Loading...
HomeMy WebLinkAbout238.00SECTION A PLAN INFLOW PIPE INFILTRATION POND SETTLING POND IF REQUIRED ACCESS ROAD OUTFLOW/OVERFLOW STRUCTURE EMERGENCY OVERFLOW SPILLWAY 5' MIN. EXISTING GROUND H 12'-15' IF H>6' 6' IF H<6' (TYP.) NOTES: 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.ACCESS ROAD AND RAMP SHALL MEET REQUIREMENTS IN STD. PLAN 234.50. 3.ALL FACILITIES SHALL HAVE FENCES. FENCE SHALL BE PROVIDED AROUND FACILITY ALLOWING PROPER MAINTENANCE PER STD. PLAN 234.40. 4.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. TRACT/EASEMENT LINES AS REQUIRED CONNECTING SPILLWAY A3H:1V (TYP.) KEY REQUIRED FOR BERM HEIGHT>4' TYPICAL INFILTRATION POND STD. PLAN - 238.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT