Loading...
HomeMy WebLinkAboutArchitectural ElevationsPAINT TO MATCH CITADEL ARCHITECTURAL PRODUCTS COLONIAL RED PAINT LEGEND SHERWIN WILLIAMS NEUTRAL GROUND (SW 7568) SHERWIN WILLIAMS GRIZZLE GRAY (SW 7068) PAINT TO MATCH KAWNEER #40 DARK BRONZE NEW STUD WALL WITH METAL PANEL TO MATCH EXISTING EXTERIOR ELEVATION LEGEND T/FINISH FLOOR 0' -0" T/WALL 15' -2" DCAB 09-06 09-08 09-07 3' - 4"T/FINISH FLOOR 0' -0" T/WALL 15' -2" 124563 09-11 TYP 09-11 09-0709-06 TYP 09-09 09-06 09-1109-08 118B 118A 118C 100A AA 09-09 116A116B116C 09-11 A406 2 117C 117B 117A 2 A507 09-10 05-01 1' - 0"10' - 2"9' - 0" VIF1 T/FINISH FLOOR 0' -0" T/WALL 15' -2" D C AB 09-1109-0609-07 09-08 09-0809-07 09-11 3' - 4"EXTENTS OF NEW FASCIA 25' - 6" 1' - 6" 02-25 09-06 09-09 A406 46 A507 1' - 0" 23' - 2"9' - 0" FIV05-01 1 110A 05-02 3' - 11"7' - 4"1 T/FINISH FLOOR 0' -0" T/WALL 15' -2" 1 2 4 5 6 113A 206 114B 114A 115A 115B 3 09-06 09-08 09-07 09-11 TYP09-11TYP 3' - 4"02-25 A2011 A201 A201 A201 2 3 4 A1.00 2 A1.00 3 A1.01 3 A1.01 2 MACKENZIE ALL RIGHTS RESERVED THESE DRAWINGS ARE THE PROPERTY OF MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, WITHOUT PRIOR WRITTEN PERMISSION SHEET JOB NO. SHEET TITLE: CHECKED BY: DRAWN BY: Project © Client Mechanical/Electrical 4/9/2021 8:35:58 AMC:\Users\arp\Documents\Revit Projects\LES SCHWAB\2200047 LS Renton\047-RENTON-V20-L.rvt As indicated A201 EXTERIOR ELEVATIONS ARP/MMA YY Les Schwab Renton Modernization 354 Union Avenue NE, Renton, WA Les Schwab 2200047.00 01.28.2021PERMIT/BID SET ADDENDUM 01 04.09.2021 2020 20900 Cooley Road, PO Box 5350 Bend, OR 97701 1/8" = 1'-0"A201 1 A201/03 - EAST ELEVATION 1/8" = 1'-0"A201 2 A201/01 - NORTH ELEVATION 1/8" = 1'-0"A201 3 A201/04 - WEST ELEVATION 1/8" = 1'-0"A201 4 A201/02 - SOUTH ELEVATION A201 5 KEY PLAN 02-25 (E) RTU TO REMAIN, REF. MECHANICAL 05-01 PREFABRICATED METAL AWNING SYSTEM 05-02 PREFABRICATED METAL AWNING SYSTEM, CENTER OVER DOORWAY 09-06 EXTERIOR PAINT TYPE 1 (GRIZZLE GRAY); SHERWIN WILLIAMS - PRO INDUSTRIAL PRE-CATALYZED WB EPOXY SEMI-GLOSS 09-07 EXTERIOR PAINT TYPE 2 (NEUTRAL GROUND); SHERWIN WILLIAMS - PRO INDUSTRIAL PRE-CATALYZED WB EPOXY SEMI-GLOSS 09-08 EXTERIOR PAINT TYPE 3 (ARMORSEAL TILE RED); SHERWIN WILLIAMS - PRO INDUSTRIAL PRE-CATALYZED WB EPOXY SEMI-GLOSS 09-09 EXTERIOR PAINT TYPE 4 (EXTRA DARK BRONZE); SHERWIN WILLIAMS - PRO INDUSTRIAL PRE-CATALYZED WB EPOXY SEMI-GLOSS 09-10 INFILL WITH METAL PANEL TO MATCH ADJACENT EXISTING METAL PANEL. PAINT TO MATCH ADJACENT (N) FINSHES 09-11 METAL PANEL 2 (COLONIAL RED) KEYNOTES A. SEE ARCHITECTURAL GENERAL NOTES ON G100 FOR ADDITIONAL INFORMATION B. SEE A501 FOR WALL TYPES C. SEE A151 FOR FINISH SCHEDULE D. PATCH, REPAIR AND PREP ALL EXTERIOR SURFACES FOR PAINT, INCLUDING DOORS AND FRAMES. REMOVE (E) BUILDING MOUNTED SIGNAGE PRIOR TO PAINT, REPLACE IN (E) LOCATION WHEN PAINTING IS COMPLETE UNO. E. REMOVE ALL (E) BACKER ROD AND SEALANT AT CONTROL JOINTS AND EXPANSION JOINTS AND PROVIDE NEW BACKER ROD AND SEALANT. F. PRESSURE WASH AND CLEAN EXTERIOR SURFACES OF BUILDING PRIOR TO PAINTING. G. PATCH AND REPAIR WORK DAMAGED DURING CONSTRUCTION TO LIKE-NEW CONDITION. H. PAINT FRONT, BACK AND BOTTOM OF ALL PILASTERS, COLUMNS, PIERS, SOFFITS, CANOPIES, AND FASCIAS. I. REPAINT ALL (E) EXTERIOR BOLLARDS TO MATCH (E). J. PAINT ALL FLASHING TO MATCH ADJACENT BUILDING COLOR. K. CLEAN AND PAINT POLE SIGN TO MATCH (E). L. (N) LES SCHWAB SIGNAGE TO BE REPLACED BY CARLSON SIGNS; WORK TO BE SUBMITTED UNDER SEPARATE PERMITS. M. PROVIDE METAL DRIP EDGE AT DOOR HEAD AT ALL NEW EXTERIOR HM SWINGING DOORS. REFER TO DOOR HARDWARE NUMBER NOTED IN DOOR SCHEDULE AND SPECIFICATIONS. N. RECONNECT ALL ROOF DRAINS AND DOWNSPOUTS TO SUBGRADE DRAINAGE SYSTEM TO ORIGINAL CONDITIONS. REF CIVIL DRAWINGS O. COORDINATE WITH SIGNAGE PLANS REQUIRED STRUCTURAL BACKING AND REQUIRED ELECTRICAL ROUGH-IN LOCATIONS. P. REPLACE ALL EXISTING EXTERIOR LIGHTING WITH NEW FIXTURES. Q. REPAINT ALL EXISTING DOOR AND WINDOW FRAMES PAINT TYPE 4 (EXTRA DARK BRONZE). GENERAL NOTES REVISION SCHEDULE Delta Issued As Issue Date 1 ADDENDUM 01 04/09/2021 1 T/FINISH FLOOR 0' -0" T/WALL 15' -2" 124563 478 SF (PROVIDED TRANSPARENCY) 760 SF (FACADE AREA, BETWEEN 4 FT - 8 FT) 760 SF X .50 = 380 SF (REQUIRED TRANSPARENCY) 380 (REQUIRED) > 478 SF (PROVIDED) T/FINISH FLOOR 0' -0" T/WALL 15' -2" D C AB 110 SF (PROVIDED TRANSPARENCY) 280 SF (FACADE AREA, BETWEEN 4 FT - 8 FT) 280 SF X .50 = 140 SF (REQUIRED TRANSPARENCY) 140 (REQUIRED) < 110 SF (PROVIDED) G103 1 G103 2A1.00 2 A1.00 3 A1.01 3 A1.01 2 MACKENZIE ALL RIGHTS RESERVED THESE DRAWINGS ARE THE PROPERTY OF MACKENZIE AND ARE NOT TO BE USED OR REPRODUCED IN ANY MANNER, WITHOUT PRIOR WRITTEN PERMISSION SHEET JOB NO. SHEET TITLE: CHECKED BY: DRAWN BY: Project © Client Mechanical/Electrical 4/9/2021 8:36:03 AMC:\Users\arp\Documents\Revit Projects\LES SCHWAB\2200047 LS Renton\047-RENTON-V20-L.rvt As indicated G103 EXTERIOR ELEVATIONS - TRANSPARENCY ANALYSIS ARP YY Les Schwab Renton Modernization 354 Union Avenue NE, Renton, WA Les Schwab 2200047.00 01.28.2021PERMIT/BID SET ADDENDUM 01 04.09.2021 2020 20900 Cooley Road, PO Box 5350 Bend, OR 97701 REVISION SCHEDULE Delta Issued As Issue Date 1 ADDENDUM 01 04/09/2021 1/8" = 1'-0"G103 1 A201/01 - NORTH ELEVATION - TRANSPARENCY COMPLIANCE 1/8" = 1'-0"G103 2 A201/04 - WEST ELEVATION - TRANSPARENCY COMPLIANCE 1" = 50'-0"G103 3 CODE KEY PLAN 1