Loading...
HomeMy WebLinkAboutR-413717IF 1 W TOFA�T TOFA \--------- ------ -- __ _ — _ -��- ziI I I I I I I I I I _--- I, TAXIWAY B I _ I � I / I I FA U U��ROFA �1 I I / 11 F R A ��� RO / — ROFA (U) ROFA (U) I � ROFA (U) — � ROFA (U) I I I N: 181662.59 0 35' I —TOFA TO FA E: 1299219.75 voFA-- —TOFA I TOFA - - — A I I TOFA TOFA — � e IA N: 181697.95 \ , L _ E: 1299216.89 Lij STALL z I A-7 0 Q � I z_ �I Izl C I C O I z I I J I I = B- 200 I �I I I rp BLAST FENCE CP 204 Z SCRIBE SET— N: 181665.03 E: 1299249.87 L BLDG 5-103 77�� N: 181671.01 E: 1299272.7! 200' SSB N: 181677.93 N: 181676.52 E: 1299419.86 CP 219 I ---Z MAG SET —N: 181700.42 E: 1299247.16 __—N: 181704.59 E: 1299298.29 �200' SSB �B I N: 181699.69 E: 1299349.01 TAXIWAY B (� x� x� x� _.owl01 SSB X—X�x— �' NpONt� 3 2A AB --- — _ SSB N: 181675.82 E: 1299427.95 N: 181680.55 seE: 1299427.55 g �" 1 BLDG � — � ♦♦/ 5-36 ♦ o BLDG 00 op ow so IN COMPLIANCE WITH CITY OF RENTON STANDARDS CP 16420 ♦ ♦ Z FND PKW DHA-63 Z r D �CP 205 1N Z PKW DC uHW SYM REVISION BY APPROVED ORIG 737 MAX FLIGHTLINE UTILITIES -APRON A CI PROJECT RT TWN - CITY OF RENTON PERMIT REVIEW COMMENTS RT TWN - APRON A CI PROJECT - SITE DCN-01 RT TWN - APRON A CI PROJECT - SITE DCN-02 RT TWN - APRON A CI PROJECT - SITE DCN-03 RT TWN DATE SYM REVISION 04.13.16 - APRON A CI PROJECT - SITE DCN-06 05.23.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES 06.13.16 - APRON A SITE STORMWATER IMPROVEMENTS-30% 07.19.16 - APRON A SITE STORMWATER IMPROVEMENTS-60% TO IFC 08.05.16 - APRON A SITE STORMWATER REVISIONS PER CITY COMMENTS D D � �Zm TSA, BY APPROVED DATE RT TWN 09.27.16 RT TWN 10.28.16 RT TWN 01.17.18 RT TWN 07.14.20 RT TWN 09.29.20 SD D o 0 x Q� BOE/A/Gm C'- 20 10 0 10 20 40 so 00 00 00 ,� TELEPHONE TRUNK LINE PER�ME� ER R�A� E• A C1A� W -�ERW A`( MME R R RAVER �EDA APRON A PLAN SCALE: 1:20 ISTF NAL ... CONSTRUCTION NOTES PAINT 4" WIDE WHITE PAINT LINE PER DETAIL C 503 ©PAINT NO PARKING MARKING PER DETAIL :!:S 503 %__i GENERAL NOTES: PAVEMENT MARKINGS LIMITS SHALL BE FIELD VERIFIED BY BOEING CONSTRUCTION MANAGER PRIOR TO PLACEMENT. ALL PAINT MARKINGS SHALL BE REPLACED IN KIND TO MATCH EXISTING CONDITIONS. REPLACEMENT OF EXISTING PAVEMENT MARKINGS OUTSIDE OF THOSE SHOWN IN THE CONTRACT DOCUMENTS DAMAGED DURING CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AS DIRECTED BY THE BOEING CONSTRUCTION MANAGER. I DATUM NOTE: PLANS PREPARED USING NGVD 29 AS THE VERTICAL DATUM. TO CONVERT TO NAVD 88 ADD 3.556 FEET TO ALL ELEVATIONS. OHW DRAWN DATE SUBTITLE ACCEPTABILITY R. TEMPLADO 09.29.20 PAVEMENT MARKING PLAN THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED T. NEU 09.29.20 KEY PLAN z SCALE: N.T.S. PERMIT SUB DESIGN BY DOWL MITTAL DATE 09.29.20 BOWL REVISION SYMBOL W5184605 ENGINEER TITLE APRON A -SITE STORMWATER IMPROVEMENTS STALLS A3-A7) C226 APPROVED BY DEPT. DATE T. NEU 09.29.20 CHECKED D. MURATA 09.29.20 APPROVED SITE 05-YD APPROVED CIVIL MASTER RENTON, NIA DWG NO. 05-APRON-A-C226 09.29.20 ;E N0. C14 0 N N