Washington State Department of Transportation
Supplemental Agreement
Number 2
Original Agreement Number
CAG-19-274
Project Number
32468
Project Title
Lake Washingto n Loop Trail
Description of Work
Organization and Address
DGK, Inc.
1902120th Place SE, STE 202 Everett, WA 9820 8
Phone: 425 -41 8-7162
Execution Date Completion Date
September 27, 2019 December 31, 2025
New Maximum Amount Payable
$48,837.60
The scope of work for the ag reeme nt includes weekly inspectio n, assistance with NPD ES ov ersight, review of enviro nme ntal plans,
respo nses to RFI's, and assistance with enviro nme ntal compliance o n the Lake Washingto n L oop Trail proj ect.
The Local Agency of --=C=ity�o-=-f =R=en=t=on�----------------------------
desires to supplement the agreement entered in to with _D _G�K�In_c _. ________________ _
and executed on September 27, 2019 and identified as Agreement No. --=C=-A=G=--·-=-19"--=2_,_74-'------------
AII provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
See Exhibit B-2
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read: ""'D'""'e"""ce=m=b"-'e"'"r -=-3 =1 -=2=0=25'-----------------------
111
Section V, PAYMENT, shall be amended as follows:
Basic agreeme nt amount $34,993.20. Suppl eme nt 1 time extensio n. Suppl ement 2 in the amount of $1 3,8 44.40 makes new co ntract amount $48,837.60
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By:_J_e _an _e _tt _e _C _ow_lin _g _W_i d_e _ne _r _________ _
DOT Form 140-063
Revised 09/2005
c� Consultant Signature
�
Martin Pastucha, Public Works Administrator
DocuSigned by:
Martin Pastucha
e!!e 131 FElaeM4aE,. Approving Authority Signature
6/14/2021 I 2:40 PM PDT
Date
CAG-19-274, Adden #2-21
Basic Agreement
Supplemental Agreement No. 1
Time Extension
Supplemental Agreement
No. 1
Services during
construction Total
Direct Salary Cost 13,854.00$ 0 5,456.00$ 19,310.00$
Overhead 15,239.40$ 0 6,001.60$ 21,241.00$
Direct Non- Salary Cost 5,899.80$ 0 2,386.80$ 8,286.60$
Fixed Fee 0 -$
Total 34,993.20$ 0 13,844.40$ 48,837.60$
Exhibit A-2
Summary of Payments
Exhibit B-2 Scope of Work
Lake Washington Loop Trail
Environmental Services for Construction
PROJECT UNDERSTANDING
The Lake Washington Loop Trail project (TIP No. 18) construction has a duration of 60
working days. Project limits are from the Logan Avenue North Cedar River Trail junction
to the intersection of Rainier Avenue South and Airport Way. Improvements include a
bike track, pedestrian ramps, signage and pavement markings, and upgrades to an
existing traffic signal.
This scope of work provides for the ongoing environmental compliance reviews of the
project during construction. The work will be performed in accordance with the WSDOT
LAG manual. The following tasks identify the work needed:
TASKS:
1. Provide weekly inspections and assistance in NPDES oversight with the CM team
to assure contractor compliance with the City s NPDES permit.
2. Provide CESCL inspection services as needed for all utility work on the project that
is not covered by the contractor.
3. Respond to co g environmental issues and commitments.
4. Update environmental documentation as needed to address construction
changes or issues.
5. Make recommendations for environmental compliance.
DELIVERABLES
1. Notes and email recommendations or correspondence.