Loading...
HomeMy WebLinkAboutM_Updated Project Narrative_Verizon COW_210525_v1.pdfFrom: Kim Allen <kim.allen@wirelesspolicy.com> Sent: Friday, May 21, 2021 2:32 PM To: Alex Morganroth Subject: Re: Renton COW-Temporary Use Permit LUA19-000314 Hi Alex- I spoke with Verizon and they conveyed the information below. Let me know if this is sufficient. Updated Proposed Timeline below: Lease (F) 12/31/2021 Zoning Submit (F) 7/7/2021 Zoning Approved (F) 12/30/2021 BP Submit (F) 1/21/2022 BP Approved (F) 3/31/2022 CX Start (F) 4/4/2022 CX Complete (F) 5/31/2022 As an alternative, we are also talking to the same property owner about ground space only for collocating antennas on a wood PSE utility pole– this is our back up.. As an aside, there is extensive work being done to this building, and they have redesigned their remodel which required the additional permits – which we have heard are approved now. The need for the cell-on-wheels is directly tied to the ability of CITC to finish their project. The cell-on-wheels is only necessary due to the fact that CITC has not started their project, and that the reason they have not started their project is due to circumstances outside of their control (and not due to waiting on permit issuance). Please let me know if you need any additional information. Kim Allen Senior Vice President, Land Use Entitlements and Strategic Planning Wireless Policy Group LLC Office: 425-628-2666 Kim.allen@wirelesspolicy.com From: Alex Morganroth <AMorganroth@Rentonwa.gov> Date: Wednesday, May 19, 2021 at 1:16 PM CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.