Minor Franchise Permit: MFP21000823
IVR Number: 21000823
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:02/25/2021Application Date:1423910590Parcel Number: 12716 SE 166TH ST
Permit Type:03/12/2021Issue Date:Franchise
Permit Work Class:03/14/2022Expiration Date:Minor Utility
Job Number: 887036621Franchise Type:Natural Gas
Description: PSE Gas INVESTIGATE & REPAIR LEAK AT APPROX: 24' NCL OF SE 166TH ST & 27' WCL OF 128TH AVE SE.
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
887036621
12716 SE 166TH ST
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
COURTNEY ISBELL COURTNEY.ISBELL@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21000823
Scott Warlick CED 3/12/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG 2/25/21
#12716SE 167TH ST
S
E
1
6
6
T
H
S
T SE 165TH ST128TH AVE SE
128TH AVE SE1818 1818141414141414vSTOP
FLAGGER
STOP
FLAGGER STOP
FLAGGER W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840L=W S602PSEPUGETSOUNDENERGYJOB#January 15, 202188703662112716 SE 166th St, Renton, WAeduard.volianskyi@pse.comSHEET 1 of 1TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP21000823
VICINITY MAP
SCALE: 1"=50'
Federal Way, WA 98003
33400 8th Avenue So, Ste #205
C O N S U L T I N G E N G I N E E R S, LLC
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELECT ORDER NUMBER
C ISBELL 253-293-0216
CITY
12716 SE 166TH ST
RENTON, WA
COVER SHEET
POTELCO
887036621
ESM-887036621-PAV
1"=50'1/3
KING N/A N/A
N/A N/A N/A
PSE/POTELCO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
For contacts below dial 1-888-CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATIONS OF EXISTING FACILITIES
LEGEND
ABBREVIATIONS
887036621DATE: 6/2/2021
SCALE: 1"=50'
Sheet Index
Sht. No.Description
1
2
3
COVER SHEET
CURB RAMP DETAILS
STANDARD DETAILS
SHEET 3
"Locates Required"
"Flagging Required"
Yes No
Yes No
Cell Phone:
Project Manager Contact Information:
E-Mail:
Name:
253-293-0216
courtney.isbell@pse.com
COURTNEY ISBELL128TH AVE SESE 165TH
ST
SE 126T
H
PL
127TH AV
E
S
E
SE 166TH ST
06/04/2021
Federal Way, WA 98003
33400 8th Avenue So, Ste #205
C O N S U L T I N G E N G I N E E R S, LLC
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELECT ORDER NUMBER
C ISBELL 253-293-0216
N/A CITY
12716 SE 166TH ST
RENTON, WA
CURB RAMP DETAILS
POTELCO
887036621
ESM-887036621-PAV
1"=5'2/3
KING N/A N/A
N/A N/A N/A
PSE/POTELCO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
For contacts below dial 1-888-CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATIONS OF EXISTING FACILITIES
"Locates Required"
"Flagging Required"
Yes No
Yes No
Cell Phone:
Project Manager Contact Information:
E-Mail:
Name:
253-293-0216
courtney.isbell@pse.com
COURTNEY ISBELL
CURB RAMP #1
SPOT ELEVATION CHART
POINT ELEVATION
A *414.43 (@ FL)
B *414.00 (@ FL)
C *413.76 (@ FL)
D *413.52 (@ FL)
E *414.85
F *413.85
G 414.90
H 414.00
I 413.87
J 413.93
* MATCH EXISTING
CURB RAMP DETAILS
SCALE: 1"=5'
CURB RAMP #1
SCALE: 1"=5'
A
E
G
H
B
C
I
J
F
D
128TH AVE SESE 166TH ST
A
ADA MAXIMUM EXTENT FEASIBLE JUSTIFICATION
A
06/04/2021
1.5% or flatter
recommended for
design/formwork (2%
max)
Federal Way, WA 98003
33400 8th Avenue So, Ste #205
C O N S U L T I N G E N G I N E E R S, LLC
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELECT ORDER NUMBER
C ISBELL 253-293-0216
N/A CITY
12716 SE 166TH ST
RENTON, WA
STANDARD DETAILS
POTELCO
887036621
ESM-887036621-PAV
N/A 3/3
KING N/A N/A
N/A N/A N/A
PSE/POTELCO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
For contacts below dial 1-888-CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATIONS OF EXISTING FACILITIES
"Locates Required"
"Flagging Required"
Yes No
Yes No
Cell Phone:
Project Manager Contact Information:
E-Mail:
Name:
253-293-0216
courtney.isbell@pse.com
COURTNEY ISBELL
06/04/2021
RENTON
MFP21000823
RESTORATION PER CITY OF RENTON STANDARDS
1642516424164331643116428166056624127281661812732166081273616705127441271512740127071270112710127161266012654SE 166TH ST128TH AVE SESE 167TH ST2" STW IP 27'W 9300-19674" STW IP 25'W 68E2011" STW IP 10'S 9300-19674" STW 7'S2" STW 27'W4" STW 10'S4 " S T W IP 1 0 'W
9 3 0 0 -1 9 6 7 4" STW IP 10'S 9300-19674" STW IP 16'E 70E0171 1/4" STW IP 10'S 9300-19671/2" STW-U19681/2" STW-U19671/2" STW-U19681/2" STW-U19681/2" STW-U19681/2" STW-U19671/2" STW-U19681/2" STW-U19671/2"1/2" STW-U19681/2" STW-U19681/2" STW-U19671/2" STW-U19681/2" STW-U19683/4" STW-U19681/2" STW-U19671/2" STW-U19681/2"1/2" STW-U19681/2" STW-U19681/2"1/2" STW-U19681/2" STW-U19681/2" STW-U1968TFIF31'E10 'NIF24'N25 0 'W423'S624'N99'E
165'E167'E75'S44'S79'E12 8'E
1 30 'E165'N260'S6 78 'N
7 16 'N
3'E 235'W1 2 0 'W337'S134'E 672'S582'S76'S7'NPOWER CABLE DIRECTLY ONLINEOFMAIBON128AV.S.ENOTE-12000 VOLT UNDERGROUND2 4 'W
TL2 4 'W TL31'ETLTL24'NT4'N,31'E28'W4'N167'ES26'WP167'E D2305E136, R2305E109, A2305E109S212080, Q212085The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“02-13-2021Scale 1:900Lat\Long=47.4549, -122.1698MFP21000823