Loading...
HomeMy WebLinkAboutMFP21001784.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21001784 IVR Number: 21001784 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/25/2021Application Date:3342103985Parcel Number: 2905 MOUNTAIN VIEW AVE N Permit Type:05/11/2021Issue Date:Franchise Permit Work Class:05/11/2022Expiration Date:Minor Utility Job Number: 105097376Franchise Type:Electric Description: Puget Sound Energy Electric ACTAUL ADDRESS IS 2909 CREW TO PARK IN ROW TO ACCESS P01 ON PRIVATE PROPERTY. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL REIMERS MILTON A JR+BEVERLY 2905 MOUNTAIN VIEW AVE N RENTON , WA 98056 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 105097376 2909 Mountainview Ave N Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 JENNY CHAU JENNY.CHAU@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21001784 Scott Warlick CED 5/11/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P01 UTILITYWORK AHEAD W21-7 BE PREPARED TO STOP W20-7b W20-7A W20-7A PLACE 72HRS IN ADVANCE NO PARKINGFROM TO TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 100' 100' CUSTOMER: CONTACT: LOCATION: DATE:W/O # PSE Jenny Chau 425.873.4842 2909 Mountain View Ave N, Renton WA 04.13.2021 OFFICE: 800-343-4049 CELL: 425-765-1153 WATCP@KNDSERVICES.NET WSTCS#011563 105097376 DESIGNED BY: CHRIS SCHALEGER PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 11' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Legend Bucket Truck Cones Flagger NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39 Pole W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop UTILITYWORKAHEAD W21-7 utility work ahead NOT TO SCALE NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE N Adjust Controls as Needed Manifest 12 x Cones 2 x W20-7A Flagger Ahead 1 x No Parking R7-T39 1 x W20-7b be prepared to stop 1 x W21-7 utility work ahead Mountain View Ave NM o u n t a i n V ie w A v e N www.invarion.com MFP21001784 3005 3003 2931 2905 MOUNTAIN VIEW AVE N2909 GARAGE & OFFICE HAZ 15 319230-166016 50 kVA 120/240V (A) 319206-166023 25 kVA 120/240V (A) 37.5 kVA 120/240V (A) SLAS3191 319218-166019 SLAH5152#6 CUAJOB SITE JOB SITE 4' X 4' WORK PITCUSTOMER SUPPLIED 4' X 4' WORK PITCUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED PSE INST. 1-RUN 4/0 UG TPX ± 130' CUSTOMER SUPPLIED 1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 100' 100'319206-166023 25 kVA 120/240V (A) 37.5 kVA 120/240V (A) SLAS3191 4' X 4' WORK PIT CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED PSE INST. 1-RUN 4/0 UG TPX ± 210' CUSTOMER SUPPLIED 1-3" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 180' 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED 180' R=36" 60° R=36" 90° 319206-166023 25 kVA 120/240V (A) 37.5 kVA 120/240V (A) SLAS3191 SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.51771, -122.21058 Owner / Developer Contact Info officeATTN: MOUNTAINVUE LLC 9837 HILLTOP ROAD BELLEVUE, WA 98004 FRANK GUVENC 669-264-6560 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HAZ-15 06/04/2020 188.00 224.00 208.00 3.10 0.00 0.00 191.10 224.00 208.00 Garage OH-UG SVC Superior ORDER#NOTIF# PWR PROJECT PHASE 104329511510084410 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-234-6403 JENNY.CHAU@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'105097376THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 104329510 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-234-6403 09/25/20 DANIEL ONG 360-471-3445 09/25/20 N/A N/A N/A DANIEL ONG 360-471-3445 09/25/20 RW-119444 RENTON MOUNTAINVIEW NEW RES. OH TO UG SVC FOR HOUSE & GARAGE 2909 MOUNTAINVIEW AVE N, RENTON, WA 98056 N/A N/A N/A 105097376 AS NOTED 1/1 KING N/A N/A CSPSKEPM SE 31-24N-05E N/A N/A 2405E124 2405E124 2405E124 HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 4/8/21 M. FODE TRF REPLACEMENT N/A N/A N/A N/A N/A N/A 509972664 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 2.5" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr METER DETAIL @ M01 & M02 SCALE: NONE FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M02 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 TRENCHING & CONDUIT. -INSTALL ± 100' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM P01 TO M01 -INSTALL ± 180' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM P01 TO M02 -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . NEW CABLE & CONDUIT DIAGRAM @ HOUSE NOT TO SCALE SITE SPECIFIC NOTES AT P01: 319206-166023 -EXISTING 40' POLE (UNKNOWN, 1981) TO REMAIN -REMOVE (1) EX. 25KVA TRF AND RETURN TO PSE YARD -INSTALL (1) 37.5KVA OH TRF 120/240V W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFPXF) -INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP AØ (MID: 2254000 & 2153100) -INSTALL (2) 3" SECONDARY RISER ON EXISTING STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) ± 30' ___' ACTUAL -CREW TO PARK ON PRIVATE PROPERTY TO DO THE WORK M01 AT HOUSE: NEW PERM METER BASE -POTELCO TO INSTALL 320A METER M02 AT GARAGE: NEW PERM METER BASE -POTELCO TO INSTALL 200A METER -CUSTOMER IS REQUIRED TO SUPPLY & INSTALL PHENOLIC LABEL ON METER BASE PRIOR TO SERVICE CONNECTION "2909 MOUNTAINVIEW AVE N #GARAGE" SPAN SPECIFIC NOTES P01 TO M01: -INSTALL 1-RUN 4/0 UG TPX, ± 130’ ___' ACTUAL P01 TO M02: -INSTALL 1-RUN 4/0 UG TPX, ± 210’ ___' ACTUAL PROJECT SCOPE: -INSTALL OH-UG SVC AT M01 -INSTALL OH-UG SVC AT M02 CIRCUIT FEET ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2173 SQ. 320 AMPS GAS 8.3 KW 80A 1.0% 2.2% 00 1"2" 00 50'100' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1566 SQ. 200 AMPS ELECTRIC 12.9 KW 80A 1.7% 2.7 NEW CABLE & CONDUIT DIAGRAM @ GARAGE NOT TO SCALE TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE Direction of Vehicular TrafficRoad Face Quadrant Field Face Quadrant Climbing Space Climbing Space Standoff Bracket 15" Min Length Conduit ClampConduit 5" Min 4'x4' Work Pit LC LC UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites OH TRF REPLACEMENT House OH-UG SVC Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6211300 P01 319206-166023 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319206-166023 25kVA 120/240v 105097376511157688 583066679OH MISC MFP21001784 RESTORATION PER CITY OF RENTON STANDARDS