Loading...
HomeMy WebLinkAboutMFP21002255.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21002255 IVR Number: 21002255 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/19/2021Application Date:1437650040Parcel Number: 857 FIELD AVE NE Permit Type:07/07/2021Issue Date:Franchise Permit Work Class:07/07/2022Expiration Date:Minor Utility Job Number: 105096918Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW. INSTALL SERVICE TO LOT 1 AND 2. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL WENZL ALEXANDER D 857 FIELD AVE NE RENTON , WA 98059 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 105096918 857 FIELD AVE NE Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 JESSE DOUCET JESSE.DOUCET@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21002255 Scott Warlick CED 7/7/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG V01 HH PLACE 72HRS IN ADVANCE NO PARKINGFROM TO TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 SHOULDER WORK W21-5 UTILITYWORK AHEAD W21-7 UTILITYWORKAHEAD W21-7 UTILITYWORK AHEAD W21-7 UTILITY WORKAHEAD W21-7 FIELD AVE NE FIELD AVE NE NE 9TH ST NE 9TH ST 857 NOTES: 1. MAINTAIN PED. ACCESS TO AND THROUGH CROSSWALKS 2.MAINTAIN MIN 11' LANES 3.MAINTAIN LOCAL ACCESS 4.NOTIFY TRANSIT AUTHORITY AT LEAST 48HRS. IN ADVANCE OF BUS STOP CLOUSRE 5.TRAFFIC CONTROL PLAN AND DEVICES SHALL COMPLY WITH MUTCD, PROWAG &WSDOT 6.DEVICE SPACING FLAGGER TAPER 20' SIGNS PER WSDOT TAPERS PER WSDOT 7.28" CONES 36" BARRELS 48" SIGNS 24" PADDLE 8.ADJUST TO FIELD CONDITIONS PLEASE SCHEDULE WITH DISPATCH @800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE NOT TO SCALE K&D SERVICES , AS THE PREPARER OF THIS TRAFFIC CONTROL PLAN MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION & IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THAT APPROVAL. REF. MUTCD 2009 6A-O1(10) Legend cone NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39 SHOULDERWORK W21-5 shoulder work UTILITYWORKAHEAD W21-7 utility work ahead Work Truck OFFICE: 800-343-4049 CELL: 425-530-9162 WATCP@KNDSERVICES.NET CUSTOMER: CONTACT: LOCATION: DATE:W/O # PSE JESSE DOUCET 206-573-3576 857 FIELD AVE NE RENTON, WA 05/03/21 DESIGNED BY: ISAIAH MARTINEZ WSTCS#011748 105096918 Manifest 15 x cone 9 x Sign Stand 4 x W21-7 utility work ahead 2 x truck 1 x No Parking R7-T39 1 x W21-5 shoulder work www.invarion.com MFP21002255 906907482286385849044905860854848852851NE 9TH STFIELD AVE NEROW60'ROW56'LOT 2TRACT ALOT 1318430-167385318405-16738550 kVA 120/240V (B)318416-16739215 kVA 120/240V (B)318430-167392SLAH3571318431-167387UNK (ERROR-SET FUSE)PRE14J780774768762756318405-16738550 kVA 120/240V (B)CUSTOMER SUPPLIED5'6" X 4'5" WORK PITPSE INST. 1-RUN 350 UG TPX ± 110'PSE INSTALLED1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 95'PSE INST. 1-RUN 4/0 UG TPX ± 85'PSE INSTALLED1-3" DB-120 CONTINUOUS PVC CONDUIT ± 80'CUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PITPSE INST. 1-RUN 4/0 UG TPX ± 50'CUSTOMER SUPPLIED1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 35'3/4" CUBIC YARD SANDCUSTOMER SUPPLIEDFIELD AVE NEWALKROW60'36'6'TRACT A18'6'318405-16738550 kVA 120/240V (B)SITE PLANSCALE: 1" = 50'JOB SITEPOWER GENERAL NOTES - RESIDENTIAL PROJECT7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, oras required by your local municipality.All work is to be done in accordance with local municipal and county permit requirements as applicable.Inclement weather conditions may cause delays in construction times and dates.8.9.CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT M01-REQUIRED TO PROVIDE 5'6" X 4'5" WORK PIT AT HH1TRENCHING & CONDUIT.-INSTALL ± 35' OF 1-3" DB-120 GREY PVC CONDUIT FROM HH1 TO M01.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .NVicinity MapN/AARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.JOB SITEASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYERPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)NEW CABLE & CONDUIT DIAGRAMNOT TO SCALE10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.001"2"0050'100'SITE SPECIFIC NOTESAT V01: 318405-167385-EXISTING VAULT & TRF TO REMAIN-CONNECT NEW #350 UG TPLX SECAT HH1:-INSTALL (1) 17"x30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350)-INSTALL (3) 6-POS FARGO BARSM01 AT "LOT 1": NEW METER BASE-INSTALL 200A METER___SPAN SPECIFIC NOTESV01 TO HH1:-INSTALL 1-3" DB-120 GREY PVC 95' ___' ACTUAL-INSTALL 1-RUN 350MCM UG TPX, ± 110' ___' ACTUALHH1 TO LOT 1 (M01):-INSTALL 1-RUN 4/0 UG TPX, ± 50' ___' ACTUALHH1 TO LOT 2:-INSTALL 1-3" DB-120 GREY PVC 80' ___' ACTUAL-INSTALL 1-RUN 4/0 UG TPX, ± 85' ___' ACTUALCIRCUIT FEET ADDED: 0'AT LOT 1SQ. FOOTAGE: 3,000 SQ FTPANEL SIZE: 200AHEAT TYPE: GASEST. DEMAND: 9.8kWLRC: 140A% V. DROP: 1.4%% FLICKER: 2.4%AT LOT 2SQ. FOOTAGE: 3,000 SQ FTPANEL SIZE: 200AHEAT TYPE: GASEST. DEMAND: 9.8kWLRC: 140A% V. DROP: 1.5%% FLICKER: 3.3%PARTIAL PLAN DETAILSCALE: 1" = 20'NOT TO SCALECROSS SECTION - FIELD AVE NELOOKING NORTHE60' ROWCLWOwner / Developer Contact InfoofficeATTN:TUSCANY CONSTRUCTION LLCPO BOX 6127 BELLEVUE, WA 98008BOB WENZL206-714-6707105096918GASPHONECABLE TVN/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorServiceE-Mail:Cell Phone:Project Manager Contact Information:Manager:JESSE DOUCET206-573-3576JESSE.DOUCET@PSE.COMUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJ. DOUCET206-573-35764/2/21J. DOUCET206-573-35764/2/21S. FOX714-893-24054/2/21N/ARENTONHARDY SHORT PLATSEC L/E, INSTALL HH857 FIELD AVE NE, RENTON, WA 98059N/AN/AN/A105096918AS NOTED1 OF 2KINGN/AN/ACSPSKEPMNW 10-23N-05EN/AN/A2305E0382305E0402305E038PRE-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A105096918510698630___OVERHEAD CIRCUIT MAP 2305E040SCALE: 6" = 1 MILECIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEPRE-1406/2020391.33442.50417.000.001.180.00391.33443.68417.00MFP21002255POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)105096918UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJ. DOUCET206-573-35764/2/21J. DOUCET206-573-35764/2/21S. FOX714-893-24054/2/21N/ARENTONHARDY SHORT PLATSEC L/E, INSTALL HH857 FIELD AVE NE, RENTON, WA 98059N/AN/AN/A105096918AS NOTED2 OF 2KINGN/AN/ACSPSKEPMNW 10-23N-05EN/AN/A2305E0382305E0402305E038PRE-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APSE 1730 POLYETHELYNE HANDHOLEPLAN VIEW2"APPROX30"APPROX17"ELECTRIC4' - 5"PENTABOLTLOCK COVER5' - 6"18"SIDE VIEW4" X 4"KNOCKOUT(2 PLACES)APPROX 27"APPROX 40"20"CONDUITS ENTER FROM BENEATHAT ONE END OF HANDHOLESINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAILNot to scaleFLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS.6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200TV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverBackfill for ConduitFree of rockslarger than 8"in diameterSeparation12" Minin ConduitSchedule 40 Yellow PVCGas Service Line32" Typical(Power, Gas,Phone & Cable)Separation12" Min12" MinSeparation36" MINIMUM COVERIN RIGHT OF WAY JOINT TRENCH DETAILJoint Service Line in Conduit (NTS)To Excavated Dirt PileBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.CUSTOMER POST, METERBASE, AND PANEL6' MAX5' PREFERRED4' MINPSE STUBOUTSTUBOUT CONDUITCOVERING THETEMPORARYCONNECTION26"CUSTOMER OWNEDTEMPORARY SERVICECONDUCTORS4'PSE CONDUCTOR4'METER DETAIL @ M01SCALE: NONE32"Typical24"Min24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulatorGas MeterAssembly48"4'8"Service (Permanent Detail:)Not to ScaleConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line Conduit3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. Mtr VentUtility ProvidedSeal24"-36"TEMPORARY METER DETAIL @ M01SCALE: NONEMFP21002255