Loading...
HomeMy WebLinkAbout0895.06 DFR 307.pdf Earth Solutions NW, LLC LETTER OF TRANSMITTAL 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 To: RJ Development Date: May 25, 2021 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Jeff Bennett Email: jeffb@accrete.build No. of Copies Date Description 1 5/21/21 Daily Field Report(s) # 307 Comments: CC: 1: Mark Richardson ATTN: mark@accrete.build 2: Jennifer Vogele ATTN: jennifer@accrete.build 3: Jonathan Chavez ATTN: jchavez@rentonwa.gov 4: Joe W ATTN: joew@accrete.build 5: Brittany Perry ATTN: brittany@accrete.build 6: ATTN: 7: ATTN: 8: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 307 Time On Site Time Off Site Date Day of Week 9:30 AM 10:00 AM 5/21/21 Friday Travel Time Weather 1.00Hr. RT 60s, OC Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test water main line backfill at the Weatherly Inn development. Water Main Trench Backfill: EDSNW rep arrived onsite and observed contractor had backfilled approximately 100’ of 3’ deep trench around a 12’’ductile iron pipe between CB#12 and the Modular Wetland vault with 1 ¼’’ minus recycled crushed concrete compacted in 12’’ lifts to grade with a jumping jack. ESNW rep observed contractor adding water to material in order to reach optimum moisture. ESNW rep used a ½’’ steel T-probe and found the subgrade to be suitably dense, firm, and unyielding. ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or greater in tested locations. ESNW rep will return as requested to continue observation and testing of further earthwork activities. Fig.1: Trench with 12’’ ductile iron water main line Jackson Lundgren, G.I.T. Senior Field Technician 206-468-0991 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 307 Time On Site Time Off Site Date Day of Week 9:30 AM 10:00 AM 5/21/21 Friday Travel Time Weather 1.00Hr. RT 60s, OC Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Johannsen Brad LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. Test Number Test Location (Stormwater trench backfill) Elevation Reference Compaction Curve Maximum Dry Density (pcf) Fill Moisture (%) Test Dry Density (pcf) % of Maximum Dry Density 304 See map -2’ SG 9 127.7 10.2 121.5 95 305 See map -1’ SG 9 127.7 11.6 122.1 96 306 See map -1’ SG 9 127.7 12.1 120.9 95 Fig. 2 Approximate location of compaction tests 304-306 trench backfill. 2/2 304 305 306