Loading...
HomeMy WebLinkAbout252.00ACCESS ROAD TO INLET STRUCTURE FIRST WETPOOL CELL 25% TO 35% OF WETPOOL VOLUME, EXCLUDING ACCESS RAMP SECOND WETPOOL CELL NOTES: 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.SEE STANDARD PLAN 252.10 FOR TYPICAL COMBINED DETENTION AND WETPOND CROSS SECTIONS. 3.ACCESS ROAD AND RAMP SHALL MEET REQUIREMENTS IN STD. PLAN 234.50. 4.SIDE SLOPES (INTERIOR AND EXTERIOR) SHALL NOT BE STEEPER THAN THREE (3) FEET HORIZONTAL TO ONE (1) FOOT VERTICAL. 5.OPEN PONDS SHALL NOT BE LOCATED IN DEDICATED PUBLIC RIGHT-OF-WAY OR ZONE 1 OF THE APA. 6.EXPOSED EARTH ON THE POND BOTTOM AND INTERIOR SIDE SLOPES SHALL BE SODDED OR SEEDED WITH AN APPROPRIATE SEED MIXTURE PER SECTION 5.1.1.1 OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM). ALL REMAINING AREAS OF THE TRACT MUST EITHER BE PLANTED WITH GRASS, OR BE LANDSCAPED IN ACCORDANCE WITH LANDSCAPING REQUIREMENTS INCLUDED IN SECTION 6.4.1.2 OF THE RENTON SWDM. 7.ALL FACILITIES SHALL BE FENCED. FENCE SHALL BE PROVIDED IN ACCORDANCE WITH STD. PLAN 234.40. 8.LANDSCAPING, TREES, AND POND GEOMETRY STANDARDS ARE SPECIFIED IN STD. PLAN 234.40. 9.COMBINED DETENTION AND WETPONDS WITH WETPOOL VOLUMES LESS THAN OR EQUAL TO 4,000 CUBIC FEET MAY BE SINGLE-CELLED (I.E. NO BAFFLE OR BERM IS REQUIRED). 10.WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE. 11.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. INLET PIPE & CATCH BASIN PER WETPOND FACILITY REQUIREMENTS ACCESS RAMP TO BOTTOM OF FIRST WETPOOL CELL BERM TOP WIDTH 5' MIN. (IF EARTHEN) TOP OF BERM OR BAFFLE TO BE LEVEL AND AT OR 1' BELOW WATER QUALITY (WQ) DESIGN WATER SURFACE (WS). EXTEND BERM OR BAFFLE ACROSS ENTIRE WETPOOL WIDTH EMERGENCY OVERFLOW WS OVERFLOW WS DETENTION WS WQ DESIGN WS OUTLET FLOW CONTROL STRUCTURE PER STD. PLANS 237.00-237.20 AND OUTLET PIPE SIZED PER DETENTION FACILITY REQUIREMENTS OUTLET EROSION CONTROL & ENERGY DISSIPATION PER DETENTION FACILITY REQUIREMENTS TRACT LINES AS REQUIRED 5' SETBACK, MIN. WETPOOL WIDTH EMERGENCY SPILLWAY PLANTINGS REQUIRED ON CUT SLOPES FOR SENSITIVE LAKE PROTECTION FACILITIES QUARRY SPALL PAD 3H:1V MAX. SEE NOTE 4 3H:1V MAX. SEE NOTE 4 OUTLET PIPE SEE NOTE 10 (TYP.) COMBINED DETENTION AND WETPOND STD. PLAN - 252.00A252.10PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)B252.10DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT