Loading...
HomeMy WebLinkAboutEx08_C_Advisory_NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA21-000154 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Jill Ding, 425-430-6598, jding@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and wh ere no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way with in the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Nathan Janders, 425-430-7382, njanders@rentonwa.gov) 1. See Attached Development Engineering Memo dated May 11, 2021 Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. The fire impact fees are applicable at the rate of $829.77 per single family unit. This fee is paid p rior to recording the plat. Credit is granted for the removal of the one existing home. 2. Fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. There are no existing fire Exhibit 8 DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA21-000154 hydrants in this area. The existing water mains appear undersized and will need to be replaced. A water availability certificate is required from King County Water District 90. 3. Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to support a 30-ton vehicle with 75-psi point loading. Approved apparatus turnarounds are required for dead end roads exceeding 150-feet. An approved hammerhead type turnaround is allowed for dead end streets up to 300-feet long. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. None at this time. Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. None at this time. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. None at this time. Building: (Contact: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov) 1. None at this time. DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: May 11, 2021 TO: Jill Ding, Senior Planner FROM: Nathan Janders, Civil Engineer II SUBJECT: Skyhorse Short Plat 16327 SE 132nd St LUA21-000154 I have completed a preliminary review of the application of the above-referenced proposal located at parcel 1323059053 and 1457500023, and have the following comments: The applicant is proposing to subdivide the lots into 8 single family lots with two tracts for drainage and open space. All existing structures on the parcels will be removed. Permits must be obtained from King County Water District 90 for the installation of the new water main within the right of way. Additional Right of way permits are required from King County for the storm and sewer main extensions. EXISTING CONDITIONS The Site is approximately 2.50 acres in size and is rectangular in shape with a 60 foot right of way separating the two parcels. The existing site is developed with an existing single family residence and a large amount of trees located throughout the parcel. Water The proposed development is within the Water District 90’s water service area. A water availability certificate from the Water District 90 has been provided as part of the land use application. Sewer Sewer service is provided by the City of Renton. There is an existing sewer manhole (Facility ID MH5625) just south of the intersection of 166th Avenue SE and SE 136th Street located within parcel 1323059038 (Liberty High School) that is intended to provide sewer service to the properties to the north. The City has an existing easement on Parcel 1323059038 for this future connection. Reference Project File WWP27003621 in COR Maps for record drawings. Wastewater in this main continues to flow approximately 400 feet to the south before connecting to the Liberty Lift Station. Storm Runoff along SE 132nd St is conveyed north by a shallow ditch to the City of Renton boundary. There is no on-site drainage system. Drainage from the site either infiltrates DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB Skyhorse Short Plat – LUA21-000154 Page 2 of 6 May 11, 2021 or sheet flows north and south of the property. The northern half of the property slopes to the north while the southern half of the property slopes to the south. Streets The proposed development fronts SE 132nd St along the North property line and unimproved 164th Ave SE right of way separates the two parcels running north and south. Both streets are classified as Residential Access. Existing right-of-way (ROW) width is approximately 60 feet. CODE REQUIREMENTS WATER 1. The proposed development is within the Water District 90’s water service area. Approved water plans from the Water District 90 must be provided to the development engineering project manager prior to start of site work. The project must meet all Fire Department requirements including hydrants and fire flow. SEWER COMMENTS 1. The development is subject to system development charges (SDCs) for sewer service. The SDC for sewer service is based on the size of the domestic water service. The 2021 sewer SDC for a lot with a 3/4" or 1” water meter is $3,450.00 per lot. SDCs are due at the time of construction permit issuance. 2. The development is located in the Central Plateau Interceptor Special Assessment District (SAD). The development is subject to fees related to this SAD. The SAD Fee has reached its maximum assessment at a rate of $538.48. SAD fees are due at the time of construction permit issuance. 3. The development is proposing to install a 10 inch sewer main extension from the northwest property limits to connect to the city manhole (SSMH5625) located at Liberty High School. The route will begin on the nothwest end of the property and will continue to the south along 164th Ave SE. Once sewer reaches SE 135th St the will need to run the sewer line from the west side of the road to the east side meeting at the intersection at 166th Ave SE. Sewer main the need to extend from the intersection to the SSMH located (SSMH 5625). a. The extension of this main is located within King County Right of Way. On behalf of the applicant, the City will apply for a franchise permit with King County for installation of the sewer main within King County right-of-way. The applicant is responsible for ensuring plans meet the requirements of King County and will be responsible for any corrections as required by the County. The applicant is responsible for all fees associated with obtaining the permit. The permit shall be issued prior to start of site work. 4. Each lot will require an individual sewer service line. The service lines shall be designed and installed in accordance with the City standards. The service line shall flow by gravity to the main where possible. The minimum service line size is 6” constructed at a minimum of 2% slope. 5. The downstream lift station is appropriately sized for this development. No capacity analysis or modification to the lift station is required. DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB Skyhorse Short Plat – LUA21-000154 Page 3 of 6 May 11, 2021 STORM DRAINAGE COMMENTS 1. The development is subject to stormwater system development charges (SDCs). The 2021 stormwater SDC is $2,000.00 per lot. The SDC will be collected for each new lot. SDCs are due at the time of construction permit issuance. 2. A Drainage Plan and Technical Information Report (TIR), dated October 27, 2020, was submitted by Encompass Engineering with the Land Use Application. Based on the City of Renton’s flow control map, the site falls under Flow Control Duration Standards (Forested Conditions). The south portion of the site is located within the Lower Cedar River and the north portion of the site is located in the May Creek drainage basin. The development is subject to a Full Drainage Review in accordance with the 2017 Renton Surface Water Design Manual (RSWDM). The TIR was completed in accordance with the standards found in the 2017 Renton Surface Water Design Manual (RSWDM). All nine core requirements and the six special requirements have been discussed in the Technical Information Report. a. The development is proposes to install a stormwater detention vault located on the Northeast corner of the proposed development with a 12-inch discharge to the north May Creek Drainage Basin. The Storm water vault has been sized assuming that no BMP credits will be used for the individual build lots. i. The proposed calculations assume an impervious surface area of 4,000 square feet per lot. The applicant proposes to include the maximum impervious limit on the short plat for recording. If the applicant would like to have more coverage than 4,000 square feet of effective impervious surface, they will need to adjust the vault calculations accordingly. b. The development is also proposing to install a stormwater detention vault located on the Southeast corner of the proposed development with a 12-inch discharge to the north Cedar River Drainage Basin. The Storm water vault has been sized assuming that no BMP credits will be used for the individual build lots. i. The proposed calculations assume an impervious surface area of 4,000 square feet per lot. The applicant proposes to include the maximum impervious limit on the short plat for recording. If the applicant would like to have more coverage than 4,000 square feet of effective impervious surface, they will need to adjust the vault calculations accordingly. c. On-site BMPs satisfying Core Requirement #9 will be required for the site. On-site BMPs shall be evaluated in order of preference by feasibility as described in Section C.1.3 of the 2017 RSWDM. Applicant need to provide what type of BMPs they propose for the project. Per the Geotechnical report submitted by Earth Solutions NW, Limited infiltration may be possible. 3. A Geotechnical Report, dated August 24th, 2017, completed by Earth Solutions NW for the site has been provided. The submitted report describes two different sections of soil characteristics. Based on the report the site contains an underlayment of predominately glacial till deposits. It was observed to have multiple locations of fill. Groundwater seepage was not observed at any of the test pit locations. The Geotechnical report mentions that limited infiltration is feasible due the types of soils that are located onsite. The Geotechnical engineer suggests that the soils DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB Skyhorse Short Plat – LUA21-000154 Page 4 of 6 May 11, 2021 should be used to accommodate construction of rain gardens, bio retention and other limited infiltration or Low impact development facilities with a recommended infiltration rate of 0.8 inches per hour. The project is proposing to install permeable pavement for the sidewalks and, as part of individual building permits, install limited infiltration facilities to satisfy core requirement #9. 4. Storm drainage improvements along all public street frontages are required to conform to the City’s street standards. New storm drains are designed and sized in accordance with the standards found in Chapter 4 of the 2017 Renton Surface Water Design Manual. 