Loading...
HomeMy WebLinkAboutAdden 1AMENDMENT NO. 1 TO AGREEMENT FOR RENTON TRANSIT ORIENTED DEVELOPMENT (TOD) SUBAREA PLAN THIS AMENDMENT, dated for reference purposes only as November 20, 2020, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Makers Architecture and Urban Design, LLP (“Consultant”), a Washington limited liability partnership. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-19-287, dated August 28, 2019, to provide necessary services for the Renton Transit Oriented Development (TOD) Subarea Plan (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work and compensation in order to facilitate two additional Developer’s Forum events. NOW THEREFORE, It is mutually agreed upon that CAG-19-287 is amended as follows: 1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-1, which is attached and incorporated herein. 2.Time of Performance: Section 3, Time of Performance, is amended and all Work shall be performed by no later than June 30, 2021. 3.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $2,080 from $148,387 to $150,467, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-1 which is attached and incorporated herein. 4.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-19-287, Adden #1-21 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ C. E. “Chip” Vincent CED Administrator John Owen Partner ___12/23/2020___________________ Date 2020-12-09 Date Approved as to Legal Form By: __________________________ Shane Moloney City Attorney Contract Template Updated 01-15-2020 Approved by Leslie Clark via 12/7/2020 email EXHIBIT A-1 November 12, 2020 Katie Buchl- Morales City of Renton | CED | Long Range Planning Division 1055 S Grady Way, 6th Floor Renton, WA 98057 Re: Budget Amendment for Developer’s Forum Facilitation Dear Katie: This is a letter of proposal to amend MAKERS architecture and urban design’s existing contract with the City of Renton for the Rainier/ Grady Junction Subarea Plan. The scope of this amendment is to provide the following:  Facilitation of two (2) additional Developer’s Forum events Our proposed work assumes the following:  Hours provided are for facilitation of two (2) additional developer’s forum meetings and the documentation of results.  Developer’s forum meetings will be 2 hours max.  Meeting format and presentation materials prepared in advance will be the same as the developer’s forum planned in the original contract. The addition of these two (2) meetings will not require additional preparation time.  City staff will schedule meetings and send out invitations.  If the addition of these two (2) meetings results in additional analysis that falls outside of the scope of the original contract (such as work pertaining to the concurrent Housing Action Plan) staff will take on that work. Our proposed budget is attached. Sincerely, John Owen Partner CITY OF RENTON TOD SUBAREA PLAN BUDGET DRAFT JULY 1, 2019 Partner-in- Charge Project Manager Senior Associate Planner Planner Hourly rate $200 $120 $130 $100 Contract Amount Trip count Proposal budget A. Developer Forum 1 Facilitation of two additional Developer's Forum events. (Hours are for faciliitation and documentation of results. Preparation for meetings is assumed under the original contract hours.) 8 4 6 $ 2,080 Qty Unit Cost Supplemental Expenses -$ Total Cost 2,080$ 0 Partner-in- Charge Project Manager Planner $ - $ 960 $ 520 $ 600 $ 1,560 MAKERS MAKERS MAKERS Total