Loading...
HomeMy WebLinkAboutCO 01CAG-20-150, CO #1-21 Approved by Cheryl Beyer via 5/10/2021 email Change Order No. 1 Contract Title: Renton Elementary and Middle School Crossing Contract No. CAG -20-150 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: At Sierra Heights Elementary School, the installation of the median is removed from the contract and the removal and installation of pavement markings are revised as shown on the attached revised plan sheets 4, 7, and 10. Reason for Change: A bus turning analysis at the school exit shows the median would interfere with the bus turning movements and the width of the median was less than the design standard of six feet . Materials: N/A Plans: Plan sheets 4, 7 and 10. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2020 WSDOT/APWA Standard Specifications. The Work will be measured and paid under the respective unit and lump sum prices. The attached Equitable Adjustment Summary lists the unit and lump sum bid items that are adjusted due to this change. The adjustments to the unit bid item quantities are estimates; the Contractor will be paid based on the actual quantities installed. See attached. Extension of Time: The Time for Completion is extended 0 Working Days. Change Order No. 1 Contract Title: Renton Elementary and Middle School Crossing Contract No. CAG -20-150 Page 3 of 3 Sections 1-04.4 and 1-04.5 of the 2020 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order Plans Field Directive Change Order Quotation Estimated Change Order Cost Project Labor List Force Account Equipment Rate Request ( DOT Form 422-010 EF) Equitable Adjustment Determination Item No. Quantity Change Unit Price 19 -9 SY $213.78 31 -60 LF $21.00 32 1.2 HUND $525.00 33 0.2 HUND $850.00 37 -48 SF $45.00 42 A 1 LS ($100.00) 43 -137 LF $4.25 44 16 SF $5.00 48 -585 LF $2.50 Change Order No. 1 By: Date: Renton Elementary and Middle School Crossings PGH Excavating, Inc. CAG-20-150 HSIP-000S(533) Tamara Nack Change Order Cost (Equitable Adjustment) Project Name: Contractor: Federal Aid No: Contract No: Construction Manager: 100.00 6,508.77 100.00) 582.25) Calculated Change Order Cost Estimated Change Order Cost Plastic Crosswalk Line Removing Paint Line 1,260.00) 630.00 170.00 2,160.00) 80.00 1,462.50) Permanent Signing (new bid item) Plastic Line Extruded curb RPM Type 1 RPM Type 2 Detectable Warning Surface Bid Item Change Description EstimatedCostUnit 1,924.02)Stamped Hot Mix Asphalt 123456X7UNION AVE NESIERRAHEIGHTSELEMENTARYSCHOOLXXXXXNE 25TH PL367X X UNION AVE NE 11332245114777NUMBERBYAPP.REVISION DESCRIPTIONDRAWN BY:DESIGN BY:CHECK BY:PROJ MGR: FILE:CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONDATEDRAWING NO.PROJECT NO.FED AID NO.DATE: SHEET NO.OFSURVEYED:FIELD WORKDIRECTIVE #1RENTON ELEMENTARY AND MIDDLE SCHOOL CROSSINGSHSIP-000S(533)TED4004099720 3RD AVENUE, SUITE 2020SEATTLE, WA 98104PHONE: (206) 297-1601www.tooledesign.com23TLDKMLCSKML11/02/2020SHEET OFSITE PREPARATION PLAN1304SP1 SIERRA HEIGHTS ELEMENTARY SCHOOL CROSSINGFIELD WORK DIRECTIVE #14/2/2021 SIERRAHEIGHTSELEMENTARYSCHOOLUNION AVE NENE 25TH PL260'27'80'1UNION AVE NE 233110'50'11'1PD119'88850'11'11'50'50'60'26'10', TYP.2PD42PD412345678NUMBERBYAPP.REVISION DESCRIPTIONDRAWN BY:DESIGN BY:CHECK BY:PROJ MGR: FILE:CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONDATEDRAWING NO.PROJECT NO.FED AID NO.DATE: SHEET NO.OFSURVEYED:FIELD WORKDIRECTIVE #1RENTON ELEMENTARY AND MIDDLE SCHOOL CROSSINGSHSIP-000S(533)TED4004099720 3RD AVENUE, SUITE 2020SEATTLE, WA 98104PHONE: (206) 297-1601www.tooledesign.com23TLDKMLCSKML11/02/2020SHEET OFCHANNELIZATION, SIGNAGE, AND PAVING PLAN1307CH1 SIERRA HEIGHTS ELEMENTARY SCHOOL CROSSINGFIELD WORK DIRECTIVE #14/2/2021 UNION AVE NE SIERRA HEIGHTSELEMENTARYSCHOOL4.1'6'3'3'4.1'4.5'5.4'12'5.4'UNION AVE NENUMBERBYAPP.REVISION DESCRIPTIONDRAWN BY:DESIGN BY:CHECK BY:PROJ MGR: FILE:CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONDATEDRAWING NO.PROJECT NO.FED AID NO.DATE: SHEET NO.OFSURVEYED:FIELD WORKDIRECTIVE #1RENTON ELEMENTARY AND MIDDLE SCHOOL CROSSINGSHSIP-000S(533)TED4004099720 3RD AVENUE, SUITE 2020SEATTLE, WA 98104PHONE: (206) 297-1601www.tooledesign.com23TLDKMLCSKML11/02/2020SHEET OFPAVING DETAILS1410PD1 SIERRA HEIGHTS ELEMENTARY SCHOOL CROSSINGSCALE AS SHOWN1TYPSCALE AS SHOWN2TYPFIELD WORK DIRECTIVE #14/2/2021