Loading...
HomeMy WebLinkAbout235.00"FLOW-THROUGH" SYSTEM SHOWN SOLID. DESIGNS FOR "FLOW BACKUP" SYSTEM AND PARALLEL TANKS SHOWN DASHED 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.MINIMUM TANK DIAMETER IS 36 INCHES. 3.METAL PARTS PREFERRED TO BE STAINLESS STEEL, ALUMINIZED STEEL, OR ALUMINUM. ALL OTHER STEEL PARTS MUST BE GALVANIZED WITH TREATMENTS 1, 2, OR 5. 4.ACCESS RISERS REQUIRED WITHIN 50 FEET FROM ANY LOCATION IN THE DETENTION TANK AND WITHIN 5 FEET OF EACH TERMINAL END. ANY LOCATION WITHIN THE DETENTION TANK SHALL HAVE A DIRECT LINE OF SIGHT FROM AN ACCESS POINT, UNOBSTRUCTED BY ANY RESTRICTIONS SUCH AS A WALL OR BAFFLE. 5.H-20 LIVE LOADS MUST BE ACCOMMODATED FOR TANKS LYING UNDER PARKING AREAS, ROADWAYS, AND ACCESS ROADS. 6.BEDDING OF THE PIPE SHALL BE IN ACCORDANCE WITH STD. PLAN 220.00. 7.PRIOR TO STARTUP, DETENTION TANK SHALL PASS LEAK TEST. 8.PIPE MATERIAL, JOINTS, AND PROTECTIVE TREATMENT FOR TANKS SHALL BE IN ACCORDANCE WITH SECTIONS 7-04 AND 9-05 OF THE WSDOT/APWA STANDARD SPECIFICATION. 9.ALL TANK ACCESS OPENINGS MUST BE READILY ACCESSIBLE BY MAINTENANCE VEHICLES. 10.WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE. 11.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. NOTES: SECTION A PLAN INLET PIPE (BACKUP SYSTEMS, WHERE ALLOWED) INLET PIPE (FLOW THROUGH) FLOW 2' MIN. 36" MIN. 36" MIN. CONNECTOR PIPE SAME SIZE AS INLET PIPE, 12" MIN. DIA. TYPE 2 CATCH BASIN (CB) REQUIRED FOR FLOW THROUGH SYSTEM ONLY PER STD. PLAN 201.00 OPTIONAL PARALLEL TANK ACCESS RISERS, SEE NOTE 4 ACCESS RISERS PER STD. PLAN 235.10 CONTROL STRUCTURE WITH SOLID LOCKING LID 2' MAX. 50' MAX.100' MAX. 6" SEDIMENT STORAGE 2' MIN. 2' MIN. 2" MIN. DIA. AIR VENT PIPE WELDED TO TANK (REQUIRED IF NO ACCESS RISER ON TANK) ACCESS RISERS, SEE STD. PLAN 235.10 36" MIN. DIA. (TYP.) CONTROL STRUCTURE (FROP-T SHOWN), MIN. 54" DIA. TYPE 2 CB PER STD. PLAN 237.00 DETENTION TANK (SIZE AS REQUIRED) A OUTLET PIPE FINISH GRADE 2' MIN. SEE NOTE 10 (TYP.) SEE NOTE 10 (TYP.) FLOW RESTRICTOR PER STD. PLAN 237.00 6" MIN. FLOW 5' MAX. TERMINAL END TYPICAL DETENTION TANK STD. PLAN - 235.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEMartin Pastucha Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C108 8/13/2020 | 8:48 AM PDT