW AVE N #GARAGE"
SPAN SPECIFIC NOTES
P01 TO M01:
-INSTALL 1-RUN 4/0 UG TPX, ± 130’ ___' ACTUAL
P01 TO M02:
-INSTALL 1-RUN 4/0 UG TPX, ± 210’ ___' ACTUAL
PROJECT SCOPE:
-INSTALL OH-UG SVC AT M01
-INSTALL OH-UG SVC AT M02
CIRCUIT FEET ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
2173 SQ.
320 AMPS
GAS
8.3 KW
80A
1.0%
2.2%
00 1"2"
00 50'100'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1566 SQ.
200 AMPS
ELECTRIC
12.9 KW
80A
1.7%
2.7
NEW CABLE & CONDUIT DIAGRAM @ GARAGE
NOT TO SCALE
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE Direction of Vehicular TrafficRoad Face
Quadrant
Field Face
Quadrant
Climbing
Space
Climbing
Space
Standoff Bracket
15" Min Length
Conduit ClampConduit
5" Min
4'x4' Work Pit
LC
LC
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
OH TRF REPLACEMENT
House OH-UG SVC
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
37.5kVA 120/240v
6211300
P01
319206-166023
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319206-166023
25kVA 120/240v
105097376511157688
583066679OH MISC
MFP21001784
RESTORATION PER CITY OF RENTON STANDARDS