1.CONDITION OF USE
1.1.CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
1.2.FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS:
2.2.DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH
LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3.HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.4.FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.5.WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3.MAINTENANCE STANDARDS
3.1.QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2.IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3.ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4.ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5.IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
NOTES:
CONSTRUCTION ENTRANCE NOTES:
1.DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY.
2.IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
INSTALL DRIVEWAY CULVERT
IF THERE IS A ROADSIDE
DITCH PRESENT, AS PER CITY
ROAD STANDARDS
GEOTEXTILE
4"-8" QUARRY SPALLS
12" MIN. THICKNESS
15' MIN.
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
100' MIN.
GRAB TENSILE STRENGTH (ASTM D4632)200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)30% MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM D6241)495 LBS. MIN.
AOS (ASTM D4751)20-45 (U.S. STANDARD SIEVE SIZE)
R = 25' MIN.
STABILIZED CONSTRUCTION ENTRANCE
STD. PLAN - 215.10
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)