HomeMy WebLinkAboutMFP21002502.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21002502
IVR Number: 21002502
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:06/02/2021Application Date:0886610010Parcel Number: 780 LOGAN AVE N
Permit Type:06/16/2021Issue Date:Franchise
Permit Work Class:06/16/2022Expiration Date:Minor Utility
Job Number: 107060778Franchise Type:Natural Gas
Description: PSE Gas CREW TO TIE INTO EXISTING 6" MPE IP MAIN AND INSTALL 65' 4" PE IP MAIN. INSTALL GAS SERVICE
OFF MAIN, APPROX 6' IN ROW.
PRE CONSTRUCTION MEETING REQUIRED
RESTORATION PER CITY OF RENTON STANDARDS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
107060778
780 LOGAN AVE N
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
SHANNON MOORE SHANNON.MOORE@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21002502
Scott Warlick CED 6/16/2021
Monday - Friday 8:00AM - 3:00PM
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
780 Logan Ave N Renton WA 98057 USAN 8TH STLOGAN AVE NN 8TH
ST
LOGAN AVE N
121211111111111111151111121212 111111POLICEUPO
ARRW-BRD
RIGHT LANECLOSEDAHEADW20-5R
W4-2LROADWORKAHEADW20-1 350'350'350'W20-7ABEPREPAREDTOSTOP
W3-4 350'350'W12-1THRUTRAFFICMERGELEFTW4-7L100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'W20-7AROAD
WORK
AHEAD W20-1BEPREPARED
TO
STOP W3-4100'100'100'S/W
CLOSEDR9-9CROSSWALKCLOSEDR9-3DETOURM4-9b
CROSSWALKCLOSEDR9-3DETOURM4-9bDETOURM4-9bDETOUR M4-9bDETOURM4-9bR9-11SIDEWALK
CLOSED
AHEADPLACE PDETOUR SIGNS ATCROSSWALK/ INTERSECTIONWEST/SOUTH OF PARK AVE N&N 8TH ST.TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 37' SCL of N 8th St & 48' ECL ofLogan Ave N, and 102' SCL of N 8th St & 25' ECL ofLogan Ave N.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/02/2021 1070607780780 Logan Ave N, Renton, WA 98055 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077MFP21002502
Est. Start Date:
&
&
&
MDPE - 2" IPS - (DIA) 1-1/4"IPS
Tie-In Fitting
YES Route #'s:Bollards:2.5" #4" #ADA Ramps #:
Del Press:5 PSI Traffic Signal:YES Bus Stop:NO
25 No Parks #:
Meter Loc:01 - OFR Trolley Lines:NO Mtr Hoods #:
Meter:D16000 Speed Limit:
New Commercial Main & Svc
EFV:2" - 10000 9998737 Police #:TCP:YES
Diameter:4" PE Flaggers #:Arterial:YES
of CL
Service Information Street Information Job Type
of CL LOGAN AVE N 3X5 GRASS
of CL
of CL LOGAN AVE N 3X5 CONCRETE
102'SOUTH of CL N 8TH ST 25'EAST
37'SOUTH of CL N 8TH ST 48'EAST
PLAT Map:207.082
N
Work Location Size of Cut Surface Type
Job Description / Scope of Work
TIE INTO 6" MPE IP MAIN, INSTALL 65' 4" PE IP MAIN. INSTALL 478' 4" PE SVC (6' SCAT STUB,
472' PLAT EXT). SET 4" RISER FOR IMO METER
New Construction:
Yes
Construction Method
All Scat / Trenchless
6/28/21 PM / Inspector:SHANNON MOORE 206-681-7086
Est. Duration:3 Days (24 Hours)
Jurisdiction:RENTON City / Zip:RENTON, 98057
ROW Permit:Yes Customer:ERIK SILVIS (331) 233-9462
Job #:107060778
Date:6/1/21 Address:780 LOGAN AVE N
Puget Sound Energy Gas Pre-Inspect Form
CL
LOGAN AVE N6" MPE IP 48'E 107026025-07 JT EOM 37'S
3' N
ROW 60 FT
780
NMaintain 5' of
separation between
utilities. Water
requires 10' of
separation
The city recommends
one of these 2
options so that we
can stay away from
King county's sewer
main.
Coordiante with City inspector Brad Stocco for
this work (425)-282-2373. Pre-Construction
meeting with Brad required prior to start of work.
RESTORATION PER CITY OF RENTON STANDARDS
LOGAN AVE N116'N
6" MPE IP 116'N
107026025-2007
6" MPE IP 48'E 107026025-2007 JT6" MPE IP 48'E
107026025-2007 JT
6" MPE IP 36'N 107026025-2007 JT
2" MPE2008
2" MPE
2008
2"
2" MPE2007
49'N
119'N38'E3'N
58'N
60'N
289'E500' W550'E396' E125' N
5 4 'N ,4 8 'ER O P E S68'N ,4 0 'E19'W
37'S6" MPE IP 48'E
107026025-2007 JT
No electric grid information available
S204080, Q207082
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
06-01-2021
Scale 1:818
Lat\Long=47.4957, -122.2063
N 8TH ST