Loading...
HomeMy WebLinkAbout262.30PLAN INFLOW MATCH GUTTER WIDTH MATCH CURB WIDTH 12" MIN. 18"-24"" DESIGNER TO SPECIFY, SEE NOTE 2 6" MIN. 3'-6" MIN. 6" TAPER, (TYP.) 6" TAPER GUTTER AT CURB CUT TO MATCH GUTTER SLOPE UPSLOPE AND DOWNSLOPE OF CURB CUTROADWAY STREAMBED COBBLES, SEE NOTE 3 12" A ROADWAYINFL O W CURB SEE NOTE 1 SPLASH APRON GENERAL NOTES: 1.BOND NEW CURB AND GUTTER TO EXISTING CURB AND GUTTER WITH EPOXY AND DOWEL CONNECTION, IF RETROFITTING INTO EXISTING CURBLINE. REFER TO STD. PLAN 101.10 FOR EXPANSION JOINT DETAIL. 2.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. ROADWAY SLOPE INFLOW 2.5 1 SECTION A 2" GUTTER DEPRESSION AT FLOWLINE 18''1" DROP TO COBBLES 6" MIN. FREEBOARD BIORETENTION FACILITY GUTTER UPSLOPE AND DOWNSLOPE OF CURB CUT TYPICAL SIDE SLOPE COMPACT SOIL BELOW COBBLES, SEE NOTE 4 NOTES: 1.SEE STD. PLAN 262.20 FOR EDGE TREATMENT OUTSIDE INLET AREA. 2.INLET CURB CUT WIDTH SHALL BE 24" ON GUTTER SLOPES ≥ 5% AND 18" ON GUTTER SLOPES < 5%. 3.STREAMBED COBBLES SHALL BE 6" COBBLES PER WSDOT 9-03.11(2). COBBLE PAD TO BE 8" THICK, WITH 1:1 SIDE SLOPES, TAPERING TO 12'' WIDE AT FACILITY BOTTOM. 4.COMPACT BIORETENTION SOIL MIX UNDER COBBLES TO 90% MAX STANDARD PROCTOR DENSITY (ASTM D698). 4" CRUSHED SURFACING TOP COURSE 8" UNCOMPACTED BIORETENTION SOIL MIX (BSM), SEE STD. PLAN 262.60 2"-4" ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 18" MIN. 1 1 PUBLIC WORKS DEPARTMENT APPROVED: DATEGregg Zimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) BIORETENTION - CURB CUT INLETS STD. PLAN - 262.30 A DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT