HomeMy WebLinkAbout05-12-2021 - Kousoum emailCAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:Sonya Kousoum
To:Phil Olbrechts
Cc:Cynthia Moya; Kevin Louder; Donna Locher
Subject:Re: Fw: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street / BCE #21414
Date:Wednesday, May 12, 2021 1:05:28 PM
Good afternoon,
This is completely inaccurate to say that we took "unreasonably amount of time to respond to
the City's request for additional information and revisions" as shown multiple emails we
received and responded to Donna. Below is Donna's email from 9-25-2020 dropping the
notice of violation due to the City want the sewer plan from the engineer and I sent you the
engineer sewer plan costing me about $10,000 so far in the previous email :
Finding of ViolationDonna Locher <DLocher@Rentonwa.gov>
Fri 9/25/2020 10:48 AM
To: 'Sonya Kousoum' <skousoum@hotmail.com>
Cc: Cynthia Moya <CMoya@Rentonwa.gov>
Good Morning,
As long as you keep moving forward at a good pace I will waive the fines. (no hearing required) If at
any time the progress stops, we will re-assess all fines.
Respectfully,
Donna Locher
Lead Code Compliance Inspector
425-430-7438
dlocher@rentonwa.gov
The architect had multiple correspondences with the City as recent as last week. As you may
recalled Donna said "It's not my job" to know what the City requesting. It's been my
impression that City permit department and Donna are not on the same page. It's very
frustrating to get multiple Violation notices from Donna since the City is in charge of issuing
the permit. Is it possible to get someone from the City to get their statement as you
mentioned in the hearing to resolve this?
Sonya
From: Phil Olbrechts <olbrechtslaw@gmail.com>
Sent: Wednesday, May 12, 2021 10:11 AM
To: Sonya Kousoum <skousoum@hotmail.com>
Cc: Cynthia Moya <CMoya@rentonwa.gov>; Kevin Louder <KLouder@rentonwa.gov>; Donna Locher
<DLocher@rentonwa.gov>
Subject: Re: Fw: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street /
BCE #21414
Thank you Ms. Kousoum. As you may recall, I need to determine if you took an
unreasonably amount of time to respond to the City's requests for additional information and
revisions on your building permit applications. The email that Ms. Locher sent shows that the
City asked for plan revisions on March 17, 2020. The emails you have provided in response
shows that the first response from your consultant was on April 30, 2021, more than a year
later after the City's March 17, 2020 request. Was April 30, 2021 your first response to the
City's March 17, 2020 request for permit revisions/information?
On Mon, May 10, 2021 at 8:03 PM Sonya Kousoum <skousoum@hotmail.com> wrote:
Sonya
From: Hal Grubb <hgrubb@barghausen.com>
Sent: Friday, May 7, 2021 8:49 AM
To: Sonya Kousoum <skousoum@hotmail.com>
Cc: Dene Kuzaro <dkuzaro@barghausen.com>; Colleen Allen <callen@barghausen.com>; Ian
Johnson <richdesign1ij@gmail.com>
Subject: RE: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street / BCE
#21414
Sonya,
See attached response from the city. Looks like the sewer permit has already been submitted and
permit ready to issue after the pump and easement gets reviewed.
Hal P. Grubb P.E. | Director of Engineering Services
Office: 425-251-6222 | Direct: 425-656-7425 | Mobile: 206-255-4370
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South, Kent WA 98032
www.barghausen.com
From: Sonya Kousoum <skousoum@hotmail.com>
Sent: Thursday, May 6, 2021 6:20 PM
To: Hal Grubb <hgrubb@barghausen.com>; Colleen Allen <callen@barghausen.com>
Cc: Dene Kuzaro <dkuzaro@barghausen.com>
Subject: Re: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street / BCE
#21414
Dear Hal,
I want to check in if you have an estimate on the cost of the sewer permit? Are you able to
submit anything to the City of Renton? Could you please send me the latest sewer plan?
Thanks!
Sonya
From: Hal Grubb <hgrubb@barghausen.com>
Sent: Wednesday, May 5, 2021 8:46 AM
To: Colleen Allen <callen@barghausen.com>
Cc: Sonya Kousoum <skousoum@hotmail.com>; Dene Kuzaro <dkuzaro@barghausen.com>
Subject: RE: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street / BCE
#21414
Thank you Colleen. Please check in again tomorrow sometime if you do not hear today.
Hal P. Grubb P.E. | Director of Engineering Services
Office: 425-251-6222 | Direct: 425-656-7425 | Mobile: 206-255-4370
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South, Kent WA 98032
www.barghausen.com
From: Colleen Allen <callen@barghausen.com>
Sent: Wednesday, May 5, 2021 8:23 AM
To: Hal Grubb <hgrubb@barghausen.com>
Cc: Sonya Kousoum <skousoum@hotmail.com>; Dene Kuzaro
<dkuzaro@barghausen.com>
Subject: RE: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th
Street / BCE #21414
As you know, I emailed the Permit Tech yesterday morning letting her know that Lisa
Walker has not contacted me about the sewer plans submittal. I asked for Lisa’s phone
number and email address, but I have not received a reply so far.
Colleen Allen | Project Coordinator
Office: 425-251-6222 | Direct: 425-656-7488
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South, Kent WA 98032
www.barghausen.com
From: Hal Grubb <hgrubb@barghausen.com>
Sent: Monday, May 3, 2021 9:48 AM
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
To: Colleen Allen <callen@barghausen.com>
Cc: Sonya Kousoum <skousoum@hotmail.com>; Dene Kuzaro
<dkuzaro@barghausen.com>
Subject: RE: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th
Street / BCE #21414
Colleen, if you do not get an answer back from either the project manager or the permit tech
by the end of today, please check in tomorrow morning. Thank you.
Sonya, see the message below from the city. We are working on how to get the sewer
submitted and will let you know as soon as we hear something.
Hal P. Grubb P.E. | Director of Engineering Services
Office: 425-251-6222 | Direct: 425-656-7425 | Mobile: 206-255-4370
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South, Kent WA 98032
www.barghausen.com
From: PermitTech <PermitTech@Rentonwa.gov>
Sent: Friday, April 30, 2021 4:03 PM
To: Colleen Allen <callen@barghausen.com>; PermitTech <PermitTech@Rentonwa.gov>
Cc: Hal Grubb <hgrubb@barghausen.com>
Subject: RE: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th
Street / BCE #21414
The Project Manager for B20000454 is Lisa Walker. That permit is currently in
corrections/resubmit status.
I have forwarded the email to her.
Thank you and have a nice afternoon.
Permit Counter
City of Renton
kjp
From: Colleen Allen <callen@barghausen.com>
Sent: Friday, April 30, 2021 2:23 PM
To: PermitTech <PermitTech@Rentonwa.gov>
Cc: Hal Grubb <hgrubb@barghausen.com>
Subject: Private Sewer Connection - Plan Review / Kousoum ADU / 8031 S. 130th Street /
BCE #21414
Hello,
We have a sewer plan that needs to be reviewed for an Accessory Dwelling Unit (Permit
Tracking #B20000454). We are not sure what permit to apply for to get this private sewer
connection reviewed. We are assuming a straightforward side sewer permit, but there is a
small pump station that will also be installed with this sewer connection. Please let me
know if we should apply for a side sewer permit or other permit.
Thanks for your help.
Colleen Allen | Project Coordinator
Office: 425-251-6222 | Direct: 425-656-7488
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South, Kent WA 98032
www.barghausen.com