HomeMy WebLinkAboutEX06_C_Carlson_Comments_and_City_ReponseFrom: Jill Ding
Sent: Wednesday, May 26, 2021 10:02 AM
To: Thomas Carlson
Subject: RE: PR21-000178 Hardy Short Plat /LUA21-000169, SHPL-A
Thomas,
Thank you for your comments, your comments have been included in the official file for consideration
by the decision maker and you have been added as a party of record for this project.
Regarding your comments on ground water drainage, that is something that we will be reviewing as part
of the development review process. The City has adopted the 2017 City of Renton Surface Water Design
Manual, which this project will be required to comply with. The applicant submitted a drainage report
(Technical Information Report) with their project application materials. According to their submitted
report a Stormwater detention vault is proposed to be installed within the new driveway to collect
surface water generated from the development proposal. The project file is available online and can be
viewed here if you would like more information.
Thanks,
Jill Ding
Senior Planner
City of Renton
Community and Economic Development
6th floor
1055 S Grady Way
Renton, WA 98057
425-430-6598
jding@rentonwa.gov
COVID-19 UPDATE
City Hall is currently closed to the public but we are still available to assist you.
· Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal
· Schedule an Inspection: Permitting Portal -OR- Building: 425-430-7202; Civil/Site: 425-430-7203
· Contact Staff:
o Building or General Permitting: permittech@rentonwa.gov or 425-430-7200
o Planning: planningcustomerservice@rentonwa.gov or 425-430-7294
o Public Works Permitting: pwpermitting@rentonwa.gov or 206-402-8626
o Code Compliance: Renton Responds or 425-430-7373.
From: Thomas Carlson <athomascarlson@gmail.com>
Sent: Thursday, May 20, 2021 3:00 PM
Exhibit 6
DocuSign Envelope ID: 12C60CAF-B0E5-4C9F-B07F-927519CCDB4B
To: Jill Ding <JDing@Rentonwa.gov>
Subject: PR21-000178 Hardy Short Plat /LUA21-000169, SHPL-A
Jill Ding, Senior Planner, CED
Dear Ms. Ding,
I am responding to the Notice of Application concerning the development of 857 Field Ave NE.
A portion of our property borders the southwest corner of the above property. How will this
proposed construction affect the ground water drainage for those of us with property on the
downward slope below this property? We are concerned about more land being covered with
buildings and driveways. When a very large home was built and areas paved on Field Ave. by
the Mormon Tabernacle, we noticed our property developed streams of water flowing down to
the street from October through February before it could soak into the ground. This is not
healthy nor does it enhance our property in any way. We feel building more structures on 857
Field Ave. NE will only make matters worse. Consideration should be given to the issue of
ground water in this area. Please take this into consideration in your decision making.
We would like to be made a party of record and receive information at
athomascarlson@gmail.com.
Respectfully yours, A. Thomas Carlson
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.