Loading...
HomeMy WebLinkAboutCOR_STD_PLAN_106 (Addendum 4)PATCHED AREA i A q COVER COVER PER STD PLAN 401 SEE NOTE 9) SEAL WITH AR 4000 OR APPROVED EQUAL AND DRY SAND AFTER P L A N PATCHING NTS OUTSIDE DIAMETER OF SEE NOTE 9) ADJUSTMENT RING AND x SEE NOTE 2 X gOTTOM OF FRAME t---- MORTAR JOINT(S) (3/8" MIN.-2" MAX.) ADJUSTMENT RING (1" MIN.). SEE SEE NOTE 3 AND SPECIAL PROVISION NOTE 6. 7-05.3(1). SECTION A-A NOTES 1. REMOVE PAVEMENT AND BASE MATERIALS FOR A DISTANCE 5. CONSTRUCTION AND ADJUSTMENT SHALL BE PERFORMED WHICH IS EQUAL TO THE DIAMETER OF THE FRAME PLUS ONE ONLY BY A JOURNEYMAN MASON. FOOT(MIN.). ADJUST CASTING FRAME TO PAVEMENT SURFACE USING RISER RINGS AND MORTAR. 6. ADJUSTMENT OF THE FRAME TO GRADE SHALL BE ACCOMPLISHED WITH ADJUSTMENT RINGS AND MORTAR ONLY. 2. REPLACE EXCAVATED MATERIAL WITH A MINIMUM OF 8"OF THE USE OF SHIMS IS PROHIBITED. HMA CLASS"PG 64-22(OR TO A DEPTH THAT S 2"BELOW THE BOTTOM OF THE UPPER ADJUSTMENT RING WHICHEVER 7• FRAME SHALL BE ADJUSTED TO PAVEMENT GRADE BY IS GREATER)OR AS APPROVED BY THE ENGINEER. TAPPING UNTIL FRAME IS FLUSH WITH PAVEMENT AS DETERMINED WITH A STRAIGHT EDGE OF SUFFICIENT LENGTH. 3. ADJUSTMENT RINGS AND FRAME SHALL BE FULLY BEDDED IN MORTAR.MORTAR SHALL BE ASTM C270 FOR TYPE S. 8. ALL MORTAR JOINTS SHALL BE TRIMMED FLUSH AND REMAIN VISIBLE UPON COMPLETION. 4. MORTAR SHALL BE MIXED AND APPLIED PER MANUFACTURERS DIRECTIONS. 9. X=1'-0"MIN.TO 2'-6"MAX.-PER ENGINEER'S INSTRUCTION STD. PLAN - 106 j PUBLIC WORKS TY'CAL CONSTRUCTION A ROVED: al' DEPARTMENT AND ADJUSTMENT OF flMANNOLERISER3 e o r>tor DA E