Loading...
HomeMy WebLinkAboutTCS - 2/15/2017 �_ Washington State Contractor's Daily Report of VI/ Department of Transportation p Traffic Control - Summary lllAl/VIIIVIIVIIIIIIlVIVIIIIIIIIIIIIIIIdIIIIIIVIIIIIUIVIIIVIIYIIIIII '03853 709.3-TCS 02/15/2017" Page One Co tr ct Number SR Number Day Date f Photos /Videos taken today for record? ❑Yes ;ZliD- If Yes, note locations: 61 3 Summary of T-CS Activities 5 Contr to Contr or' Tra Control S ervisor's Oignature Comments To be Completed by Contractors Traffic Control Supervisor(TCS) DoT Form 421-040A EF Distribution: White-Contractor:Canary-Project Engineer Revised 412004 M-I/ Washeviton State Contractor's Daily Report of Traffic °eparcment of hallw4pe stion Control - Traffic Control Log Use separate sheets for each setup. (May be altered to record Class A signs.) Page Co tract Number SR Number Day Date II _ I Sta A Setup Sta B Legend Station — Time Station — Time (List of Signs Used) 5 O 93 <3> O&ft- 56 i rQh LAS 0 — — Cones Piloted O b `Y E]No ❑ Yes 5°�( i?�� — Per Approved Plan S PP Plan Title 50'ul- PLYZ El No Sta G T One Way Traffic Flagger/SpotterSta Start End Hours I (one or more lanes) Sta D Station A Two Way Traffic Station B (two or more lanes) Station C Sta on D Other Traffic Control Labor Name Start End Hours 4 ontr ct Con ra or' raffic Control Supervisor's Signature Type of Traffic Control Time Set Up Time(s)Checked Time Removed IU S To be Completed by Contractor's Traffic Control Supervisor(TCS) DOT Form 421-0408 EF Distribution: White-Contractor;Canary-Project Engineer Revised 032008 -