Loading...
HomeMy WebLinkAboutR-414104T DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 I w I- ,`��10' - 1 TOE IN SHEETING IN__/ 4" x 4" MIN. TRENCH `'Li i ti LI-Ini.i= ��ki 11I' PROVIDE ENERGY DISSIPATION AT TOE IF EROSION IS LIKELY - SANDBAG (TYP.) 10' MAX. NOTES: 1. CONDITIONS OF USE 1.1. PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS. 1.2. PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. 1.3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY -SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH'... CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS. 1.4. THIS METHOD SHALL NOT BE USED UPSLOP_EOFAREA&J}IATMIGHTI3E,A[Djf€RSEUYIMPACTEO.pY RU�IQFF._SUCIi ARFA$INCLUG,E,ST€EP ANp7. UNSTABLE SLOPES. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS. 2.2. IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTIONSHALL BE INSTALLED AT THE TOE OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. 2.3. TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC. 2.4. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED. 3.. MAINTENANCE STANDARDS 3.1. TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED. 3.2. IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED. 3.3. WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED. UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NT5) PUBLIC WORKS PRO STD. PLAN - 213.30 •�• ',„ DEPARTMENT PLASTIC COVERING GAZ 9/28/2018 I :45 am1,1w,,14"-..,,...,..,, DATE DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT, AS PER CITY ROAD STANDARDS EX`5T\NG aOPO 4"-8" QUARRY SPALLS 12" MIN. THICKNESS CONSTRUCTION ENTRANCE NOTES: 1. DRIVEWAYS SHALL BE PAVED TO THE EDGE OF THE RIGHT-OF-WAY PRIOR TO INSTALLATION OF THE, CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD 15' MIN. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA NOTES: 1. CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. "2 iFOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKINC.,_BASED ON LOT SIZE/CONFIGURATION:. 2, DESIGN AND INSTALLATION SPECIFICATIONS 1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT -.€ROM PUMPING UP INTO THE_R KPAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: GRAB TENSILE STRENGTH (ASTM D4632) 200 LBS. MIN. GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) CBR PUNCTURE STRENGTH (ASTM D6241) 495 LBS. MIN. ADS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE) 22. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. 23. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2A. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY. INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF. SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL? WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. O.L'3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 215.10 PUBLIC WORKS nPPR°vED URDEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018 :45 ..,..,.,...,,.............,.... DATE Lii Lq a SW 1/4 OF THE SE 1/4, SEC. 14, T 23N, R 05E, W.M. DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 I DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS 2"x2" 14 GAUGE WIRE, OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED --�� FILTER FABRICMna _ _ - - _ _ _ _ _ _ _ - 6' MAX. �I POST SPACING MAY BE INCREASED L 12" MIN. I TO 8' IF WIRE BACKING IS USED � 4"x4" MIN. TRENCH r) I BACKFILL TRENCH WITH NATIVE SOIL I� OR 3/4" TO 1-1/2" WASHED GRAVEL 2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) NOTES: 1. CONDITIONS OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMO_IUNTS OF OVERLAND FLOW ANY CONCENTRATED;' FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. AOS (ASTM D4751) 30-100 SIEVE SIZE (0.60-0.115mm) FOR SILT FILM 50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D4491) 0.02 SEC'MINIMUM GRAB TENSILE STRENGTH (ASTM D4632) 180 LBS. MIN. FOR EXTRA STRENGTH FABRIC 100 LBS. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM D4632) 30 % MAX. (WOVEN) ULTRAVIOLET RESISTANCE (ASTM D4355) 70% MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF'THEIFENCE, WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 2.5. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. 3.2 IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP ORPOND. 13j IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.41 SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 61NCHES HIGH. 3;59 1F THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. PUBLIC WORKS DEPARTMENT DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 214.00 P SILT FENCE GAZ 9/28/2018 :45 DATE 5" MAX. DRAINAGE GRATE TRIM GRATE FRAME _ C- OVERFLOW BYPASS J a BELOW INLET GRATEt2EV10E: SEDIMENT AND DEBRIS FILTERED WATER - SECTION VIEW DRAINAGE GRATE (RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.) wo BELOW INLET GRATE DEVICE ISOMETRIC VIEW OVERFLOW BYPASS(TYP.) NOTES: L PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT; POND OR TRAP., ',2d INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM. E3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE:, -4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE. 5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). LBL,. 'ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE [STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 216.30 } PUBLIC WORKS Ll E°'DEPARTMENT CATCH BASIN INSERT AZ 9/28/2018 :45 oks DATE NO. I REVISION EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL(ESSC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT;rMAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING' NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC'. ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY Or RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT, ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL, BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE'. WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE'. COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY, 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITEr ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 268.00 0PUBLIC WORKS EROSION AND SEDIMENT CONTROL [PPROVID DEPARTMENT STANDARD PLAN NOTES GAZ 9/28/2018 1 9:45 Public Wotks ndministtator. DATE THE 13 ELEMENTS OF A CONSTRUCTION SWPPP 1. PRESERVE VEGETATION/MARK CLEARING LIMITS: THE CLEARING LIMITS ARE INDICATED ON THE PLAN SHEET. FURTHERMORE, CLEARING AND GRADING WILL BE LIMITED TO ONLY AREAS THAT NEED TO BE DISTURBED FOR GRADING/ CONSTRUCTION OF THE SITE AND FRONTAGE IMPROVEMENTS. CONSTRUCTION WILL REQUIRE REGARDING THE ENTIRE SITE. FIELD MARKING THE CLEARING LIMITS SHALL BE COMPLETED PRIOR TO CLEARING AND GRADING ACTIVITIES. BMPS: PRESERVE NATURAL VEGETATION (VEG) 2. ESTABLISH CONSTRUCTION ACCESS: ACCESS TO THE CONSTRUCTION SITE SHALL BE LIMITED TO THE ROCK CONSTRUCTION ENTRANCE. THE ROCK CONSTRUCTION ENTRANCE SHALL BE INSTALLED OFF OF THE STREET TO PROVIDE ACCESS TO THE CONSTRUCTION VEHICLE/EQUIPMENT STAGING AND EMPLOYEE PARKING AREAS. BMP'S: ROCK CONSTRUCTION ENTRANCE (CE) 3. CONTROL OF FLOW RATES: STORM WATER DETENTION: NO DETENTION IS PROPOSED FOR THE SITE SINCE THE WORK SHOULD BE COMPLETED IN A SHORT PERIOD OF TIME. BMP'S NONE PROPOSED 4. INSTALLATION OF SEDIMENT CONTROLS: SEDIMENT CONTROL WILL BE PROVIDED THROUGH A COMBINATION OF FILTRATION THROUGH THE SURROUND ON -SITE VEGETATION, OR FILTER FENCE IF REQUIRED BMP'S: SILT FENCE (SF) 5. SOILS STABILIZATION: TEMPORARY AND PERMANENT SOIL STABILIZATION WILL BE PROVIDED. TEMPORARY STABILIZATION WILL BE PROVIDED THROUGH THE APPLICATION OF STRAW AND/ OR PLASTIC SHEETING TO EXPOSED, WORKED EARTH. FROM OCTOBER 1 UNTIL APRIL 30, NO EXPOSED SOIL MAY REMAIN EXPOSED AND UNWORKED FOR MORE THAN TWO DAYS; AFTER MAY 1, NO EXPOSED SOIL MAY REMAIN EXPOSED AND UNWORKED FOR MORE THAN SEVEN DAYS. BMP'S: STRAW COVERING, PLASTIC SHEETING, FINAL LANDSCAPING(AS REQUIRED) 6. SLOPE PROTECTION: THERE ARE NO SLOPES ON THE SITE. HOWEVER, STOCK PILES SHALL BE PROTECTED FROM EROSION THROUGH COVER AND PREVENTION OF CONCENTRATED SURFACE RUNOFF FLOWS. BMP'S: PLASTIC SHEETING, (AS REQUIRED) 7. PROTECTION OF PERMANENT DRAIN INLETS: INLET PROTECTION WILL BE PROVIDED FOR ALL CATCH BASINS. BMP'S: INLET PROTECTION (IP). 8. STABILIZATION OF CHANNELS AND OUTLETS: ALL CHANNEL SLOPES SHALL BE CONSTRUCTED AND PROTECTED AGAINST EROSION IN ACCORDANCE WITH CITY CODE. BMP'S: NONE REQUIRED 9. POLLUTANT CONTROL: POLLUTANTS SHALL BE CONTROLLED THROUGH THE ON -SITE BMP'S PROPOSED ABOVE. 10. DEWATERING CONTROL: DE -WATERING: INTERCEPTION OF THE WATER TABLE IS NOT EXPECTED TO OCCUR. NO BMP'S ARE PROPOSED. 11. BMP MAINTENANCE: ALL BMP'S AND SWPPP ELEMENTS SHALL BE INSPECTED DAILY AND MAINTAINED AS REQUIRED. 12. PROJECT MANAGEMENT: THE PROJECT SHALL BE MANAGED IN A COOPERATIVE EFFORT BY THE PROJECT MANAGER, CONTRACTOR, ENGINEER, AND THE CITY INSPECTOR. DURING THE CONSTRUCTION PROCESS, IF UNFORESEEN ISSUES ARISE THAT CANNOT BE RESOLVED ON SITE, CONSTRUCTION ACTIVITY (OTHER THAN SWPPP MAINTENANCE) SHALL BE HALTED AND THE OWNER'S REPRESENTATIVE AND THE PROJECT ENGINEER ARE TO BE CONTACTED AND INFORMED OF THE SITUATION. 13. PROTECT LID FACILITIES: INFILTRATION FACILITIES ARE PROPOSED. THE CONTRACTOR IS REQUIRED TO LOCATED THESE AREAS PRIOR TO CONSTRUCTION AND INSTALL A BARRIER (I.E. SILT FENCE OR HIGH-VIS FENCE) AROUND THE FACILITY TO PROTECT THE UNDERLYING SOILS FROM COMPACTION. R-414104 SURVEYED: DESIGNED: DRAWN: CHECKED: BY DATE APPR APPROVED: SCALE: AS SHOWN ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY 1 /7/2021 VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M 4715 142nd PI. SW #B, Edmonds, WA 98026 ph 206.890.8291 CITY OF RENTON Planning/Building/Public Works Dept. IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING ff ` Nathan Janders 02/19/2021 DATE: 07-22-2020 R O P P E S F R FIELDBOOK: PAGE: DRAWING NO: TESC DETAILS C2.1 SHEET: 4 OF: 9 901 a LL U) w I..L O Q