5. A Construction Stormwater General Permit from the Washington Department of Ecology is required as site clearing will exceed one acre. A copy of the permit shall be provided to the development engineering project manager prior to start of site work. 6. A right-of-way permit shall be obtained from King County for installation of stormwater utilities within King County. A copy of the permit shall be provided to the development engineering project manager prior to start of site work. 7. The south basin drainage path and discharge point is nearly identical to that proposed by the Maple Highlands Plat, LUA18-000633. The Hearing Examiners’ decision for LUA18-000633, dated March 24, 2019, identifies condition of approval #1 as needing comply with mitigation measures issued as part of the January 11, 2019 Determination of Non-Significance Mitigated; this decision requires the applicant shall install a new downstream drainage system prior to any construction stormwater discharging offsite to the east. Given that the south basin drainage path is nearly identical to the east as identified for Maple Highlands, staff recommends a similar condition of approval: the applicant shall install a new downstream drainage system prior to any construction stormwater discharging to the south. TRANSPORTATION/STREET COMMENTS 1. The 2021 transportation impact fee is $10,861.69 per single family home. Fees are payable at the time of building permit issuance for each individual home. 2. Shared Driveways shall be designed in accordance with the residential access street standards found in RMC 4-6-060. The minimum right of way width for a shared driveway is 16 feet. The minimum paved section width is 16-feet. 3. 164th Ave SE is classified as a residential access road. Per RMC 4-6-060, the minimum right of way width for a residential access street is 53 feet. The minimum paved roadway width is 26 feet which includes 2 – 10-foot travel lanes and 1 – 6-foot parking lane. A 0.5-foot curb, 8-foot planter, and 5-foot sidewalk are required along both sides of the roadway. The required intersection turning radius is 25 feet when intersecting with another residential access street and 35 feet when intersecting with an arterial street. Street grades shall not exceed 15%. 164th Ave SE has a current right of way width of 60 feet, therefore no dedication shall be required. 4. SE 132nd St is classified as a residential access road. Per RMC 4-6-060, the minimum right of way width for a residential access street is 53 feet. The minimum paved roadway width is 26 feet DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB Skyhorse Short Plat – LUA21-000154 Page 5 of 6 May 11, 2021 which includes 2 – 10-foot travel lanes and 1 – 6-foot parking lane. A 0.5-foot curb, 8-foot planter, and 5-foot sidewalk are required along both sides of the roadway. The required intersection turning radius is 25 feet when intersecting with another residential access street and 35 feet when intersecting with an arterial street. Street grades shall not exceed 15%. a. Right of Way dedication of 30 feet is required for a future extension of SE 132nd St east of 164th Avenue SE to the eastern property boundary. b. Applicant is required to construct frontage improvements throughout SE 132nd St. However the city staff has recommended a fee in lieu option for the portions of SE 132nd St that are located east of 164th St since the full extension of the roadway to the east is not anticipated in the near future and there are no lots fronting on the proposed right of way. 5. Street lighting is required along all public street frontages. Required streetlights shall be per City standards. 6. Per RMC 4-4-080, the maximum width of a single loaded garage driveway is 9 feet and the maximum width of a double loaded garage driveway is 16 feet. If a garage is not present, the maximum driveway width is 16 feet. Driveways shall not be closer than 5 feet to any property line. 7. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Restoration and Overlay requirements. GENERAL COMMENTS 1. The fees listed are for 2021. The fees that are current at the time of the respective permit issuance will be levied. Please see the City of Renton website for the current development fee schedule. 2. All Utilities along the property frontages are required to be underground. 3. Retaining walls that are 4 feet or taller from bottom of footing and stormwater detention vaults will require a separate building permit. Structural calculations and plans prepared by a licensed engineer will be required as part of the building permit review. 4. All civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can be found on the City of Renton website. 5. A separate plan submittal will be required for a construction permit for utility work and street improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington. 6. Please see the City of Renton Development Engineering website for the Construction Permit Application and Construction Permit Process and Submittal Requirements. Please contact the City to schedule a construction permit intake meeting. 7. All plan review for the City is now paperless. Please see http://rentonwa.gov/paperless/ for more information. DocuSign Envelope ID: C5B0EE39-D9D4-4099-9E6F-8C84393AD0AB