HomeMy WebLinkAbout238.00SECTION A
PLAN
INFLOW PIPE
INFILTRATION POND
SETTLING POND
IF REQUIRED
ACCESS ROAD
OUTFLOW/OVERFLOW
STRUCTURE
EMERGENCY
OVERFLOW
SPILLWAY
5' MIN.
EXISTING GROUND
H
12'-15' IF H>6'
6' IF H<6'
(TYP.)
NOTES:
1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND
APPLICABLE DESIGN CRITERIA.
2.ACCESS ROAD AND RAMP SHALL MEET REQUIREMENTS IN STD. PLAN 234.50.
3.ALL FACILITIES SHALL HAVE FENCES. FENCE SHALL BE PROVIDED AROUND FACILITY ALLOWING PROPER MAINTENANCE PER STD. PLAN 234.40.
4.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS.
TRACT/EASEMENT
LINES AS REQUIRED
CONNECTING SPILLWAY A3H:1V (TYP.)
KEY REQUIRED FOR
BERM HEIGHT>4'
TYPICAL INFILTRATION POND
STD. PLAN - 238.00
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT