Loading...
HomeMy WebLinkAbout249.30PLANT WITH WETLAND PLANTS PER TABLE 6.4.1.A OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ACCESS ROAD ACCESS ROAD SPILLWAY WETLAND CELLFIRST CELL (FOREBAY) INFLOW INLET WITH SPILL CONTROL WQ DESIGN WS 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.ACCESS ROAD AND RAMP SHALL MEET REQUIREMENTS IN STD. PLAN 234.50. 3.ALL FACILITIES SHALL BE FENCED. FENCE SHALL BE PROVIDED AROUND FACILITY ALLOWING PROPER MAINTENANCE PER STANDARD PLANS UNLESS OTHERWISE SPECIFIED. FENCE TO BE PROVIDED IN ACCORDANCE WITH STD. PLAN 234.40. 4.WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE. 5.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. PLAN VIEW INLET SUBMERGED 12" MIN. INLET EROSION CONTROL/SLOPE PROTECTION PER DETENTION FACILITY REQUIREMENTS MANHOLE OR TYPE 2 CATCH BASIN IF REQUIRED, PLACE LINER IN SECOND CELL TO HOLD WATER 2' MIN. FIRST CELL DEPTH 4' MIN. TO 8' MAX. TOP OF BERM TO BE LEVEL AND AT OR 1' BELOW WATER QUALITY (WQ) DESIGN WATER SURFACE (WS) SEDIMENT STORAGE DEPTH = 12" MIN. 2.5' MAX. SECTION VIEW NOTES: QUARRY SPALL PAD SEE NOTE 4 (TYP.) OUTLET PIPE SIZED TO PASS PEAK FLOW FOR CONVEYANCE REQUIREMENTS IF TOP OF BERM IS SUBMERGED 1' BELOW WQ DESIGN WS, BERM SIDE SLOPES MAY BE 2H:1V, OTHERWISE SIDE SLOPES MUST BE 3H:1V PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STORMWATER WETLAND OPTION A STD. PLAN - 249.30 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT