Loading...
HomeMy WebLinkAbout211.009 1 3 1 CROSS SECTION 4' MIN. NOTES: OVERFLOW SPILLWAY 6' MIN. WIDTH 24" SETTLING DEPTH & 12" DEPTH OF 2"-4" ROCK, 12" DEPTH OF 3/4"-1 1/2" WASHED GRAVEL. 18" SEDIMENT STORAGE 12" DEPTH 2" - 4" ROCK 12" DEPTH 3/4" - 1 1/2" WASHED GRAVEL FILTER FABRIC FENCING 24" MIN. SETTLING DEPTH 1.5' MIN. SEDIMENT STORAGE 3.5' - 5'5' MAX. 12" OVERFLOW DEPTH OUTFLOW CHANNEL IF CONSTRUCTED BY EXCAVATION 1.MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM SEDIMENT TRAP STD. PLAN - 211.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT