HomeMy WebLinkAboutP_MAP_Site_and_Detail_Map_210623_v1C e d ar Riv er
Left Bank Floodwall
(Accessible from E Perimeter Road)
Left Bank Floodwall
(Requires access from airport gate)
South Boeing Bridge
DO NOT CROSSRainier Ave NLogan Ave NW Perimeter RdN 6th StE Perimeter RdWilliams Ave NAirport Way Burnett Ave NNishiwaki LnTaylor Ave NWHardie Ave NWN 4th St
N
1
st
S
t
NW 5th St Burnett Aly NWilliams Aly NN 8th St
NW 4th Pl
NW 4th St
Nelson Pl NWN 5th StTaylor Ave NWBurnett Aly N±400 0 400200 Feet
Cedar River Vegetation Maintenance
Schedule B - Inspection Path Clearing
Figure L-13
Work Description:
Brush a 4-ft inspection path behind the
floodwalls on the riverside. Remove
shrubs and vegetation directly in the 4-ft
path. Either hand pull stem and roots, or
cut and remove stems and apply
glyphosate or other approved herbicide
to cut stems. Also cut any branches that
may hang over the 4-ft path from the
river bank.