Loading...
HomeMy WebLinkAbout213.101.CONDITIONS OF USE 1.1.FOR PERMANENT STABILIZATION OF SLOPES 2H:1V OR GREATER AND WITH MORE THAN 10 FEET OF VERTICAL RELIEF. 1.2.IN CONJUNCTION WITH SEED FOR FINAL STABILIZATION OF A SLOPE, NOT FOR TEMPORARY COVER. HOWEVER, THEY MAY BE USED FOR TEMPORARY APPLICATIONS AS LONG AS THE PRODUCT IS NOT DAMAGED BY REPEATED HANDLING. 1.3.THE APPLICATION OF APPROPRIATE NETTING OR BLANKET TO DRAINAGE DITCHES AND SWALES CAN PROTECT BARE SOIL FROM CHANNELIZED RUNOFF WHILE VEGETATION IS ESTABLISHED. NETS AND BLANKETS CAN ALSO CAPTURE A GREAT DEAL OF SEDIMENT DUE TO THEIR OPEN, POROUS STRUCTURE. SYNTHETIC NETS AND BLANKETS MAY BE USED TO PERMANENTLY STABILIZE CHANNELS AND MAY PROVIDE A COST-EFFECTIVE, ENVIRONMENTALLY PREFERABLE ALTERNATIVE TO RIPRAP. 2.DESIGN AND INSTALLATION SPECIFICATIONS 2.1.INSTALLATION IS CRITICAL TO THE EFFECTIVENESS OF THIS PRODUCT. IF GOOD GROUND CONTACT IS NOT ACHIEVED, RUNOFF CAN CONCENTRATE UNDER THE PRODUCT, RESULTING IN SIGNIFICANT EROSION. 2.2.JUTE MATTING MUST BE USED IN CONJUNCTION WITH MULCH. EXCELSIOR, WOVEN STRAW BLANKETS, AND COIR (COCONUT FIBER) BLANKETS MAY BE INSTALLED WITHOUT MULCH. OTHER TYPES OF PRODUCTS WILL BE EVALUATED INDIVIDUALLY. 2.3.PURELY SYNTHETIC BLANKETS ARE ALLOWED, BUT SHALL ONLY BE USED FOR LONG-TERM STABILIZATION OF WATERWAYS. THE ORGANIC BLANKETS ARE BETTER FOR SLOPE PROTECTION AND SHORT-TERM WATERWAY PROTECTION. 2.4.DO NOT STRETCH BLANKET/MATTINGS TIGHT - ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES. 2.5.SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT. 2.6.ANCHOR, STAPLE, AND INSTALL CHECK SLOTS AS PER MANUFACTURER'S RECOMMENDATION. 2.7.AVOID JOINING MATERIAL IN THE CENTER OF THE DITCH. 2.8.LIME, FERTILIZE, AND SEED BEFORE INSTALLATION. 3.MAINTENANCE STANDARDS 3.1.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND THERE MUST NOT BE EROSION BENEATH THE NET OR BLANKET. 3.2.AREAS OF THE NET OR BLANKET THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 3.3.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. NOTES: 4" MIN. OVERLAP 6" MIN. OVERLAP WATERWAY INSTALLATIONS OF NETS AND BLANKETS STD. PLAN - 213.10 PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT