Loading...
HomeMy WebLinkAbout253.00DETENTION DESIGN WS WQ DESIGN WS ACCESS ROAD SLOPE VEGETATION PER DETENTION FACILITY REQUIREMENTS INLET EROSION CONTROL/SLOPE PROTECTION PER DETENTION FACILITY REQUIREMENTS INLET SUBMERGED 12" MIN. 2' MIN. FIRST CELL DEPTH 4' MIN. TO 8' MAX. SEDIMENT STORAGE DEPTH, 12" MIN. IF REQUIRED, PLACE LINER IN SECOND CELL TO HOLD WATER FLOW CONTROL OUTLET STRUCTURE PER STD. PLANS 237.00 - 237.20 2'-6" MAX. DETENTION PER DETENTION FACILITY REQUIREMENTS NOTES: 1.THIS DETAIL IS A SCHEMATIC REPRESENTATION ONLY. ACTUAL CONFIGURATION WILL VARY DEPENDING ON SPECIFIC SITE CONSTRAINTS AND APPLICABLE DESIGN CRITERIA. 2.ACCESS ROAD AND RAMP SHALL MEET REQUIREMENTS IN STD. PLAN 234.50. 3.ALL FACILITIES SHALL BE FENCED. FENCE SHALL BE PROVIDED IN ACCORDANCE WITH STD. PLAN 234.40. 4.WHEN CONNECTING TO A NEW PIPE, USE A FLEXIBLE CONNECTOR (KOR-N-SEAL BOOT WITH CORRUGATED PIPE ADAPTER OR APPROVED EQUAL). WHEN CONNECTING TO AN EXISTING PIPE, USE A FABRICATED SAND COLLAR OF THE SAME MATERIAL AS THE CONNECTING PIPE. 5.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. 3 1 SEE NOTE 4 (TYP.) PLANT WITH WETLAND PLANTS PER TABLE 6.4.1.A OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ACCESS ROAD ACCESS ROAD SPILLWAY WETLAND CELLFIRST CELL (FOREBAY) INFLOW PLAN VIEW QUARRY SPALL PAD SECTION VIEW IF TOP OF BERM IS SUBMERGED 1' BELOW WQ DESIGN WS, BERM SIDE SLOPES MAY BE 2H:1V, OTHERWISE SIDE SLOPES MUST BE 3H:1V TOP OF BERM TO BE LEVEL AND AT OR 1' BELOW WATER QUALITY (WQ) DESIGN WATER SURFACE (WS) OUTLET PIPE SIZED PER DETENTION FACILITY REQUIREMENTS COMBINED DETENTION AND STORMWATER WETLAND STD. PLAN - 253.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT