HomeMy WebLinkAboutAdden 2DocuSign Envelope ID: 78B0B3A0-75AD-47A0-AA27-ACF9FB7F5D5E Washington State Department of Transportation Supplemental Agreement Number 2 Original Agreement Number CAG-19-274 Project Number 32468 Project Title Lake Washingto n Loop Trail Description of Work Organization and Address DGK, Inc. 1902120th Place SE, STE 202 Everett, WA 9820 8 Phone: 425 -41 8-7162 Execution Date Completion Date September 27, 2019 December 31, 2025 New Maximum Amount Payable $48,837.60 The scope of work for the ag reeme nt includes weekly inspectio n, assistance with NPD ES ov ersight, review of enviro nme ntal plans, respo nses to RFI's, and assistance with enviro nme ntal compliance o n the Lake Washingto n L oop Trail proj ect. The Local Agency of --=C=ity�o-=-f =R=en=t=on�---------------------------- desires to supplement the agreement entered in to with _D _G�K�In_c _. ________________ _ and executed on September 27, 2019 and identified as Agreement No. --=C=-A=G=--·-=-19"--=2_,_74-'------------­ AII provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: See Exhibit B-2 II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: ""'D'""'e"""ce=m=b"-'e"'"r -=-3 =1 -=2=0=25'----------------------- 111 Section V, PAYMENT, shall be amended as follows: Basic agreeme nt amount $34,993.20. Suppl eme nt 1 time extensio n. Suppl ement 2 in the amount of $1 3,8 44.40 makes new co ntract amount $48,837.60 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:_J_e _an _e _tt _e _C _ow_lin _g _W_i d_e _ne _r _________ _ DOT Form 140-063 Revised 09/2005 c� Consultant Signature � Martin Pastucha, Public Works Administrator DocuSigned by: Martin Pastucha e!!e 131 FElaeM4aE,. Approving Authority Signature 6/14/2021 I 2:40 PM PDT Date CAG-19-274, Adden #2-21 Basic Agreement Supplemental Agreement No. 1 Time Extension Supplemental Agreement No. 1 Services during construction Total Direct Salary Cost 13,854.00$ 0 5,456.00$ 19,310.00$ Overhead 15,239.40$ 0 6,001.60$ 21,241.00$ Direct Non- Salary Cost 5,899.80$ 0 2,386.80$ 8,286.60$ Fixed Fee 0 -$ Total 34,993.20$ 0 13,844.40$ 48,837.60$ Exhibit A-2 Summary of Payments Exhibit B-2 Scope of Work Lake Washington Loop Trail Environmental Services for Construction PROJECT UNDERSTANDING The Lake Washington Loop Trail project (TIP No. 18) construction has a duration of 60 working days. Project limits are from the Logan Avenue North Cedar River Trail junction to the intersection of Rainier Avenue South and Airport Way. Improvements include a bike track, pedestrian ramps, signage and pavement markings, and upgrades to an existing traffic signal. This scope of work provides for the ongoing environmental compliance reviews of the project during construction. The work will be performed in accordance with the WSDOT LAG manual. The following tasks identify the work needed: TASKS: 1. Provide weekly inspections and assistance in NPDES oversight with the CM team to assure contractor compliance with the City s NPDES permit. 2. Provide CESCL inspection services as needed for all utility work on the project that is not covered by the contractor. 3. Respond to co g environmental issues and commitments. 4. Update environmental documentation as needed to address construction changes or issues. 5. Make recommendations for environmental compliance. DELIVERABLES 1. Notes and email recommendations or correspondence.